Fill Dirt Calculator

Raising a low corner of the yard, levelling ground for a shed, or backfilling around a foundation all come down to one multiplication — area times depth — plus two things beginners forget: loose fill shrinks when it is compacted, and a truckload is a weight limit as much as a volume. Order only the net volume and you end up short of finished grade after the first rain and the first compactor pass; order by volume alone on a big job and the truck that arrives may legally carry fewer yards than its box holds. This fill dirt calculator takes the area and depth in feet or metres, adds a compaction allowance you pick by soil type, and gives cubic yards, cubic metres and cubic feet, weight in US tons, tonnes and kilograms, truckloads at the truck size you choose, and a cost from your price per yard plus delivery. Fill dirt is the low-organic subsoil used to raise grade — for the planting layer on top of it use the topsoil calculator, for stone base layers the gravel calculator, for converting any volume the cubic yard calculator, and for beds and borders the mulch calculator.

Quick answer: For 100 sq ft filled 6 in deep: net volume = 100 x 0.5 / 27 = 1.85 yd3 (50 ft3, 1.42 m3). With the default 15% compaction allowance, order 2.13 yd3 (57.5 ft3, 1.63 m3), weighing about 2.60 US tons (2.36 tonnes) at the default mixed-fill density of 1.22 tons per yard — 1 tri-axle truckload at the default 12 yd3 truck size. At the same 100 sq ft, 3 in deep needs 0.93 yd3 net (1.06 yd3 ordered) and 12 in deep needs 3.70 yd3 net (4.26 yd3 ordered). One cubic yard covers 54 sq ft at 6 in deep, 27 sq ft at 12 in deep, and 108 sq ft at 3 in deep. In metric units, 10 m2 at 15 cm deep needs 1.50 m3 net (1.73 m3 ordered, 2.50 tonnes).
Circles use the diameter you enter as the length. Most fills are rectangles.
Longest side of the area — or the diameter for a circle.
Width of the area, same unit as length. Not needed for a circle.
How much you are raising the grade, on average. On uneven ground, measure the depth at several points and use the average — a low corner 12 in deep and a high edge 0 in deep averages 6 in, not 12.
Density sets the tons. Published fill-dirt weights run about 1.0-1.4 tons per yard dry-to-moist, and wet clay can reach about 1.5 — if your supplier prices by the ton, pick the preset closest to their figure.
Loose fill shrinks when spread and compacted, so order volume = net volume x (1 + allowance). Sandy fill settles least, clay-heavy fill most; deep or structural fills use the top of the range.
Truckloads = order yards / truck yards, rounded up. Weight limits often cap a load before the box is full — the results show tons per load so you can check the haulier's payload.
Your supplier's delivered or collected price per cubic yard, in dollars — leave blank to skip the material cost. If they price by the ton, convert with the tons-per-yard figure in the results.
A single flat delivery fee in dollars, if charged separately — leave blank to skip it. If the yard charges per load, multiply the fee by the truckload count first.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Fill Dirt Calculator

  1. Measure the area first: length times width for a rectangle, diameter for a circle. On uneven ground, measure the fill depth at several points and average them — the depth that matters is the average raise in grade, not the deepest hole.
  2. Enter the depth in inches or centimetres. A 6 in (15 cm) raise is a typical levelling job; 12 in (30 cm) is a serious regrade; anything deeper in one place should be built up in compacted lifts (see the tips), not dumped in one deep layer.
  3. Pick the fill dirt type closest to what your supplier delivers: sandy/loose, mixed (the default), or clay-heavy/wet. The type only changes the weight — the cubic yards are the same whatever you pick — but it decides whether a truckload is legal weight or overweight.
  4. Pick the compaction allowance by soil type: 10% for sandy fill, 15% for mixed fill (the default), 20-25% for clay-heavy fill. This is the step most short orders miss: net volume is the hole, order volume is the hole plus what compaction takes away.
  5. Pick the truck size that will actually arrive. The default 12 yd3 tri-axle is the midpoint of the commonly quoted 10-14 yd3 band; a small single-axle truck on a big job turns one delivery into many trips, and the results show the trip count so you can price that in.
  6. Read the order volume in cubic yards, cubic metres and cubic feet, then the weight in tons and tonnes and the truckloads with tons per load. If tons per load look high against the haulier's payload, the loads — not the yards — are what need re-planning.
  7. Enter your price per cubic yard and delivery fee for a delivered total, then take the yard and ton totals to the supplier: yards if they sell by the yard, tons if they sell by the ton, and truckloads if they charge delivery per load.

