Mortar Calculator
A mortar estimate is really two numbers that refuse to agree: the volume the joints actually hold, and the bags the manufacturer says you need. Pure joint geometry says 1,000 standard bricks need about 8.1 ft3 of wet mortar; QUIKRETE says one 80 lb bag of Mason Mix lays up to 37 bricks, which is 28 bags per 1,000. Both are right about different things — the geometry counts only the joints, while the manufacturer coverage already allows for spillage, tooling, frog filling and the odd short bag. This mortar calculator works from your wall length and height in feet or metres, subtracts window and door openings, takes your joint width and your brick or block type, and gives you both figures: the wet mortar volume (in ft3 and m3), the site-mix split into cement, lime and sand for Type N, S or M, the pre-mixed bag count to buy, and an optional installed-cost estimate. If you have ever searched "how many bags of mortar do I need" or "how much mortar do I need for a wall", this is that answer, with the reason the two methods disagree stated instead of hidden. For the bricks or blocks themselves, use the brick calculator or the concrete block calculator, and convert volumes with the cubic yard calculator.
Planning this project? Save to Pinterest to find this calculator again later.
How to use the Mortar Calculator
- Measure the wall length and height in feet or metres and enter both — the calculator subtracts the openings area you enter, so measure doors and windows too and add their areas together.
- Pick the wall type: single wythe for a normal wall or a veneer skin, double wythe for a wall two units thick (it needs twice the mortar).
- Pick the unit type: US modular brick, UK standard brick, or 8x8x16 concrete block. The joint geometry and the bag coverage change with the unit.
- Enter the joint width you will actually lay — 3/8 in (10 mm) is standard. This is the input most estimators skip, and it moves the volume more than any other single choice.
- Pick the mortar type by exposure, not by price: Type N (750 psi) for most above-grade brickwork, Type S (1,800 psi) for below-grade and structural walls, Type M (2,500 psi) for heavy loads. The type changes the cement/sand split, not the volume.
- Read the wet mortar volume first if you are site-mixing (it feeds the cement, lime and sand split), and the pre-mixed bag count first if you are buying bags. Buy the bag count, not the volume divided by a guessed bag yield.
- Enter your per-bag price and labour rate for an installed-cost estimate — useful for comparing DIY against a mason's quote.
Mortar Calculator formula
Worked example
A 20 x 8 ft wall with 15 ft2 of openings, single wythe US modular bricks, 3/8 in joints, Type N, 10% waste. Step one — gross area: 20 x 8 = 160 ft2. Step two — net area: 160 - 15 = 145 ft2. Step three — units: face = 8 x 2.625 in = 21 in2, so 145 x 144 / 21 = 994.29 bricks. Step four — wet mortar: 994.29 x 0.008064 ft3 = 8.02 ft3; with 10% waste = 8.82 ft3 (0.25 m3). Step five — site mix: dry volume = 8.82 x 1.33 = 11.73 ft3; Type N (1:1:6, 8 parts) gives cement 11.73 / 8 = 1.47 ft3 (about 60 kg, 2 x 94 lb bags), lime 1.47 ft3, sand 11.73 x 6 / 8 = 8.80 ft3 (0.25 m3, about 399 kg). Step six — pre-mixed bags: buy count = 994.29 x 1.10 = 1,093.7, rounded up = 1,094 bricks; 1,094 / 37 = 29.57, rounded up = 30 x 80 lb bags. Step seven — cost at $8 per bag and $4 per ft2 labour: bags $240 + labour 145 x $4 = $580, installed total $820.
