Basement Finishing Cost Calculator — How Much Does It Cost to Finish a Basement?

The question sounds simple — how much does it cost to finish a basement? — and the published answers disagree by a factor of ten, because they are pricing different rooms. Angi’s national guide puts the average at $32,000 and $7–$23 per sq ft; HomeGuide puts a typical finish at $30–$50 per sq ft; Block Renovation’s contractor bands run $25–$40 basic, $40–$75 mid-range and $75–$100+ high-end. All three are right — about different scopes. A half-finished basement that needs paint and flooring is not the same job as an unfinished basement that needs framing, wiring, ductwork, a bathroom, an egress window and waterproofing. This basement finishing cost calculator prices the job the way a contractor builds it: six component trades per square foot (framing and insulation, drywall and paint, electrical and lighting, HVAC, ceiling, trim and doors), flooring by material, flat add-ons for the rooms that actually move the total — a bathroom at $15,000, an egress window at $4,244 per bedroom, a kitchenette at $10,000, waterproofing at $7.50 per sq ft when the basement is damp — then permits and a 15% contingency, because basements hide their surprises behind foundation walls. On the default 1,000 sq ft unfinished basement that build comes to $39,103, or $39.10 per sq ft. Two code gates sit beside the money, because they decide what the space can legally be: habitable rooms need a 7 ft ceiling (2021 IRC R305.1, measured to the finished ceiling), and every basement bedroom needs an egress opening of 5.7 sq ft net clear (R310) in a room of at least 70 sq ft (R304). The tool checks your ceiling height against those gates as you price. And the resale check prints both halves of the truth: a basement remodel recoups about 71% at resale (Cost vs Value 2025), but below-grade square feet do not count as gross living area (ANSI Z765). For the trades inside the build, size the walls with the insulation calculator and the drywall calculator, the floor with the flooring calculator, the walls’ finish with the paint calculator, a bathroom with the bathroom remodel cost calculator, a kitchenette with the kitchen remodel cost calculator, the heating load with the BTU calculator and the heat pump size calculator, the damp air with the dehumidifier size calculator, and the framing itself with the framing calculator.

Quick answer: Finishing a 1,000 sq ft unfinished basement (40 × 25 ft, 8 ft ceiling) at a standard finish with vinyl plank flooring costs $39,103 — $39.10 per sq ft ($421 per m²) with permits and 15% contingency: $27,500 of components (framing, drywall, electrical, HVAC, ceiling, trim), $6,000 of flooring, $503 of permits and $5,100 of contingency. Add one bedroom and a full bathroom to an 800 sq ft basement and the same method gives $53,745 ($67.18 per sq ft). The published guides run $7–$23 per sq ft half-finished, $30–$75 contractor standard and $75–$120+ for a living suite — the spread is scope, and this tool shows which scope you are pricing. Enter your own size and rooms below for your exact build.
Key takeaways
  • The per-square-foot spread is scope, not error: $7–$23 per sq ft prices a half-finished or bare scope (Angi), $30–$75 a contractor-led standard finish (HomeGuide $30–$50; Block Renovation $40–$75 mid-range), and $75–$120+ a living suite. The same 1,000 sq ft is $7,000–$23,000, $30,000–$75,000 or $75,000–$120,000+ depending on which rooms are in it — no rival calculator prints the three bands with the scope named.
  • The component build is the honest middle: six trades at $19.50 (basic), $27.50 (standard) or $40.50 (high) per sq ft, plus flooring at $4–$10 per sq ft. On the 1,000 sq ft default that is $27,500 + $6,000 = $33,500 before permits ($503) and 15% contingency ($5,100) — $39,103 all in, $39.10 per sq ft.
  • Rooms are what move the total, not the walls: a full bathroom adds $15,000 (published spread $6,500 basic to $10,000–$25,000 full), each bedroom adds a $4,244 egress window (Angi’s 2026 average; the opening must be 5.7 sq ft net clear under IRC R310), and a kitchenette or wet bar adds $10,000. An 800 sq ft basement with one bedroom and a full bath prices at $53,745 — against boltcoin’s published $48,550 for the same size, a 10.7% gap explained by the bathroom and egress scope.
  • Two code gates decide what the space can legally be: habitable rooms need a 7 ft ceiling (2021 IRC R305.1 — measure to the finished ceiling, after subfloor and drywall), and every basement bedroom needs its own egress opening (R310) in a room of at least 70 sq ft (R304). A 6 ft 6 in ceiling cannot be a legal bedroom no matter what the budget says.
  • The resale maths has two halves and both matter: a basement remodel recoups about 71% of its cost at resale (Cost vs Value 2025: $52,012 cost, $36,905 back), but below-grade square feet do not count as gross living area (ANSI Z765) — the space adds value on its own appraisal line, not at the above-grade price per square foot. On the $39,103 default that is about $27,763 back.
The longest inside wall, foundation face to foundation face. With the width below it sets the floor area everything is priced from: 40 × 25 ft is 1,000 sq ft (92.9 m²). Measure the finished area you actually plan to finish, not the whole footprint, if part stays as storage or utility space.
The shorter inside wall, in the same unit as the length above. 40 × 25 ft is 1,000 sq ft; 40 × 20 ft is 800 sq ft. Small basements cost more per square foot than large ones — the bathroom, the egress window and the permits are fixed costs spread over fewer feet.
Measure from where the finished floor will sit to the underside of the finished ceiling — subtract subfloor, flooring and drywall or drop ceiling from the joist height. The code gate is 7 ft for habitable rooms (2021 IRC R305.1); bathrooms and laundry rooms need 6 ft 8 in, and beams or ducts may project to 6 ft 4 in. The tool checks your number against those gates.
Unfinished prices the full component build. Half-finished applies a 0.50 planning factor to the components (Angi prices half-finished work at $7–$23 per sq ft) — flooring and room add-ons stay at full price, because a half-finished basement still needs its floor and its bathroom. A finished remodel applies 0.85: the tear-out is cheaper than starting bare, but everything goes back in. These factors are planning figures, not published tables.
The six component rates move together by level: framing and insulation $4.50/$5.50/$7.00, drywall and paint $4.00/$5.50/$7.50, electrical $3.50/$5.00/$8.00, HVAC $2.00/$3.00/$4.50, ceiling $3.50/$5.00/$7.50, trim and doors $2.00/$3.50/$6.00 per sq ft. Basic is a family room or gym; standard adds better lighting, doors and finishes; full suite is built-ins and premium materials. Rooms are priced separately below — the level does not include them.
Installed planning rates. Vinyl plank is the common basement choice because it tolerates moisture better than wood; carpet is cheapest and warmest but the least forgiving if water ever gets in; tile is the most water-proof and the coldest. A moisture barrier or raised subfloor panel is not in these rates — if your slab is damp, budget it separately.
Every basement bedroom needs its own emergency escape and rescue opening: 5.7 sq ft net clear, at least 24 in high and 20 in wide, sill no more than 44 in above the floor (2021 IRC R310) — plus a window well of at least 9 sq ft if the sill is below grade. The tool adds $4,244 per bedroom, Angi’s 2026 average installed cost ($2,723–$5,898; enlarging an existing window is cheaper, cutting a new opening in poured concrete costs more). The bedroom itself must be at least 70 sq ft and 7 ft in any direction (R304).
Published spreads are wide: $6,500 for a basic bathroom as a flat add-on, $10,000–$25,000 for a full bathroom with new drain and supply lines, and one transparent labour model prices a half bath at +$8,125 and a full bath at +$14,975 on an 800 sq ft finish. The tool uses $8,000 and $15,000. Breaking the slab for drains, and a sewage ejector pump if the drain sits below the sewer line, are what push a basement bathroom toward the top of its range.
The midpoint of the published $5,000–$15,000 wet-bar range: cabinets, a sink, a small fridge and the plumbing and electrical to feed them. A full second kitchen with a range is a different job — and in many jurisdictions a different permit category, because it can create a separate dwelling unit.
A planning allowance for the wiring, acoustic treatment, media wall and lighting control of a theater corner — not a published rate. Replace it with your quote: a projector, screen and sound system alone can pass $5,000 before the room is built.
Damp or wet adds waterproofing at $7.50 per sq ft, the midpoint of the published $5–$10 band (average job about $4,500). That prices an interior allowance, not a full exterior excavation and membrane system ($6,000–$18,000). Whatever the budget says: fix the water first. Framing and drywall over a damp wall trap moisture where you cannot see it, and the finish has to come back off to repair it.
A planning factor on the whole build, because published national guides cannot see your city: the same 1,000 sq ft finish is priced at $7,000–$23,000 in Angi’s national low-end table and $55,000–$145,000 in Angi’s Chicago table. Use low-cost for rural and low-wage markets, high-cost for major metros — then replace the factor with three local quotes.
10–20% is typical for basements, and 15% is the default here. It covers what the slab and the foundation wall are hiding: a cracked drain, a panel with no spare capacity, a duct that has to move. Permits are added before contingency, so the contingency also covers permit surprises. Set it to 0 only to see the bare build.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Basement Finishing Cost Calculator — How Much Does It Cost to Finish a Basement?