Fill Dirt Calculator formula

Area = length x width (rectangle) or pi x (diameter / 2) squared (circle). Net volume = area x depth. Order volume = net volume x (1 + compaction % / 100). Weight = order volume x density, where density is 1,300 kg/m3 for sandy/loose fill (about 1.10 US tons per yd3), 1,450 kg/m3 for mixed fill (about 1.22 tons per yd3), or 1,600 kg/m3 for clay-heavy/wet fill (about 1.35 tons per yd3); tons per yd3 = kg/m3 x 0.764554858 / 907.18474. Truckloads = order yd3 / truck yd3, rounded up. Cost = order yd3 x your price per yd3 + your flat delivery fee. Conversions are exact: 1 yd3 = 27 ft3 = 0.764554858 m3; 1 US ton = 2,000 lb = 907.18474 kg; 1 tonne = 1,000 kg = 1.10231 US tons. Example: 10 x 10 ft at 6 in, mixed fill, 15% allowance — net volume = 100 x 0.5 / 27 = 1.85 yd3 (50 ft3, 1.42 m3); order volume = 1.85 x 1.15 = 2.13 yd3 (57.5 ft3, 1.63 m3); weight = 1.63 m3 x 1,450 kg/m3 = 2,361 kg = 2.60 US tons (2.36 tonnes); truckloads at 12 yd3 = 2.13 / 12 = 0.18, rounded up to 1 load. Cost example: 2.13 yd3 x $30 per yd3 = $63.89 material + $75 delivery = $138.89 total.

Worked example

A 10 x 10 ft low area (100 sq ft) raised 6 in, mixed fill, 15% compaction allowance, 12 yd3 tri-axle truck. Step one — net volume: 100 sq ft x 0.5 ft = 50 ft3 = 50 / 27 = 1.85 yd3 (1.42 m3). Step two — order volume: 1.85 x 1.15 = 2.13 yd3 (57.5 ft3, 1.63 m3). Step three — weight: 1.63 m3 x 1,450 kg/m3 = 2,361 kg = 2.60 US tons (2.36 tonnes) at 1.22 tons per yard. Step four — truckloads: 2.13 / 12 = 0.18, rounded up to 1 load at 2.60 tons. Step five — cost at $30 per yard plus $75 delivery: 2.13 x $30 = $63.89 + $75 = $138.89.

Imperial version: the same 100 sq ft at 12 in deep needs 100 / 27 = 3.70 yd3 net and 3.70 x 1.15 = 4.26 yd3 ordered at 15%; at 3 in deep it needs 0.93 yd3 net (1.06 yd3 ordered). A 40 x 30 ft pad at 12 in needs 1,200 / 27 = 44.44 yd3 net and 44.44 x 1.15 = 51.11 yd3 ordered (62.46 tons at mixed density) — that is 11 loads in a 5 yd3 truck, 6 loads in a 10 yd3 truck, 5 loads in a 12 yd3 truck, 4 loads in a 14 yd3 truck and 3 loads in a 20 yd3 truck. A 10 ft diameter circle at 6 in needs 78.54 sq ft x 0.5 ft = 39.27 ft3 = 1.45 yd3 net and 1.67 yd3 ordered at 15%.

Metric version: a 5 x 2 m area (10 m2) at 15 cm, mixed fill, 15% allowance. Net volume = 10 x 0.15 = 1.50 m3; order volume = 1.50 x 1.15 = 1.73 m3 (2.26 yd3); weight = 1.73 m3 x 1,450 kg/m3 = 2,501 kg = 2.50 tonnes (2.76 US tons); truckloads at 12 yd3 = 1 load. A 10 x 5 m area (50 m2) at 20 cm needs 10.00 m3 net, 11.50 m3 ordered (15.04 yd3), 16.68 tonnes, and 2 loads at 12 yd3 each. One cubic metre covers 6.67 m2 at 15 cm deep, 10.00 m2 at 10 cm and 3.33 m2 at 30 cm.