Metric version: a 6 x 2.4 m wall with 1.4 m2 of openings, UK standard single skin bricks, 10 mm joints, Type N, 10% waste. Gross area = 6 x 2.4 = 14.4 m2; net = 14.4 - 1.4 = 13.0 m2; units = 13.0 / 0.016875 = 770.37 bricks; wet mortar = 770.37 x 0.00029725 m3 = 0.229 m3; with 10% waste = 0.252 m3 (8.90 ft3). Dry volume = 0.252 x 1.33 = 0.335 m3; cement = 0.335 / 8 = 0.0419 m3 (about 60 kg, 2 x 94 lb bags); sand = 0.335 x 6 / 8 = 0.251 m3 (about 402 kg). Pre-mixed bags: buy count = 770.37 x 1.10 = 847.4, rounded up = 848 bricks; 848 / 37 = 22.92, rounded up = 23 x 80 lb bags. — or 34 x 25 kg bags (848 ÷ 25.48 = 33.28, rounded up; 25 kg lays 25.48 bricks when the 37-brick 80 lb coverage is scaled by bag weight, a stated assumption, not a manufacturer claim).
Coverage / yield reference — wet mortar volume and pre-mixed bags, before waste unless stated:
| Unit / wall | Wet mortar | Pre-mixed bags (80 lb) |
|---|---|---|
| US modular, single wythe, per 100 ft2 | 5.53 ft3 | 21 bags (755 bricks to buy at 10% waste) |
| UK standard, single skin, per 100 m2 | 1.76 m3 | 177 bags (6,519 bricks to buy at 10% waste) |
| Concrete block 8x8x16, per 100 ft2 | 1.42 ft3 | 10 bags (124 blocks to buy at 10% waste) |
| Per 1,000 US modular bricks | 8.06 ft3 | 28 bags (30 with 10% waste) |
| Per 1,000 UK standard bricks | 0.30 m3 | 28 bags (30 with 10% waste) |
| Per 1,000 concrete blocks | 12.61 ft3 | 77 bags (85 with 10% waste) |
Measurement tips
- Buy by the bag count, not by dividing the volume by a guessed bag yield. QUIKRETE publishes coverage (37 bricks or 13 blocks per 80 lb bag), not a cubic-foot yield — any volume-to-bags conversion invents a yield the data sheet never states.
- Enter the joint width you will actually lay. Widening joints from 3/8 in to 1/2 in raises mortar per square foot by about 27% on modular brick — the single biggest lever on the estimate after wall size.
- Choose mortar type by exposure, not by price. Below-grade and structural walls normally call for Type S (1,800 psi); Type M (2,500 psi) for heavy loads and foundations; Type N (750 psi) suits most above-grade brickwork. The type does not change the volume — only the cement/sand split.
- Keep pre-mixed bags dry and buy them in one trip from the same batch. Opened bags absorb moisture and go lumpy, and mortar colour varies between batches on visible work.
- For site-mixed mortar, batch by volume with a gauge box, not by shovel — shovel counts drift by a third across a day, and a drifting mix drifts in strength with it.
- Order the units and the mortar together. The bag count on this page is sized from the buy count (with waste), so the mortar does not run out one course before the bricks do.
- On block walls, remember the cores: this calculator sizes face-shell mortar only. Grouted cores, bond beams and reinforced cells take additional grout that is not in this estimate.
Common mistakes
- Dividing the mortar volume by 0.6 ft3 per bag. That 0.6 ft3 figure belongs to QUIKRETE concrete mix, not Mason Mix — the Mason Mix data sheet publishes coverage per bag, and using the concrete yield understates the bag count badly.
- Forgetting the joint width. A calculator that never asks for joint width is assuming one for you — usually 3/8 in — and a 1/2 in joint on your wall takes about 27% more mortar per square foot.
- Counting the gross wall area. Openings for doors and windows are the biggest source of over-ordering — a single door is about 21 ft2 of wall you are not mortaring.
- Using the textbook 15-bag figure as a shopping list. The nominal-volume figure (about 15 bags worth of volume per 1,000 bricks at 10% waste) counts a 4-in-thick wall and no spillage — the manufacturer coverage of 30 bags at the same waste is what keeps a wall going to the last course.
- Sizing pre-mixed bags from the exact unit count instead of the buy count. This calculator sizes bags from the buy count (with waste), so the bags do not run out mid-wall.
