Bathroom Remodel Cost Calculator — How Much Does a Bathroom Remodel Cost?
A bathroom remodel is the room where every calculator disagrees the most — and the disagreement is honest. The same full bathroom is $12,500 on one page, $15,950 on the next, and $7,662.50 on a third, and all three pages are doing honest arithmetic from different methods: one prices by the square foot, one prices from a fixture table, and one builds the job up from component prices while leaving the plumbing, permits and demolition out. This bathroom remodel cost calculator shows you why: it prices your bathroom from the fixture-driven base table — scope by finish tier, scaled by room size, labour approach and region — splits the total into the ten published component lines so you can see where the money goes, and cross-checks the whole thing bottom-up from component prices, with the exclusions named, so the gap between the two methods is explained rather than hidden. It also answers the two questions that decide whether the job is worth doing at all: what the 2025 Cost vs Value report says a bathroom returns at resale, and whether the total is a sensible share of your home’s value. And because the calendar matters now: if your vanity is imported and enters the US in 2027, the Section 232 duty doubles from 25% to 50% on 1 January 2027 — the tariff toggle re-prices the vanity line for that. For the pieces of the job, price the tile with the tile calculator and the bathroom tile cost guide, the fan with the bathroom fan calculator, the floor with the flooring calculator and the flooring installation cost guide, the walls with the paint calculator and the paint a room cost guide, the power with the electricity cost calculator, the counters with the countertop calculator, and the matching kitchen job with the kitchen remodel cost calculator.
- A full bathroom at midrange costs $14,500 before contingency — $15,950 with the 10% contingency ($319 per sq ft on a 50 sq ft bath).
- The national average is $12,157 (Angi, 28,374 projects) — but it mixes powder rooms and primary baths, so a full midrange bath sits above it; costto.build’s model average is $12,343.
- Labour is the biggest cost at 40–65% of the total (Angi) — and DIY-plus-trades saves 40%, $5,800 on the canonical $14,500 job.
- The component cross-check prices the same 60 sq ft bathroom at $7,662.50 — but it excludes permits, plumbing moves, disposal and waterproofing repairs, so it always reads lower than the $15,950 fixture-driven total.
- A midrange bathroom recoups 80.0% at resale (2025 Cost vs Value) — the highest since 2007 — while a luxury one recoups 41.7%; the 2027 vanity tariff adds up to $435 to the canonical job if the vanity enters the US in 2027.
Planning this project? Save to Pinterest to find this calculator again later.
How to use the Bathroom Remodel Cost Calculator — How Much Does a Bathroom Remodel Cost?
- Pick the scope. Powder room (no tub or shower), full bath (tub or shower, toilet, vanity), primary or master bath (larger, often two vanities), or a tub-to-shower conversion. The scope picks the row of the base table — a powder room and a primary bath at the same area price very differently, which is why this tool is fixture-driven and not per-square-foot.
- Pick the finish tier. Budget is basic fixtures, ceramic tile and a stock vanity; midrange is better fixtures, porcelain tile and a semi-custom vanity; luxury is premium fixtures, stone tile and a custom vanity. The tier is the single biggest lever on the total — a primary bath runs $16,000 at budget and $55,000 at luxury before size or region.
- Pick the room size. Small (under ~40 sq ft, × 0.90), standard (about 40–60 sq ft, × 1.00) or large (over ~60 sq ft, × 1.15). The factor is small because fixtures and trades do not shrink with the room — a small bathroom still needs a vanity, a toilet and a plumber, which is why small baths cost more per square foot than large ones.
- Pick the cost region. Low (× 0.92), average (× 1.00) or high (× 1.12) — planning factors, not a published table: high 1.12× is nrtechstudio’s published West multiplier, and low 0.92× is the factor that reproduces their published $1,739 Midwest example. The Cost vs Value 2025 regional table below is the published regional data.
- Say who does the work. A professional contractor, or DIY-plus-trades at 0.60× — you do the demolition and finishing, licensed trades do the plumbing and electrical. That is a 40% saving on the job itself ($5,800 on the canonical $14,500 job), and it assumes you hire the trades for the wet work.
- Enter the floor area. A 5×8 ft bathroom is 40 sq ft; a 5×10 ft one is 50 sq ft. The area does not drive the fixture-driven total — it feeds the dollars-per-square-foot check line and the cross-check’s tile area.