Yards per 100 sq ft, at 15% compaction allowance:

Fill depthNet volumeOrder volume (15%)One yard covers
3 in (7.6 cm)0.93 yd31.06 yd3108 sq ft
6 in (15 cm)1.85 yd32.13 yd354 sq ft
12 in (30 cm)3.70 yd34.26 yd327 sq ft
18 in (46 cm)5.56 yd36.39 yd318 sq ft
24 in (61 cm)7.41 yd38.52 yd313.5 sq ft
Fill dirt vs topsoil. Fill dirt is the low-organic subsoil layer dug from below the topsoil: cheap, dense, and good for raising grade, levelling ground and backfilling — but nearly sterile, so it grows almost nothing on its own. Topsoil is the dark, organic-rich surface layer plants actually grow in. The rule is fill dirt below, topsoil on top: raise the grade with fill dirt, then finish planting areas with a topsoil layer sized by the topsoil calculator (4-6 in for a new lawn, 12 in for a raised bed). Never pay topsoil prices for grade fill, and never plant straight into fill dirt and expect a lawn.

Truck-size table — loads for a 51.11 yd3 order (40 x 30 ft at 12 in, 15% allowance):
TruckVolume per loadLoadsWeight per full load (mixed fill)
Small single-axle5 yd3116.11 tons
Single-axle8 yd37 (51.11 / 8 = 6.39, rounded up)9.78 tons
Tandem-axle10 yd3612.22 tons
Tri-axle (default)12 yd3514.66 tons
Tri-axle14 yd3417.11 tons
Large / semi20 yd3324.44 tons
Note the weight column: it is the volume capacity times 1.22 tons per yard, and it is why weight limits bite — a 20 yd3 box of mixed fill weighs about 24 tons, more than many trucks may legally carry, so the real load on that truck is smaller than the box. Confirm the haulier's payload before counting on the big-truck row.

Measurement tips

  • Average the depth, do not take the deepest point. A low corner 12 in deep with a high edge at grade averages about 6 in over the area — ordering at 12 in across the whole area doubles the order for dirt that has nowhere to go.
  • Compact in thin lifts, not one deep dump. Spread fill in 6-8 in layers and compact each layer before the next goes on — deep, uncompacted fill keeps settling for months (typically 3-12 months, clay slowest), and a slab or driveway over it settles with it.
  • Strip the organics first. Remove topsoil, roots and soft organic soil from under any fill that will carry weight — organic material rots, compresses and leaves voids. The stripped depth is extra fill: if you strip 6 in to reach firm ground, the fill depth grows by 6 in.
  • Order the compaction allowance, not the net volume. Loose fill delivered by the truck is fluffed up; spread and compacted it occupies less space. Sandy fill needs 10-15% extra, mixed fill 15-20%, clay-heavy fill 20-25% — and a second delivery costs more per yard than the allowance did.
  • Keep finished grade falling away from buildings. Fill that ponds water against a wall trades a low yard for a damp house — grade should fall away from the foundation, and never bury air bricks, vents or damp-proof courses under fill.
  • Check access before the truck arrives. A tri-axle truck is about 8.5 ft wide and 9-11 ft tall, and its raised bed reaches far higher — check gate width, overhead lines and branches, soft ground the truck could sink into, and where the load can actually be tipped.
  • Fill dirt below, topsoil on top. Never plant straight into fill dirt: finish lawns and beds with a topsoil layer (4-6 in for a new lawn, 12 in for a raised bed, per the topsoil calculator) or the plants will starve in sterile subsoil.
  • Ask the yard how they sell before you quote. Yards sell by the cubic yard, by the ton, or by the load — the results give all three, so convert with the tons-per-yard figure (1.22 for mixed fill) and compare delivered totals, not headline rates.
  • Keep a little spare, not a lot. One spare load on a small job is cheap insurance against a second delivery fee; a whole spare truckload on a big job is dirt you have to move twice. The compaction allowance already carries the spare — do not add a second one on top.