  1. Measure the finished area. Length × width of the space you actually plan to finish — not the whole footprint if a utility corner stays unfinished. 40 × 25 ft is 1,000 sq ft. The wall area (2 × (length + width) × ceiling) is printed for your drywall and insulation checks.
  2. Measure the ceiling the way the code does. From the finished floor you intend to install to the underside of the finished ceiling. A bare 7 ft 2 in under the joists can become 6 ft 10 in after a subfloor panel, flooring and drywall — and 6 ft 10 in fails the 7 ft habitable minimum (2021 IRC R305.1). The tool checks the number as you type.
  3. Pick where you are starting from. Unfinished prices the full build; half-finished halves the component build (Angi’s half-finished band is $7–$23 per sq ft); a finished remodel prices at 0.85 for the tear-out and rebuild. Flooring and rooms are always full price.
  4. Pick the finish level. Basic ($19.50/sq ft of components), standard ($27.50) or full suite ($40.50). The level moves all six trades together — framing, drywall, electrical, HVAC, ceiling, trim. It does not include any rooms; those are the next step.
  5. Add the rooms — they are the budget. Each bedroom adds a $4,244 egress window, a full bathroom adds $15,000, a kitchenette $10,000. An open 1,000 sq ft family room and a 1,000 sq ft suite with a bath and two bedrooms are different jobs at different prices, and the tool keeps them separate so you can see it.
  6. Be honest about moisture. If the walls are damp, pick damp: waterproofing at $7.50 per sq ft goes into the build before any framing. Finishing over water is the most expensive mistake in this project — the finish comes back off to fix it.
  7. Set the region and contingency. Low-cost 0.90×, average 1.00×, high-cost 1.15× — a planning factor until local quotes replace it. Contingency 15% is the default; 10–20% is the published typical band for basements.
  8. Read the total, then the range. The total is components + flooring + rooms, regionalised, plus permits (the larger of $500 or 1.5%) and contingency. The ±15% planning range around it is the band your three quotes should land in — for the same scope.
  9. Check the two code gates. Ceiling: 7 ft for habitable rooms, 6 ft 8 in for bathrooms and laundry (R305.1). Bedrooms: 70 sq ft minimum, 7 ft in any direction (R304), each with a 5.7 sq ft egress opening (R310). A room that fails these is storage, whatever you call it on the plan.
  10. Check the resale half of the maths. About 71% comes back at resale on the national average (Cost vs Value 2025) — but the finished basement is not added to the home’s gross living area (ANSI Z765). Finish it because you will use it, and let the resale figure be a partial refund, not the reason.
  11. Price the trades inside the build. Insulation, drywall, flooring and paint each have their own calculator on this site, linked below the tool — the component rates tell you the budget line, the trade calculators tell you the material count.
  12. Get three written quotes for the same scope. Same rooms, same finish level, same waterproofing state, same egress count. A quote that omits the waterproofing or the egress window is not cheaper — it is a different job.

Basement Finishing Cost Calculator — How Much Does It Cost to Finish a Basement? formula

Floor and wall area: floor area = length × width; wall area = 2 × (length + width) × ceiling height. On the defaults: 40 × 25 = 1,000 sq ft (92.9 m²); walls 2 × 65 × 8 = 1,040 sq ft.

Component build: components = (framing + drywall + electrical + HVAC + ceiling + trim rates) × floor area × starting-scope factor. The rates sum to $19.50 (basic), $27.50 (standard) and $40.50 (high) per sq ft. On the defaults: $27.50 × 1,000 × 1.00 = $27,500 (framing $5,500 · drywall $5,500 · electrical $5,000 · HVAC $3,000 · ceiling $5,000 · trim $3,500). Half-finished applies 0.50 to this line only; a finished remodel applies 0.85.