- Choosing Type N for a structural or below-grade wall. Type N is cheaper per bag, but its 750 psi rating is wrong for footings, foundations and retaining work — check local code before you pick.
- Butter-boarding block cores into the estimate — or leaving them out. Face-shell mortar and core grout are different materials on different lines: this page covers the first only, so price grout separately where the design calls for it.
Factors that affect accuracy
- Wall openings: every door and window you subtract removes units and mortar — net area is the input that matters, not gross.
- Joint width: mortar per unit grows with the joint on both faces — 3/8 in to 1/2 in adds about 27% per square foot on modular brick, and the effect is larger on small units than on large ones.
- Unit size: small bricks mean many joints per square foot, so brick walls take far more mortar per square foot than block walls (5.53 ft3 per 100 ft2 for brick vs 1.42 ft3 for block, before waste).
- Wythe count: double wythe doubles the mortar volume and roughly doubles the bags; veneer does not — it is a single skin.
- Bedding style: blocks are bedded on face shells, not full-bed — a full-bed block calculation would overstate block mortar roughly fivefold, which is why the block preset uses the shell method.
- Waste: spillage, tooling, frog filling and dropped mortar are real consumption — 10% is the floor for most walls, 15% for irregular units or first-time work.
- Coverage assumption: 37 bricks or 13 blocks per 80 lb bag (QUIKRETE published) with 60 lb figures scaled linearly. A different brand's chart, if it lists one, overrides both.
- Mix type: Type M, S and N change the cement/lime/sand split and the strength (2,500 / 1,800 / 750 psi), never the volume.
Sources & assumptions
- Mortar volume method: wet mortar = units x mortar per unit, where mortar per brick = unit depth x ((unit length + joint) x (unit height + joint) - unit length x unit height), and mortar per block = 2 x 1-1/4 in shell width x joint x (unit length + unit height) for face-shell bedding (a stated assumption, not a quoted standard).
- Unit actual sizes: US modular brick 7-5/8 x 2-1/4 x 3-5/8 in; UK standard brick 215 x 102.5 x 65 mm with 10 mm joints; standard block 8x8x16 in nominal, actually 7-5/8 x 7-5/8 x 15-5/8 in (3/8 in joints). Brick counts here use literal joint geometry, so at the default 3/8 in joint they run about 1.6% above the brick calculator's BIA nominal figure (6.86 vs 6.75 per ft2) — use the brick calculator for ordering bricks.
- Pre-mixed bag coverage: QUIKRETE Mason Mix data sheet — one 80 lb (36.3 kg) bag lays up to 37 standard bricks or 13 standard (8 in x 8 in x 16 in) blocks. The 60 lb figures (27.75 bricks, 9.75 blocks) scale that published coverage linearly by bag weight — a stated assumption, not a manufacturer claim. The data sheet publishes coverage, not a cubic-foot yield, so this page never converts volume to bags by an invented yield.
- Theoretical-vs-manufacturer gap, stated on the page: joint geometry gives 8.06 ft3 per 1,000 modular bricks; the textbook nominal-volume method gives 13.39 ft3 per 1,000 (14.7 ft3 with 10% waste) because it counts a 4-in-thick wall instead of the real 3-5/8 in thickness; QUIKRETE coverage gives 28 bags per 1,000 with no waste, 30 with 10% waste, 32 with 15% waste. Buy by the bag count.
- Mortar types per ASTM C270 (same QUIKRETE sheet): Type M 2,500 psi, Type S 1,800 psi, Type N 750 psi; proportion specs M 1:1/4:3, S 1:1/2:4-1/2, N 1:1:6 (cement:lime:sand). Mix type changes the cement/lime/sand split and the strength, never the volume or the bag coverage.
- Dry mix volume = wet volume (with waste) x 1.33, the standard quantity-surveying factor for mortar (dry ingredients lose about a quarter of their volume when water is added). Cement density 1,440 kg/m3, sand 1,600 kg/m3; one 94 lb bag of portland cement occupies about 1 ft3.