Common mistakes

  • Ordering the net volume. The single most common fill-dirt error: the hole measures 1.85 yd3, so 1.85 yd3 is ordered, and after spreading and compacting the finished grade sits about 15% low. Order volume is net volume plus the compaction allowance — 2.13 yd3 on the 100 sq ft at 6 in example.
  • Using fill dirt as topsoil. Fill dirt is low-organic subsoil: it holds grade well and grows almost nothing. A lawn or bed laid straight onto it fails slowly and expensively — the planting layer must be topsoil, sized separately.
  • Measuring depth at the deepest point only. A saucer-shaped low spot is shallow at the edges and deep in the middle; a single deep measurement over-orders, sometimes by double. Average several depth readings across the area.
  • Dumping a deep fill in one layer. Fill placed 2 ft deep in one go compacts at the top and stays loose underneath, then settles unevenly for months. Build deep fills in 6-8 in compacted lifts.
  • Counting truck box volume as delivered volume. A 20 yd3 box of mixed fill weighs about 24 tons, and legal payload limits often cap the load below the box volume — especially wet. Count loads from the haulier's actual payload, not the brochure box size.
  • Forgetting the stripped topsoil. Stripping 6 in of organics before structural fill adds 6 in to the fill depth across the whole area — on a 40 x 30 ft pad that is an extra 22.22 yd3 net (25.56 yd3 ordered at 15%) that a depth measured from the old surface misses entirely.
  • Burying drainage and vents under fill. Raising grade against a house can bury air bricks, cover damp-proof courses and reverse the fall of surface drainage. Check levels against the house before the first load arrives.
  • Comparing per-yard prices without delivery. A cheap per-yard rate with per-load delivery on an 11-load small-truck job can cost more delivered than a dearer yard with free delivery — compare delivered totals, and multiply per-load fees by the truckload count.
  • Confusing US tons and tonnes. A US ton is 2,000 lb (907 kg); a tonne is 1,000 kg (1.102 US tons). On a 51.11 yd3 mixed-fill order the difference is 62.46 US tons against 56.66 tonnes — quoting the wrong one to a yard that sells by weight mis-prices the job by 10%.

Factors that affect accuracy

  • Area measurement: every foot of error in length or width scales the whole order — a 40 ft pad measured as 42 ft over-orders by 5% before any allowance.
  • Depth averaging: uneven ground makes the average depth, not the maximum, the right input — and stripped organics add to it.
  • Soil type: sandy fill settles 10-15%, mixed fill 15-20%, clay-heavy fill 20-25% — and the same soil weighs more wet than dry, which changes tons and truck payloads without changing yards.
  • Compaction method: fills compacted in thin lifts with a roller settle far less after placement than fill dumped deep and left — the allowance assumes normal lift compaction, not a single deep dump.
  • Moisture: rain between delivery and compaction adds weight (wet clay can reach about 1.5 tons per yard) and can push a legal load overweight even when the volume fits.
  • Truck size and access: a big truck that cannot reach the site is not a delivery option — small-truck loads multiply trips, delivery fees and time, and soft or narrow access may force them.
  • Selling unit: yards, tons and loads are three prices for the same dirt — the cheapest headline rate is rarely the cheapest delivered total once delivery per load and weight conversion are applied.
  • Time: uncompacted fill keeps settling for roughly 3-12 months (sandy fastest, clay slowest), so finished grade, slabs and planting should wait for settlement or for proper lift compaction.
  • Underground services and boundaries: fill over buried lines, near boundaries or in flood areas can need permission and marking — the cost of a strike or a forced removal dwarfs the dirt.