Flooring and rooms: flooring = floor rate × floor area (carpet $4, vinyl plank $6, engineered wood $9, tile $10 per sq ft). Rooms are flat: half bathroom $8,000, full bathroom $15,000, kitchenette/wet bar $10,000, home theater allowance $5,000, egress $4,244 per bedroom, waterproofing $7.50 × floor area when the basement is damp or wet. On the defaults: flooring $6,000, rooms $0.

Subtotal, permits, contingency: subtotal = (components + flooring + rooms) × region factor (0.90 / 1.00 / 1.15). Permits = the larger of $500 or 1.5% of the subtotal. Total = (subtotal + permits) × (1 + contingency). On the defaults: $33,500 × 1.00 = $33,500; permits max($500, $502.50) = $502.50; total ($33,500 + $502.50) × 1.15 = $39,102.88 — $39.10 per sq ft, $420.90 per m². The planning range is the total × 0.85 to × 1.15.

Resale check: recouped = total × 71% (Cost vs Value 2025 basement remodel: $52,012 job cost, $36,905 resale value). On the defaults: $39,102.88 × 71% = $27,763.04 back. Below-grade area is reported separately from gross living area (ANSI Z765), so the recoup is a survey average, not a per-square-foot valuation.

Code gate: ceiling ≥ 7 ft passes for habitable rooms (2021 IRC R305.1); 6 ft 8 in to 7 ft meets only the bathroom/laundry minimum; below 6 ft 8 in fails both (beams and ducts may project to 6 ft 4 in). Each bedroom also needs ≥ 70 sq ft and ≥ 7 ft in any horizontal dimension (R304) and a 5.7 sq ft net-clear egress opening (R310).

Worked example

Worked example 1 — the default basement: 1,000 sq ft unfinished, standard finish. This is the tool’s default, worked by hand so you can check it.

  1. Area: 40 × 25 ft = 1,000 sq ft (92.9 m²); walls 2 × (40 + 25) × 8 = 1,040 sq ft.
  2. Components: standard rates $5.50 + $5.50 + $5.00 + $3.00 + $5.00 + $3.50 = $27.50 per sq ft × 1,000 × 1.00 (unfinished) = $27,500.
  3. Flooring: vinyl plank 1,000 × $6 = $6,000. Rooms: none — no bedrooms, no bathroom, dry basement.
  4. Subtotal: ($27,500 + $6,000) × 1.00 (average region) = $33,500.
  5. Permits: max($500, 1.5% × $33,500 = $502.50) = $502.50.
  6. Total: ($33,500 + $502.50) × 1.15 (15% contingency) = $39,102.88 — $39.10 per sq ft, $420.90 per m². Planning range $33,237–$44,968.
  7. Resale: $39,102.88 × 71% = $27,763.04 back on the Cost vs Value 2025 average — with the ANSI Z765 caveat that the space is not gross living area.

Worked example 2 — 800 sq ft with a bedroom and a full bathroom. 40 × 20 ft, standard finish, vinyl plank, 1 bedroom, full bathroom. Components $27.50 × 800 = $22,000; flooring $4,800; egress $4,244; bathroom $15,000. Subtotal $46,044; permits $690.66; total $53,744.86 ($67.18 per sq ft). The published cross-check for the same size is boltcoin’s $48,550 benchmark for an 800 sq ft finish with rooms and a bedroom (labour 288 hrs × $38.37 × 1.40 = $15,471; materials $17,600) — this tool reads 10.7% higher, inside the ±15% planning range, with the difference in the bathroom and egress scope. Two honest methods, one band.

Worked example 3 — the metric twin: 60 m². 10 × 6 m, 2.4 m ceiling, standard finish, vinyl plank: 645.83 sq ft; components $17,760.45; flooring $3,875.01; permits $500; total $25,455.78 — $424.26 per m². The metric cross-check in the field is themagiccodex’s 60 m² mid figure of $54,500 ($908.33/m²) — more than double, because that scope bakes waterproofing ($60/m²) into every level and includes a bathroom ($6,500) and a bedroom ($7,500) in the headline. Add those three lines to this tool’s build and the gap narrows to the rate difference; leave them out and you are comparing an open room with a suite. Scope, again, is the whole story.

Worked example 4 — the band edges. Basic finish with carpet on 1,000 sq ft: $19,500 + $4,000, permits $500, total $27,600 ($27.60 per sq ft) — inside Block Renovation’s $25–$40 basic band. High finish with tile, a full bathroom and a kitchenette: $40,500 + $10,000 + $25,000, permits $1,132.50, total $88,127.38 ($88.13 per sq ft) — inside the $75–$120+ living-suite band. Half-finished at the standard level: components halved to $13,750, total $23,287.50 ($23.29 per sq ft) — at the top of Angi’s $7–$23 half-finished band. The tool’s four corners land in the four published bands, which is the check that the component rates are honest.

Basement finishing tables: cost per square foot by scope, cost by size, the component rates, room add-ons, permits, the code gates, and the field as it stands

Cost per square foot is scope, not error — the table no rival prints whole. The same basement priced four ways:

ScopePer sq ft1,000 sq ftWhat is in itSource
Half-finished / bare$7–$23$7,000–$23,000Paint, flooring, minor work on an already-partly-finished spaceAngi (2026); NerdWallet
Basic contractor finish$25–$40$25,000–$40,000Framing, insulation, drywall, lighting, vinyl or carpet, paint — one open roomBlock Renovation (July 2026)
Standard contractor finish$30–$75$30,000–$75,000The basic scope plus a bathroom, built-ins, better flooring and lightingHomeGuide $30–$50; Block Renovation $40–$75
Living suite$75–$120+$75,000–$120,000+Full bathroom, kitchenette or wet bar, bedroom with egress, premium finishesBlock Renovation $75–$100+; Angi full build $30–$100

Angi’s own national average is $32,000 with a $15,000–$75,000 typical range — which only makes sense once the scope is named: the average basement in that survey is not a suite. This tool’s default (open room, standard finish, no bathroom) is $39.10 per sq ft, inside the standard band; add the rooms and it climbs into the suite band on the same rates.

Cost by size — both bands, because size alone does not price the job.