- Cost, when shown, uses only the price per pre-mixed bag and labour rate you enter — no prices are preset. Pre-mixed bags are sized from the buy count (with waste), not the exact count.
Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.
Safety note
What this calculator doesn't do
- Brick and block counts on this page come from literal joint geometry — face = (unit length + joint) x (unit height + joint). At the default 3/8 in joint that gives 6.86 modular bricks per ft2, about 1.6% above the brick calculator's BIA nominal figure of 6.75 per ft2 (which uses a rounded 2-2/3 in course height). Use the brick calculator for ordering bricks; use this page for mortar.
- Block mortar assumes face-shell bedding: two mortar strips about 1-1/4 in wide under each block, plus head joints on the same shells. A block wall buttered full-bed, or grouted solid, takes far more mortar — this calculator does not model grouted cores.
- Pre-mixed bag counts use QUIKRETE's published coverage (80 lb -> 37 bricks or 13 blocks). The 60 lb figures (27.75 bricks, 9.75 blocks) scale that coverage linearly by bag weight — a stated assumption, not a manufacturer claim. A different brand's chart, if it lists one, overrides both.
- Site-mix cement and sand come from the wet mortar volume x the 1.33 dry factor, split by the ASTM C270 proportion for the type you pick. The dry factor is a quantity-surveying convention, not a manufacturer figure — if your supplier quotes a different factor, their number governs.
- Mix type changes strength, not volume. Type M, S and N all fill the same joints; only the cement/lime/sand split changes. Pre-mixed bag coverage does not change with type either.
- Cost is an estimate only, from the price per bag and labour rate you enter — no prices are preset. Labour rates vary widely by region and by whether the wall is structural.
- This page sizes mortar only. It does not size footings, lintels, reinforcement or wall ties, and it does not approve a structural design — check your local building code for walls over about 4 ft.
Mortar Calculator — frequently asked questions
How many bags of mortar do I need for a 20x8 ft wall?
30 x 80 lb bags for a 20 x 8 ft wall with 15 ft2 of openings, single wythe US modular bricks, 3/8 in joints, 10% waste — 1,094 bricks to buy (994.29 exact x 1.10, rounded up) / 37 bricks per bag = 29.57, rounded up to 30. Wet mortar volume for the same wall: 8.82 ft3 (0.25 m3) including waste.
How much mortar do I need for 1,000 bricks?
8.06 ft3 of wet mortar per 1,000 US modular bricks by pure joint geometry (13.93 in3 per brick at 3/8 in joints) — but buy 28 x 80 lb bags with no waste allowance, or 30 bags with 10% waste (1,100 / 37 = 29.73, rounded up). The textbook nominal-volume method gives 13.39 ft3 per 1,000 (14.7 ft3 with 10% waste, about 15) because it counts a 4-in-thick wall instead of the real 3-5/8 in thickness. Buy by the bag count: it already allows for spillage, tooling and frog filling.
How many bags of mortar do I need for 100 bricks?
3 x 80 lb bags for 100 bricks to buy (100 / 37 = 2.70, rounded up), or 4 x 60 lb bags (100 / 27.75 = 3.60, rounded up). Size bags from the buy count (with waste), not the exact count — 100 bricks exact with 10% waste is 110 to buy, which still needs 3 x 80 lb bags (110 / 37 = 2.97, rounded up).
How much mortar do I need for a 10 m2 wall?
0.19 m3 of wet mortar for a 10 m2 UK standard single skin wall with 10 mm joints, 10% waste — 592.59 bricks exact (10 / 0.016875) x 0.00029725 m3 per brick = 0.176 m3, x 1.10 = 0.194 m3. Pre-mixed bags: 652 bricks to buy (592.59 x 1.10, rounded up) / 37 = 17.62, rounded up to 18 x 80 lb bags.
How many bags of mortar do I need for a 6 x 2.4 m wall?