Sources & assumptions

  • Density is a RANGE, never a single figure. Published fill-dirt weights run about 1.0-1.4 US tons per cubic yard dry-to-moist: Wisconsin Department of Transportation research (December 2023, natural-soil samples, via BunnyCorner's soil calculator write-up) measured loose in-place dry natural soil at 1,800-2,700 lb/yd3 (0.9-1.35 tons/yd3); QNL Engineering's stockpile tool gives common earth / fill dirt loose at 1.1-1.4 tons/yd3 (default 1.25); EarthDepot's fill-dirt estimating guide quotes fill dirt in Florida at about 1.21 tons/yd3; topsoil-calculator.com lists fill dirt at 2,000 lb/yd3 (1.00 ton/yd3); HelloGravel's dirt-tonnage guide puts dry fill dirt at about 1 ton/yd3, rising to about 1.5 tons when wet or compacted.
  • This tool's three density presets convert from kg/m3 as tons/yd3 = kg/m3 x 0.764554858 / 907.18474: sandy/loose 1,300 kg/m3 = 1.10 tons/yd3; mixed/typical 1,450 kg/m3 = 1.22 tons/yd3 (default, mid-range); clay-heavy/wet 1,600 kg/m3 = 1.35 tons/yd3. Wet clay above the range (about 1.5 tons/yd3 per HelloGravel) is flagged on the page, not folded into a preset — if your supplier's figure is higher, their scale ticket wins.
  • Compaction / settling allowance is a range by soil type: sandy fill 10-15%, mixed fill 15-20%, clay-heavy fill 20-25% — per engineerfix's fill-dirt guide (compaction bands) and HelloGravel's settling guide (10-15% general, 20-25% for clay-heavy); TryBuildCalc's backfill compaction guide says to order 10-20% extra loose material over final compacted volume, and CalculatorsHub's fill-dirt tool lists standard fill at 20%, loose sand at 10-15% and clay-heavy soil at 25-30%. The tool default is 15% — the overlap of the sandy and mixed bands — and the user picks their soil's band; the page never presents a single universal percentage.
  • Truck capacities are volume ranges that legal weight limits often cut short: tri-axle commonly quoted 10-14 yd3 (SuncentAuto, PrettyMotors and Accio summaries agree on 10-14; engineerfix gives tandem 10-16 yd3 and tri-axle 14-20 yd3 physical, and stresses weight as the binding constraint); single-axle 5-8 yd3 per engineerfix. The tool defaults to 12 yd3 (midpoint of the commonly quoted tri-axle band) and offers 5/8/10/12/14/16/20 yd3, reporting tons per load so a weight-capped load is visible: at mixed density 12 yd3 = 14.66 tons and 20 yd3 = 24.44 tons.
  • Volume and conversion arithmetic is exact: 1 yd3 = 27 ft3 = 0.764554858 m3; 1 US ton = 2,000 lb = 907.18474 kg; 1 tonne = 1,000 kg = 1.10231 US tons. Canonical example (this tool): 10 x 10 ft at 6 in, mixed fill, 15% — net 50 ft3 = 1.85 yd3 (1.42 m3); order 57.5 ft3 = 2.13 yd3 (1.63 m3); weight 2,361 kg = 2.60 US tons (2.36 tonnes); 1 load at 12 yd3.
  • Settling time and lift practice: fill dirt typically settles over 3-12 months (sandy 3-6 months, clay 12+ months) per HelloGravel's settling guide; compact in 6-8 in lifts per the same guide, with rollers handling thicker lifts (about 250-300 mm) and hand tampers thinner ones (about 100-150 mm) per TryBuildCalc. Structural-fill compaction targets (95-100% of a Proctor test) are per TryBuildCalc and are stated as an engineer's specification, not this tool's approval.
  • Fill dirt vs topsoil distinction: fill dirt is low-organic subsoil for raising grade; topsoil is the organic surface layer for planting — per EarthDepot's guide (strip the organic topsoil layer, typically 6-12 in, before placing structural fill). Topsoil finish depths on this page (4-6 in for a new lawn, 12 in for a raised bed) match this site's topsoil calculator.
  • Cost, when shown, uses only the price per cubic yard and the flat delivery fee you enter — no prices are preset. Delivery is usually charged per load or per trip, so the page tells the reader to multiply a per-load fee by the truckload count.