Basement sizeHalf-finished band ($7–$23)Standard band ($30–$75)This tool, standard open room
400 sq ft$2,800–$9,200$12,000–$30,000$15,985
600 sq ft$4,200–$13,800$18,000–$45,000$23,690
800 sq ft$5,600–$18,400$24,000–$60,000$31,395 open; $53,745 with bedroom + full bath
1,000 sq ft$7,000–$23,000$30,000–$75,000$39,103 open; $88,127 as a suite
1,500 sq ft$10,500–$34,500$45,000–$112,500$58,654 open

The open-room figures are this tool at the standard level with vinyl plank, average region, 15% contingency, no rooms — the fixed costs (permits floor, bathroom, egress) are why small basements with rooms cost more per square foot than large open ones.

The component rates — where the money goes. Per square foot of floor area, by finish level (toolwick method):

ComponentBasicStandardHigh1,000 sq ft at standard
Framing & insulation$4.50$5.50$7.00$5,500
Drywall, taping & paint$4.00$5.50$7.50$5,500
Electrical & lighting$3.50$5.00$8.00$5,000
HVAC & ductwork$2.00$3.00$4.50$3,000
Ceiling finish$3.50$5.00$7.50$5,000
Trim, doors & hardware$2.00$3.50$6.00$3,500
Component total$19.50$27.50$40.50$27,500
Flooring (separate)carpet $4 · vinyl plank $6 · engineered wood $9 · tile $10 per sq ft$6,000 (vinyl)

Cross-checks from the authority guides: Angi prices framing at $7–$16 per linear foot, drywall at $1.50–$3 per sq ft of surface, ceilings at $9–$13 per sq ft and insulation at $0.30–$6.75 per sq ft — different units (linear foot, surface area), the same order of money once the wall area is counted. NerdWallet’s line items (framing $700–$1,800, drywall $1,000–$3,200, ceiling $1,000–$3,300, flooring $1,500–$4,500) describe smaller or partial scopes.

Room add-ons — the lines that move the total.

Add-onThis toolPublished spread
Half bathroom$8,000boltcoin +$8,125 on an 800 sq ft finish
Full bathroom$15,000$6,500 basic flat (themagiccodex) · $10,000–$25,000 with new plumbing (HomeGuide via Ledger and Lumber) · boltcoin +$14,975
Bedroom egress window$4,244 eachAngi 2026 average $4,244 ($2,723–$5,898); enlarging an existing window $1,000–$3,500; new cut in poured concrete $4,500–$7,000+
Kitchenette / wet bar$10,000$5,000–$15,000 wet-bar range
Home theater$5,000 allowancePlanning allowance — no published rate; replace with your quote
Waterproofing (damp)$7.50/sq ft$5–$10/sq ft, about $4,500 average (NerdWallet, Angi); full exterior system $6,000–$18,000 (HomeGuide)

Permits and contingency. Permits here are the larger of $500 or 1.5% of the subtotal (toolwick method). Published ranges: $500–$2,500 across the field, Angi $1,200–$2,000, some municipalities charge 1–2% of project value. Contingency 10–20% is typical for basements (15% default here) — hidden issues behind foundation walls are common, and the contingency is what keeps one surprise from becoming a stopped job.

The code gates (2021 IRC).

GateRuleSection
Ceiling — habitable rooms7 ft minimum, finished floor to finished ceilingR305.1
Ceiling — bathrooms, toilet rooms, laundry6 ft 8 in minimumR305.1
Beams, girders, ductsMay project to within 6 ft 4 in of the finished floorR305.1
Egress opening (each bedroom + the basement)5.7 sq ft net clear (5.0 at grade floor); 24 in min height; 20 in min width; sill max 44 in above floor; window well min 9 sq ft, 36 in min dimensions, ladder if over 44 in deepR310
Room size70 sq ft minimum; 7 ft minimum in any horizontal dimensionR304

Note the egress trap: the minimum width (20 in) and minimum height (24 in) together give only 3.3 sq ft — a 20 in wide opening must be 41 in high, or a 24 in high opening 34.2 in wide, to reach 5.7 sq ft. Local amendments can be stricter; some states allow 6 ft 4 in ceilings in existing basements. Confirm with your building department.

Resale — both halves. Cost vs Value 2025 (Remodeling Magazine, 119 markets): basement remodel $52,012 job cost, $36,905 resale value, 71% recouped — the report’s defined project is a 20 × 30 ft entertaining area plus a 5 × 8 ft bathroom and a wet bar (640 sq ft, about $81 per sq ft at the national average; Seattle $68,358, about $107 per sq ft). The caveat that travels with it: under ANSI Z765-2021, which Fannie Mae requires for most appraisals, any level partly below grade is reported as basement area and is not included in gross living area — even a walkout with full-height windows. The finished space still gets a market adjustment on its own line; it just does not sell at the above-grade price per square foot.

The field, as it stands. The exact-phrase calculator results are all small specialist tools: themagiccodex (metric $450/$800/$1,400 per m² with waterproofing baked in; 60 m² mid → $54,500), toolwick (the component method this page follows; 720 sq ft → $40,000–$65,000), revenuelab (contractor-side pricing: $48/sq ft materials + 0.28 hrs/sq ft at $62/hr + 27% markup → $61,092 for 700 sq ft — a bid model, not a homeowner budget) and everycalculators (base $25–$70+/sq ft; 800 sq ft basic → $23,800). The question variant (“how much does it cost to finish a basement”) is held by authority guides: NerdWallet (average about $32,000, $7–$23/sq ft, waterproofing about $4,500), Angi ($32,000 average, $15,000–$75,000 typical, scope table from $7–$23 half-finished to $30–$100 full build) and Block Renovation ($30–$75 contractor standard, $75–$120+ suite). A new small rival, boltcoin, publishes the most transparent labour model in the field ($48,550 for 800 sq ft with rooms and a bedroom). None of them prints the scope bands side by side, none checks the ceiling against the code gate, and none pairs the 71% recoup with the ANSI Z765 caveat — which is what this page is built to do.