23 x 80 lb bags for a 6 x 2.4 m wall with 1.4 m2 of openings, UK standard single skin, 10 mm joints, 10% waste — net 13.0 m2, 770.37 bricks exact, buy 848 (770.37 x 1.10, rounded up), 848 / 37 = 22.92, rounded up to 23. Wet mortar: 0.252 m3 (8.90 ft3) including waste.
How much mortar do I need per square metre?
0.0176 m3 of wet mortar per square metre for a UK standard single skin wall with 10 mm joints (0.0194 m3 with 10% waste), and 0.0169 m3 per square metre for a US modular single wythe wall with 3/8 in joints (0.0185 m3 with 10% waste). In imperial units: 0.0553 ft3 per ft2 for modular brick, but only 0.0142 ft3 per ft2 for block face-shell bedding (1.42 ft3 per 100 ft2). Block walls take far less mortar per square foot because most of the face is hollow core, not joint.
How many bags of mortar do I need for concrete blocks?
10 x 80 lb bags for 100 ft2 of 8x8x16 block wall, 3/8 in joints, 10% waste — 112.5 blocks exact (100 x 144 / 128), buy 124 (112.5 x 1.10, rounded up), 124 / 13 blocks per bag = 9.54, rounded up to 10. Per 1,000 blocks: 77 bags with no waste (1,000 / 13 = 76.92, rounded up), 85 bags with 10% waste. In 60 lb bags (9.75 blocks each, scaled): 13 bags per 100 ft2.
Should I use Type N, S or M mortar for a brick wall?
Type N (750 psi, 1:1:6 cement:lime:sand) for most above-grade, non-structural brickwork; Type S (1,800 psi, 1:1/2:4-1/2) for below-grade, structural and high-exposure walls; Type M (2,500 psi, 1:1/4:3) for heavy loads, foundations and masonry in contact with earth. All three are ASTM C270 types from the same QUIKRETE data sheet family, and the choice does not change bag coverage or mortar volume — only strength and the cement/sand split. Check your local code for structural walls.
How does joint width change how much mortar I need?
A lot: widening modular-brick joints from 3/8 in to 1/2 in raises mortar per square foot by about 27% — from 0.0553 ft3 per ft2 to 0.0701 ft3 per ft2 — because the joint grows on both the bed and the head of every brick. On the 20 x 8 ft example wall (145 ft2 net), that is 8.02 ft3 wet before waste at 3/8 in versus 10.17 ft3 at 1/2 in. Always enter the joint you will actually lay.
How much cement and sand do I need for mortar?
For the 20 x 8 ft example wall (8.82 ft3 wet mortar with 10% waste, Type N): dry volume = 8.82 x 1.33 = 11.73 ft3; cement = 11.73 / 8 = 1.47 ft3 (about 60 kg, 2 x 94 lb bags); lime = 1.47 ft3; sand = 11.73 x 6 / 8 = 8.80 ft3 (0.25 m3, about 399 kg). The 1.33 dry factor accounts for the voids in dry cement and sand that close up when water is added. Switch to Type M (1:1/4:3, 4.25 parts) and the same wall needs 2.76 ft3 of cement (3 x 94 lb bags) and 8.28 ft3 of sand.
How much mortar do I need for a double wythe wall?
Double the single-wythe figure: the 20 x 8 ft example wall as a double wythe wall needs 16.03 ft3 of wet mortar before waste, 17.64 ft3 with 10% waste — and 60 x 80 lb bags (2,188 bricks to buy / 37 = 59.13, rounded up). A brick veneer wall does not double: veneer is a single skin, so it takes the single-wythe figure.
How much does mortar cost per square foot?
It depends on your local prices, so this calculator presets none: installed cost = pre-mixed bags x your price per bag + net wall area x your labour rate per square foot (or per square metre). On the example wall at $8 per bag and $4 per ft2 labour: bags $240 + labour 145 x $4 = $580, installed total $820. Enter both prices above and the calculator totals them; labour is charged on the net area after openings.
Next step
Take the mortar volume and bag counts to the masonry supplier and confirm the unit size and joint width on your order match the estimate — then check your local building code for footing, height and permit rules before you lay the first course.
Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.