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

Safety note

Call 811 to mark buried utilities before you dig or regrade — hitting a line is the one fill-dirt mistake that can injure someone. Dump trucks are wide and tall, and a raised bed reaches far above overhead lines and branches — check gate width, overhead clearance and soft ground before the truck arrives. Fill dirt is heavy work: use machinery for large volumes rather than wheelbarrows on slopes, and never work under a tipped load. Fills that carry a building, driveway or retaining wall are structural work — get an engineer's specification for the material and compaction before the first load.
Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • Fill-dirt density is a range, not a measurement: published figures run about 1.0-1.4 US tons per cubic yard dry-to-moist, and wet clay can reach about 1.5 tons per yard. The tool's three presets (sandy/loose 1.10, mixed 1.22, clay-heavy/wet 1.35 tons per yard) span that range, but your supplier's scale ticket is the final word — if they price by the ton, ask for their tons-per-yard figure and pick the preset closest to it.
  • The compaction allowance is a planning range by soil type (sandy 10-15%, mixed 15-20%, clay-heavy 20-25%), not a universal constant. The 15% default is the overlap of the sandy and mixed bands for unspecified mixed fill. Deep fills compacted in lifts, fills under a slab or driveway, and clay-heavy fills need the top of the range or an engineer's specification — this tool does not approve structural fill.
  • Truckloads are volume loads rounded up. The legal weight limit often caps a load before the box is full: at the default density a 12 yd3 tri-axle load weighs about 14.66 tons, and a wet load weighs more. Confirm the haulier's legal payload and the truck that will actually arrive — a 5 yd3 single-axle truck on a 51 yd3 job is 11 trips, not 5.
  • Delivery cost here is a single flat fee you enter. Yards commonly charge delivery per load or per trip, and some waive it above a minimum order — if your yard charges per load, multiply the fee by the truckload count before comparing quotes.
  • This page sizes fill dirt only. It does not design drainage, retaining structures, foundations or driveways; it does not test the fill for contamination, organics or expansive clay; and it does not set finished grade levels. Strip organic topsoil before placing structural fill, keep finished grade falling away from buildings, and check local rules and permits for large fills, fills near boundaries and fills in flood areas. If the fill is going behind a wall, size the wall itself — blocks, base and drainage gravel — with the retaining wall calculator.
  • Fill dirt is not topsoil and not a growing medium: it is low-organic subsoil for raising grade. Planting directly into it starves plants — finish any area you intend to plant with a topsoil layer (see the topsoil calculator) and a lawn or bed depth from that page.
  • Cost is an estimate only, from the prices you enter — no prices are preset. Fill-dirt prices swing with haul distance, screening, order size and season; always get a delivered quote from a local yard before budgeting.

Fill Dirt Calculator — frequently asked questions

How many cubic yards of fill dirt do I need for 100 sq ft?

At 6 in deep, 100 sq ft needs 1.85 cubic yards net (50 ft3, 1.42 m3) and 2.13 cubic yards ordered with the default 15% compaction allowance (57.5 ft3, 1.63 m3) — about 2.60 US tons (2.36 tonnes) at mixed-fill density, in 1 tri-axle load at 12 yd3. At 3 in deep the same area needs 0.93 yd3 net (1.06 yd3 ordered); at 12 in deep it needs 3.70 yd3 net (4.26 yd3 ordered). Enter your exact depth above — depth is what moves this number.

How much fill dirt do I need for a 10x10 area?

A 10 x 10 ft area (100 sq ft) at 6 in deep needs 1.85 cubic yards net and 2.13 cubic yards ordered at 15% compaction allowance, weighing 2.60 US tons (2.36 tonnes) — 1 truckload at 12 yd3. At 12 in deep the same 10 x 10 ft area needs 3.70 yd3 net (4.26 yd3 ordered, 5.20 tons). In metric units, a 3 x 3 m area (9 m2) at 15 cm deep needs 1.35 m3 net (1.55 m3 ordered, 2.25 tonnes).

How many cubic yards of fill dirt do I need for 1,000 sq ft?

At 6 in deep, 1,000 sq ft needs 18.52 cubic yards net (500 ft3) and 21.30 cubic yards ordered at 15% (575 ft3, 16.28 m3) — about 26.02 US tons (23.61 tonnes) at mixed-fill density, in 2 truckloads at 12 yd3 (21.30 / 12 = 1.78, rounded up). At 12 in deep the same area needs 37.04 yd3 net (42.59 yd3 ordered, 52.05 tons, 4 loads at 12 yd3).

How much fill dirt do I need in cubic metres?

Multiply area in m2 by depth in metres, then add the compaction allowance. A 10 m2 area at 15 cm deep needs 1.50 m3 net and 1.73 m3 ordered at 15% (2.26 yd3, 2.50 tonnes). A 50 m2 area at 20 cm deep needs 10.00 m3 net and 11.50 m3 ordered (15.04 yd3, 16.68 tonnes, 2 loads at 12 yd3). One cubic metre covers 6.67 m2 at 15 cm deep, 10.00 m2 at 10 cm and 3.33 m2 at 30 cm.

How many truckloads of fill dirt do I need?

Truckloads = order cubic yards / truck cubic yards, rounded up — and the truck size is your input, not a fixed fact. A 51.11 yd3 order (40 x 30 ft at 12 in, 15% allowance) needs 11 loads in a 5 yd3 truck, 6 loads in a 10 yd3 truck, 5 loads in a 12 yd3 tri-axle truck, 4 loads in a 14 yd3 truck and 3 loads in a 20 yd3 truck. Confirm the haulier's legal payload too: at mixed-fill density a full 12 yd3 load weighs 14.66 tons and a full 20 yd3 load weighs 24.44 tons, and weight limits often cap a load before the box is full.