Measurement tips

  • Fix water before you frame anything. Waterproofing at $7.50 per sq ft is in this build for a reason: a damp wall behind new drywall is a repair that starts with demolition. Grade, gutters and the interior drain come first; the finish comes last.
  • Measure the ceiling after the finishes, not before. Subfloor panels, flooring and a drywall ceiling can take 4–6 inches off the joist height. A basement that measures 7 ft 3 in bare can finish at 6 ft 9 in — legal for a bathroom, not for a bedroom (R305.1).
  • Put the bathroom over the existing rough-in if you have one. Breaking the slab for new drains is the expensive half of a basement bathroom. A rough-in already in the slab can keep a full bath near $10,000 instead of $25,000.
  • Enlarge an existing window before you cut a new one. Egress averages $4,244 installed (Angi 2026), but enlarging an existing opening runs $1,000–$3,500 against $4,500–$7,000+ for a new cut in poured concrete — and the window well and drainage are most of the difference.
  • Price the open room first, then add rooms one at a time. The default open 1,000 sq ft is $39,103. Each room you add is a visible line — bathroom $15,000, egress $4,244, kitchenette $10,000 — so you can drop the room that breaks the budget instead of shrinking the whole finish.
  • Keep the contingency at 15% until the slab is open. Basements hide cracked drains, undersized panels and ducts in the wrong place. The 10–20% band exists because the surprises are behind concrete, not because contractors pad.
  • Choose flooring for the water you might get, not the water you have. Vinyl plank at $6 per sq ft tolerates a minor leak that ruins carpet and swells wood. In a basement with any damp history, that tolerance is worth more than the price difference.
  • Run the heating load before you extend the ducts. A finished basement needs heat, and an existing system sized for the floors above may not have the capacity. Check the load with the BTU and heat pump calculators linked below — a ductless mini-split ($3,000–$8,000) is the usual fallback.
  • Photograph every wall before the drywall goes up. Wiring, plumbing and the egress framing are inspected once and hidden forever. The photos are your map for every future picture hook, shelf and repair.
  • Get three quotes for the identical scope. Same rooms, same finish level, same waterproofing state, same egress count, same flooring. The published spread between a $23,800 basic build and a $61,092 contractor bid for similar areas is mostly scope — make the scope identical and the quotes comparable.

Common mistakes

  • Comparing per-square-foot prices without the scope. $7–$23 and $75–$120+ per sq ft are both published, both sourced, and both right — for different jobs. A quote at $20 per sq ft that excludes the bathroom, the egress window and the waterproofing is not cheaper than one at $45 that includes them.
  • Framing over a damp wall. The most expensive basement mistake: the finish traps moisture, mould grows unseen, and the repair starts by tearing out the new work. Waterproofing first, at $5–$10 per sq ft, is cheap insurance against a five-figure redo.
  • Calling a room a bedroom without egress. A basement room without a 5.7 sq ft egress opening (R310) is not a legal bedroom — it cannot be listed as one, and in a fire it is a trap. The window is not optional decoration; it is the difference between a bedroom and a storage room with a bed in it.
  • Measuring the ceiling to the joists. The 7 ft rule (R305.1) is measured to the finished ceiling. Subfloor, flooring and ceiling finish all come off the bare height — plan the finishes first, then check the gate.
  • Forgetting the fixed costs on a small basement. Permits have a floor, a bathroom costs what it costs, and an egress window does not shrink with the room. A 400 sq ft basement with a bath and a bedroom can cost more per square foot than a 1,200 sq ft open room — the tool shows this; a single $/sq ft rate hides it.
  • Budgeting the average instead of your scope. The $32,000 national average (Angi, NerdWallet) describes the average project in a survey — mostly partial finishes. A full unfinished-to-suite build is $75,000 and up. Budget your rooms, not the average.
  • Counting the basement in the home’s square footage. Under ANSI Z765, below-grade area is reported separately and never added to gross living area. A 1,200 sq ft house with a 1,200 sq ft finished basement is not a 2,400 sq ft house at appraisal — price the resale expectation accordingly (about 71% recouped, Cost vs Value 2025).
  • Skipping the permit to save $500–$2,500. Unpermitted finished space can be valued at zero by an appraiser, flagged at sale, and ordered opened up by an inspector. The permit is the cheapest line in the build and the one that makes the rest of the money count.

Factors that affect accuracy

  • Floor area — the multiplier. Every component rate multiplies the square feet: at the standard level, each extra 100 sq ft adds $2,750 of components and $600 of vinyl flooring before permits and contingency. Area is the biggest lever after scope.
  • Finish level — the rate switch. Basic to standard adds $8.00 per sq ft of components ($19.50 → $27.50); standard to high adds $13.00 ($27.50 → $40.50). On 1,000 sq ft that is $8,000 and $13,000 before anything else moves.
  • Starting scope — the discount with a catch. Half-finished halves the component build ($27,500 → $13,750 on the default) but leaves flooring and rooms at full price, because a half-finished basement still needs its floor, its bathroom and its egress. The total falls to $23,288, not to half of $39,103.
  • Rooms — the step changes. A full bathroom (+$15,000) is worth about 545 sq ft of standard components; each bedroom’s egress (+$4,244) is about 154 sq ft. Rooms move the total in steps, not slopes — which is why two basements of the same size can differ by $30,000.
  • Moisture — the gate, not a line item. Damp adds $7.50 per sq ft ($7,500 on 1,000 sq ft) as an allowance, but a full exterior waterproofing system runs $6,000–$18,000 and active water intrusion stops the project entirely until it is fixed. No finish level outruns a wet wall.
  • Ceiling height — the legal switch. Cost barely moves with ceiling height; legality flips. At 7 ft the space can be bedrooms and living rooms (R305.1); at 6 ft 8 in only bathrooms and laundry; below that, storage. The same budget buys different legal space on either side of the line.
  • Region — the quiet multiplier. The 0.90 / 1.00 / 1.15 planning factor moves the default total from $35,248 to $44,968 — a $9,720 spread on identical work. Published city tables are wider still (Angi Chicago $55,000–$145,000 for 1,000 sq ft), which is why local quotes replace the factor.
  • Contingency — the honesty line. Each 5 points of contingency is about $1,700 on the default build. At 0% the tool shows the bare $34,003 build; at the 20% top of the typical band, $40,803. The contingency is not padding — it is the budget for what the slab is hiding.

Sources & assumptions

  • Method — component build: six per-square-foot trades by finish level (framing & insulation $4.50/$5.50/$7.00 · drywall, taping & paint $4.00/$5.50/$7.50 · electrical & lighting $3.50/$5.00/$8.00 · HVAC $2.00/$3.00/$4.50 · ceiling $3.50/$5.00/$7.50 · trim, doors & hardware $2.00/$3.50/$6.00; sums $19.50/$27.50/$40.50) plus flooring (carpet $4 · vinyl plank $6 · engineered wood $9 · tile $10), flat room add-ons, a regional factor, permits = the larger of $500 or 1.5% of subtotal, then contingency (10–20% typical, 15% default) — toolwick's basement finishing cost calculator (live read 2026-11-26, search snapshot). Starting-scope factors (unfinished 1.00 · half-finished 0.50 · finished remodel 0.85) and region factors (0.90/1.00/1.15) are planning factors: no source publishes a complete scope or region table, and the half-finished factor is set so the result lands inside Angi's published $7–$23 band.
  • Scope bands and averages — Angi's basement finishing cost guide (updated 29 Oct 2026; live read 2026-11-26, search snapshot): national average $32,000, typical $15,000–$75,000; scope table unfinished $4,000–$37,500 · full build $30–$100/sq ft · half-finished $7–$23/sq ft · finished remodel $4,200–$45,000; size table 500 sq ft $3,500–$11,500 · 1,000 $7,000–$23,000 · 1,500 $10,500–$34,500; line items framing $7–$16 per linear ft · drywall $1.50–$3/sq ft · ceiling $9–$13/sq ft · insulation $0.30–$6.75/sq ft · HVAC $2,000–$3,000; waterproofing about $4,400–$4,500 ($5–$10/sq ft); permits $1,200–$2,000. Basement Finishing Rockford's cost guide (updated 18 Nov 2026; live read 2026-11-26, search snapshot) prints the same Angi figures beside HomeGuide's $30–$50/sq ft (updated 6 Feb 2026) and Angi's city tables (Chicago $55–$145/sq ft; Columbus $28–$90).
  • Contractor bands — USA Cabinet Store's 2026 basement remodeling guide (reviewed 2 Nov 2026; live read 2026-11-26, search snapshot), printing Block Renovation's July 2026 contractor ranges: basic $25–$40/sq ft (framing, insulation, drywall, recessed lighting, vinyl plank or carpet, paint) · mid-range $40–$75 (plus a bathroom, built-ins, upgraded flooring and lighting) · high-end $75–$100+ (structural changes, full bath or kitchenette, custom millwork); 1,000 sq ft examples $25,000–$40,000 / $40,000–$75,000 / $75,000–$100,000+; permits $200–$2,000 (HomeGuide $200–$1,000; Angi $1,200–$2,000); electrical $3,000–$8,000 (NerdWallet).
  • Bathroom, waterproofing and egress add-ons — Ledger and Lumber's basement finishing guide (live read 2026-11-26, search snapshot): a new basement bathroom with fresh drain and supply lines $10,000–$25,000 and a full waterproofing system $6,000–$18,000 (HomeGuide figures, used as-is); permits budgeted about $1,100. Field teardown 2026-11-25: themagiccodex prices a basic bathroom at $6,500 flat and a bedroom at $7,500 including egress $3,500; boltcoin's 800 sq ft model adds +$8,125 for a half bath and +$14,975 for a full bath. Egress installed cost — Basement Moisture's egress cost guide (live read 2026-11-26, search snapshot): Angi 2026 $2,723–$5,898 per window, average about $4,244; enlarging an existing window $1,000–$3,500; new opening in poured concrete $4,500–$7,000+. This page uses $8,000 (half bath), $15,000 (full bath), $4,244 (egress), $10,000 (kitchenette, midpoint of the $5,000–$15,000 wet-bar range) and $7.50/sq ft waterproofing (midpoint of $5–$10); the $5,000 home-theater line is a planning allowance, not a published rate.
  • Code gates — 2021 IRC: R305.1 habitable rooms, hallways and the parts of basements containing them need a 7 ft (2,134 mm) ceiling; bathrooms, toilet rooms and laundry rooms 6 ft 8 in (2,032 mm); beams, girders and ducts may project to within 6 ft 4 in of the finished floor — Fine Homebuilding's IRC minimum-dimensions guide (live read 2026-11-26, search snapshot) and Basement Finishing Rockford's ceiling-height guide (updated 26 Oct 2026; live read 2026-11-26, search snapshot), which quotes R305.1 directly. R310 emergency escape and rescue openings: 5.7 sq ft net clear (5.0 at grade floor), 24 in minimum height, 20 in minimum width, sill maximum 44 in above the floor; window wells minimum 9 sq ft with 36 in minimum dimensions and a ladder over 44 in deep — Linn County's IRC R310 egress guidelines and Monticello's basement finishing guide (live reads 2026-11-26, search snapshots). R304: habitable rooms at least 70 sq ft and 7 ft in any horizontal dimension (Fine Homebuilding; Monticello). Local amendments can be stricter; some states allow 6 ft 4 in in existing basements.
  • Resale — Remodeling Magazine Cost vs Value Report 2025 (119 markets): basement remodel $52,012 job cost, $36,905 resale value, 71% recouped (national average); the defined project is a 20 × 30 ft entertaining area, a 5 × 8 ft bathroom and a wet bar (640 sq ft) — Journal of Light Construction's 2025 Cost vs Value tables (live read 2026-11-26, search snapshot). Below-grade caveat — ANSI Z765-2021 (required by Fannie Mae for most appraisals since April 2022): any level partly below grade is reported as basement area and is not included in gross living area — McKissock's ANSI-Z765 guide and Opendoor's square-footage guide (live reads 2026-11-26, search snapshots).
  • Field teardown 2026-11-25 (SERP snapshots, not GSC): themagiccodex #1 exact-phrase (metric $450/$800/$1,400 per m² incl. waterproofing $60/m²; bathroom $6,500 flat; bedroom $7,500 incl. egress $3,500; 60 m² mid → $54,500, $908.33/m²) · toolwick #2 (component method above; permits max($500, 1.5%); contingency 15%; 720 sq ft → $40,000–$65,000) · revenuelab #3 (contractor-side: $48/sq ft materials + 0.28 hrs/sq ft at $62/hr + 27% markup → 700 sq ft $61,092, $87.27/sq ft) · everycalculators #4 (base $25–$70+/sq ft; bathroom $10,000–$25,000 · bedroom $3,000–$8,000 · egress $2,000–$5,000 · wet bar $5,000–$15,000; permits $500–$2,500; 800 sq ft basic → $23,800). Question variant: NerdWallet #1 (average about $32,000, $7–$23/sq ft; waterproofing about $4,500, $5–$10/sq ft; permits $1,200–$2,000) · Angi #3 (average $32,000; scope table above) · Block Renovation #4 (contractor $30–$75/sq ft, suite $75–$120+; Cost vs Value 2025 midrange about $52,000). New small rival calc.boltcoin.network: ZIP-based, national benchmark $48,550 for 800 sq ft with rooms and a bedroom (labour 288 hrs × $38.37 × 1.40 = $15,471; materials $17,600). nrtechstudio's new basement tool is a size/code calculator, not a cost calculator.