How many tons is a cubic yard of fill dirt?

About 1.0-1.4 US tons per cubic yard dry-to-moist — it is a range, not one number, because density varies with soil type and moisture. The tool's labelled presets are sandy/loose 1.10 tons per yard (1,300 kg/m3), mixed/typical 1.22 tons per yard (1,450 kg/m3, the default), and clay-heavy/wet 1.35 tons per yard (1,600 kg/m3). Wet clay can reach about 1.5 tons per yard. In metric units that is 994 kg, 1,109 kg and 1,223 kg per cubic yard respectively, or 1.30, 1.45 and 1.60 tonnes per cubic metre. If your supplier prices by the ton, ask for their tons-per-yard figure — the scale ticket beats any preset.

How much extra fill dirt should I order for compaction?

Order 10-15% extra for sandy fill, 15-20% for mixed fill and 20-25% for clay-heavy fill — the tool defaults to 15% for unspecified mixed fill. On the 100 sq ft at 6 in example (1.85 yd3 net), that is 2.04 yd3 at 10%, 2.13 yd3 at 15% and 2.31 yd3 at 25%. Deep fills, fills under slabs or driveways, and clay-heavy fills should use the top of their band or an engineer's specification, and compacting in 6-8 in lifts settles far less afterwards than one deep dump.

What is the difference between fill dirt and topsoil?

Fill dirt is low-organic subsoil dug from below the topsoil layer: dense, cheap and good for raising grade, levelling ground and backfilling, but nearly sterile — it grows almost nothing on its own. Topsoil is the dark, organic-rich surface layer that plants grow in. Use fill dirt to raise the grade and topsoil on top for anything you plant: 4-6 in of topsoil for a new lawn, 12 in for a raised bed (see the topsoil calculator). Paying topsoil prices for grade fill wastes money, and planting straight into fill dirt wastes the plants.

How much does fill dirt cost per cubic yard delivered?

This calculator presets no prices — enter your supplier's price per cubic yard and delivery fee for a delivered total. As an illustration with entered prices: the 100 sq ft at 6 in job (2.13 yd3 ordered) at $30 per yard costs $63.89 in material, plus a $75 flat delivery fee, for $138.89 delivered. Compare delivered totals, not headline rates: yards sell by the yard, by the ton or by the load, delivery is often charged per load, and a second delivery for a short order costs more per yard than ordering the compaction allowance in the first place.

How long does fill dirt take to settle?

Typically 3-12 months, depending on soil type and compaction: sandy soils stabilise in roughly 3-6 months, clay soils can take 12 months or more, and most settlement happens in the first few months. Properly compacted fill settles faster and less than uncompacted fill — which is why deep fills should be built in 6-8 in compacted lifts rather than dumped deep and left. Do not lay a slab, driveway or finished lawn over fresh, uncompacted fill and expect it to stay level.

Can I use fill dirt under a driveway or foundation?

Only to an engineer's specification. Fill under a slab, driveway or foundation must be the right material (clean, low-organic, non-expansive), placed in thin compacted lifts and compacted to a specified density — often 95-100% of a Proctor test for structural work — and verified by testing. This calculator sizes the volume; it does not approve the material, the compaction or the design. For non-structural levelling and garden regrading, the compaction allowances on this page are the right basis; for anything carrying a building or a vehicle, get a geotechnical or structural engineer involved before the first load.

How deep can I fill in one layer?

Build deep fills in 6-8 in compacted lifts: spread one layer, compact it, then spread the next. A single deep dump compacts at the top and stays loose underneath, then settles unevenly for months — and the settlement shows up as dips, cracks in slabs above it, and ponding. Rollers can handle thicker lifts (up to about 250-300 mm) than hand tampers (about 100-150 mm), but the lift rule is the same either way: thin layers, compacted one at a time.

Next step

Take the cubic-yard and ton totals to the landscape yard for a delivered bulk quote — and confirm the truck size and payload that will actually arrive, since weight limits often cap a load before the box is full. For the planting layer on top of the fill, run the topsoil calculator before you order.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.