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

How this calculator was checked

Figures checked 26 November 2026. Each case below was recomputed from the calculator's own formula and matched the tool's output.

Test inputsExpected result
40 × 25 ft (1,000 sq ft), 8 ft ceiling, unfinished, standard finish, vinyl plank, no bedrooms/bath/kitchenette/theater, dry, average region, 15% contingency (defaults)components $27,500 (framing $5,500 · drywall $5,500 · electrical $5,000 · HVAC $3,000 · ceiling $5,000 · trim $3,500) + flooring $6,000 = $33,500 subtotal; permits $502.50; contingency $5,100.38; total $39,102.88 ($39.10/sq ft, $420.90/m²); planning range $33,237–$44,968; CvV recoup $27,763.04; ceiling passes R305.1
40 × 20 ft (800 sq ft), standard finish, vinyl plank, 1 bedroom, full bathroomcomponents $22,000 + flooring $4,800 + egress $4,244 + bathroom $15,000 = $46,044; permits $690.66; total $53,744.86 ($67.18/sq ft) — cross-check: boltcoin’s published 800 sq ft rooms-plus-bedroom benchmark is $48,550
1,000 sq ft, basic finish, carpetcomponents $19,500 ($19.50/sq ft) + flooring $4,000; permits $500 (floor); total $27,600 ($27.60/sq ft) — inside Block Renovation’s $25–$40 basic band
1,000 sq ft, high finish, tile, full bathroom, kitchenettecomponents $40,500 ($40.50/sq ft) + flooring $10,000 + add-ons $25,000 = $75,500; permits $1,132.50; total $88,127.38 ($88.13/sq ft) — inside the $75–$120+ living-suite band
1,000 sq ft, half-finished start (0.50 scope factor), standard finish, vinyl plankcomponents $13,750 + flooring $6,000; total $23,287.50 ($23.29/sq ft) — at the top of Angi’s $7–$23 half-finished band
1,000 sq ft, damp basement (waterproofing $7.50/sq ft)waterproofing +$7,500; subtotal $41,000; permits $615; total $47,857.25 ($47.86/sq ft)
Metric — 10 × 6 m (60 m²), 2.4 m ceiling, standard finish, vinyl plank645.83 sq ft; components $17,760.45 + flooring $3,875.01; permits $500; total $25,455.78 ($424.26/m², $39.42/sq ft); ceiling 7.87 ft passes R305.1 — cross-check: themagiccodex’s 60 m² mid figure is $54,500 ($908.33/m²) with waterproofing, a bathroom and a bedroom baked into its scope
Ceiling 6.5 ft / 6 ft 8 in / 7 ft (code gate)6.5 ft fails R305.1 for habitable rooms; 6 ft 8 in meets only the bathroom/laundry minimum; 7 ft passes the habitable minimum

What this check does not cover

  • Component rates are published national installed ranges (toolwick method), not quotes; your contractor’s rates replace them.
  • Starting-scope and region factors are planning factors — no source publishes a complete table; the half-finished factor is set to land inside Angi’s $7–$23 band.
  • Waterproofing is a $5–$10/sq ft allowance, not a full exterior system ($6,000–$18,000); fix water before finishing.
  • Code figures are the 2021 IRC (R304, R305.1, R310); local amendments can be stricter — confirm with your building department.
  • The 71% recoup is the Cost vs Value 2025 national average; below-grade area is not gross living area (ANSI Z765).
Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • This is a planning estimate, not a contractor quote and not a permit approval. It prices the finish from published per-square-foot component rates, flat room add-ons and a permits-plus-contingency build. It does not inspect your foundation, your drainage, your radon level, your electrical panel capacity or your sewer line — and any one of those can move the real price by five figures. A contractor’s site visit and your building department decide those; this page tells you which budget to take to both.
  • The per-square-foot figures in the published guides disagree because they price different scopes, not because one of them is wrong: $7–$23 per sq ft is a half-finished or bare-bones scope (Angi, NerdWallet), $30–$75 is a contractor-led standard finish (HomeGuide $30–$50; Block Renovation $25–$40 basic, $40–$75 mid-range), and $75–$120+ is a living suite with a bathroom and kitchenette. This tool itemises the rooms instead of hiding them in one rate, so you can see which band your own scope lands in.
  • The starting-scope factors (unfinished 1.00, half-finished 0.50, finished remodel 0.85) and the region factors (low-cost 0.90, average 1.00, high-cost 1.15) are planning factors, labelled as such. No published source prints a complete scope or region table for basement finishing — the factors are set so the half-finished result lands inside Angi’s published $7–$23 band, and your quotes replace them.
  • The code figures are the 2021 International Residential Code: habitable rooms need a 7 ft ceiling (R305.1; bathrooms and laundry rooms 6 ft 8 in; beams and ducts may project to 6 ft 4 in), every basement bedroom needs an egress opening of 5.7 sq ft net clear with a 24 in minimum height, 20 in minimum width and a sill no more than 44 in above the floor (R310), and a habitable room needs at least 70 sq ft and 7 ft in any horizontal dimension (R304). Your jurisdiction may adopt a different edition or amend these numbers — confirm with your building department before you frame a bedroom.
  • Waterproofing is priced at $7.50 per sq ft, the midpoint of the published $5–$10 band (average job about $4,500). That is a surface/interior allowance, not a full exterior excavation and membrane system, which HomeGuide puts at $6,000–$18,000. If water is coming through the wall, fix the water first and get the waterproofing quoted separately — finishing over a damp wall traps the problem behind new drywall.
  • The resale check uses the 2025 Cost vs Value national average for a basement remodel ($52,012 job cost, $36,905 resale value, 71% recouped). It is a survey average across 119 US markets, not a promise for your street — and under ANSI Z765, below-grade square feet are reported as basement area, not added to gross living area, so the finished space is valued on its own line rather than at the above-grade price per square foot.

Basement Finishing Cost Calculator — How Much Does It Cost to Finish a Basement? — frequently asked questions

How much does it cost to finish a basement?

A 1,000 sq ft unfinished basement at a standard finish costs $39,103 — $39.10 per sq ft — with permits and 15% contingency. The published range is wide because the scope is: $7–$23 per sq ft half-finished (Angi), $30–$75 per sq ft for a contractor-led standard finish, $75–$120+ per sq ft for a living suite with a bathroom and kitchenette. The national average project is about $32,000 (Angi, NerdWallet), but that average is mostly partial finishes. Enter your size and rooms above for your exact build.

How much does it cost to finish a 1,000 sq ft basement?

$39,103 as an open standard-finish room; $88,127 as a full suite. The open room: $27,500 of components + $6,000 of vinyl plank flooring + $503 of permits + $5,100 of contingency. The suite adds tile flooring, a full bathroom ($15,000) and a kitchenette ($10,000) at the high finish level. Published bands for the same size: $7,000–$23,000 half-finished, $30,000–$75,000 standard, $75,000–$120,000+ suite — the tool’s two figures sit inside the standard and suite bands.

How much does it cost to finish an 800 sq ft basement?

$31,395 as an open room, $53,745 with one bedroom and a full bathroom. The bedroom adds a $4,244 egress window and the bathroom $15,000 — rooms, not walls, are the difference. The published cross-check for 800 sq ft with rooms and a bedroom is boltcoin’s $48,550 benchmark; this tool reads 10.7% higher, inside the ±15% planning range, with the gap in the bathroom and egress scope.

What is the cost per square foot to finish a basement?

It depends entirely on the scope: $7–$23 half-finished, $25–$40 basic, $30–$75 standard, $75–$120+ suite. This tool builds the rate from six component trades ($19.50 basic, $27.50 standard, $40.50 high per sq ft) plus flooring ($4–$10), then adds the rooms as flat lines — so your effective rate is printed from your own scope instead of borrowed from a guide pricing a different one. The default open room works out to $39.10 per sq ft all-in.

How much does a basement bathroom add?

$8,000 for a half bathroom, $15,000 for a full bathroom in this tool — inside the published spreads. A basic bathroom as a flat add-on is published at $6,500; a full bathroom with new drain and supply lines runs $10,000–$25,000; one transparent labour model prices a half bath at +$8,125 and a full bath at +$14,975 on an 800 sq ft finish. Breaking the slab for drains, and an ejector pump if the drain is below the sewer line, decide where in the range you land.

Do I need a permit to finish a basement?

Almost always, yes. Framing, electrical, plumbing, HVAC and bedroom egress work typically require permits and inspections. Budget $500–$2,500 (Angi puts it at $1,200–$2,000; some municipalities charge 1–2% of project value). This tool prices permits at the larger of $500 or 1.5% of the subtotal. Unpermitted space can be valued at zero at appraisal and flagged at sale — the permit is the cheapest line in the build.

What ceiling height do I need to finish a basement?

7 feet for habitable rooms, measured from the finished floor to the finished ceiling (2021 IRC R305.1). Bathrooms, toilet rooms and laundry rooms need 6 ft 8 in; beams, girders and ducts may project to within 6 ft 4 in of the floor. Measure after subtracting your subfloor, flooring and ceiling finish from the joist height — a bare 7 ft 2 in can finish below the line. Some jurisdictions allow reduced heights in existing basements; confirm with your building department.

What size egress window does a basement bedroom need?

5.7 sq ft of net clear opening, at least 24 in high and 20 in wide, with the sill no more than 44 in above the floor (2021 IRC R310). Note the trap: 20 in × 24 in is only 3.3 sq ft — a 20 in wide opening must be 41 in high, or a 24 in high opening 34.2 in wide, to reach 5.7 sq ft. Below grade, the window well needs at least 9 sq ft with 36 in minimum dimensions, and a ladder if it is over 44 in deep. Installed, budget about $4,244 per bedroom (Angi 2026 average, $2,723–$5,898).

Does finishing a basement increase home value?

Yes — about 71% of the cost comes back at resale on the national average, but the space does not count as living area. Cost vs Value 2025 puts a basement remodel at $52,012 of job cost and $36,905 of resale value (71% recouped). Under ANSI Z765, however, below-grade square feet are reported as basement area, not added to gross living area — so the value arrives on its own appraisal line, not at the above-grade price per square foot. Finish it because you will use it; treat the recoup as a partial refund.

How long does it take to finish a basement?

About 6–10 weeks for a typical 600–1,200 sq ft finish (planning estimate), plus permit and inspection waits. Under 600 sq ft runs 4–6 weeks; over 1,200 sq ft, 10–14 weeks; a bathroom adds about 2 weeks for rough-in and inspections. Waterproofing, a new egress cut in poured concrete, and any structural work sit outside those ranges — they are sequenced before the finish clock starts.

How much does it cost to finish a basement per square metre? (metric)

The default 1,000 sq ft (92.9 m²) standard finish is $39,103 — $420.90 per m². A 60 m² basement (10 × 6 m) at the same level is $25,456, or $424.26 per m². The metric figure in the field is themagiccodex’s $450/$800/$1,400 per m² by level (60 m² mid → $54,500, $908.33/m²) — higher because that scope bakes waterproofing into every level and includes a bathroom and bedroom in the headline. Switch the unit above to metres and the tool prices in m² directly.

What does a basement bedroom need to be legal? (metric)

Three gates, in metric: a 2.13 m (7 ft) ceiling, a room of at least 6.5 m² (70 sq ft) and 2.13 m in any direction, and an egress opening of 0.53 m² (5.7 sq ft) net clear. The egress opening needs at least 610 mm clear height and 508 mm clear width with the sill no more than 1,118 mm above the floor (2021 IRC R310); the room minimums are R304 and the ceiling is R305.1 (bathrooms 2.03 m). A 2.4 m ceiling — the metric default above — passes the habitable gate at 7.87 ft.

Next step

Take the component build, the room add-ons and the ±15% planning range to three contractors — and make them quote the same rooms, the same finish level and the same waterproofing state, or the quotes cannot be compared. Then price the trades inside the build: the walls with the insulation calculator and the drywall calculator, the framing with the framing calculator, the floor with the flooring calculator, the paint with the paint calculator, a bathroom with the bathroom remodel cost calculator, a kitchenette with the kitchen remodel cost calculator, the heating load with the heat pump size calculator, the damp air with the dehumidifier size calculator, and the running cost with the electricity cost calculator. Fix any water first, and confirm the ceiling and egress gates with your building department before a bedroom goes on the plan.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.