- Add one flat extra, if any. A walk-in shower ($3,000), a freestanding tub ($2,500), heated floors ($1,500), a custom vanity ($2,000) or a plumbing relocation ($5,000) — toolfigure’s flat add-ons, and the region factor applies to them too. Use the “other upgrades” box for a second extra, or for anything not listed.
- Add other upgrades in dollars, if any. Accessibility features, a second vanity, a steam shower — anything the list does not cover. Enter 0 if none. The $88,936 worked example uses $5,800 here (heated floors + accessibility, combined).
- Answer the tariff question. If your vanity is imported and enters the US on or after 1 January 2027, the Section 232 duty is 50% instead of 25% — the toggle adds the 25-point step-up on the vanity line (12% of the base). It is an upper bound: the real duty is on the imported share’s customs value, not on the installed price, and the step-up is scheduled, not certain.
- Set the contingency. 10% is the default; 10–20% is the recommended range. Old bathrooms hide rot behind the tub, plumbing that does not meet code and floors that are not level — the contingency pays for what the demolition finds, and a job with no contingency is a job that stops halfway.
- Enter your home value, if you want the budget check. The tool compares the total with your home’s value against the published 10–15% guardrail. Leave it blank to skip the check.
- Set the cross-check picks. Tub or shower, vanity tier, toilet tier, tile material and the labour rate — themagiccodex’s price list. This only feeds the component cross-check below; the fixture-driven total does not depend on it.
- Read the base, the split and the total. The base is scope × tier × size × labour. The split shows where it goes — tile 18%, labour 16%, plumbing 14% and the rest. The subtotal adds the extras (scaled by region) and the tariff step-up; the total adds the contingency. The ±15% planning range is the honest band around it.
- Read the cross-check, the DIY comparison and the ROI. The component cross-check rebuilds the job from tub, vanity, toilet, tile and fixtures — it will read lower, because it excludes permits, plumbing moves, disposal and waterproofing repairs, and the page names that gap. The DIY comparison shows what the same job costs with you doing the demo and finishing. The Cost vs Value line shows what the 2025 report says a bathroom like yours returns at resale, and the home-value verdict says whether the total is a sensible share of your house.
Bathroom Remodel Cost Calculator — How Much Does a Bathroom Remodel Cost? formula
Base cost = scope × tier base cost × size factor × labour factor
Scope × tier base costs (nrtechstudio, pro-installed, standard size, national average): powder room $3,500 / $7,500 / $14,000 · full bath $7,500 / $14,500 / $26,000 · primary / master $16,000 / $30,000 / $55,000 · tub-to-shower conversion $3,000 / $5,500 / $9,000 (budget / midrange / luxury)
Size factors (planning model): small 0.90× · standard 1.00× · large 1.15× — region factors (planning model): low-cost 0.92× · average 1.00× · high-cost 1.12× — labour factors: professional 1.00× · DIY-plus-trades 0.60× (a 40.0% saving on the job itself). Large 1.15× and West 1.12× are nrtechstudio’s published factors; small 0.90× and low-region 0.92× are the factors that reproduce nrtechstudio’s published $1,739 worked example — no source publishes a complete bathroom size/region table, and the page says so
Vanity line = base × 12% (nrtechstudio’s split) — tariff uplift (2027 entry) = vanity line × 25%, the step-up from 25% to 50% duty, as an upper bound: it assumes the whole vanity line is dutiable customs value
Subtotal = (base + flat extras + other upgrades) × region factor + tariff uplift — contingency = subtotal × contingency % (default 10%) — total = subtotal + contingency — cost per sq ft = total ÷ area — planning range = total × 0.85 to total × 1.15
Component split (nrtechstudio, % of the regionalised base): tile 18% · general labour 16% · plumbing 14% · tub/shower 13% · vanity 12% · electrical 7% · demolition 6% · waterproofing 4% · permits/design 5% · paint 5% (= 100%)
Component cross-check (themagiccodex): tub $2,400 · walk-in shower $3,200 · tub-shower combo $2,800 · vanity $450 / $900 / $1,800 · toilet $200 / $350 / $700 · tile ceramic $10 (midpoint of $8–$12) / porcelain $18 (as stated) / stone $32.50 (midpoint of $25–$40) per sq ft · fixtures $600 · materials = tub/shower + vanity + toilet + (area × tile rate) + fixtures · labour = materials × 25% (20% simple swap, 30%+ layout moves; 25% OF MATERIALS COST — not of the total) · cross-check total = materials + labour · EXCLUDES permits, plumbing moves, disposal and waterproofing repairs
Per-square-foot check (toolfigure, labelled): budget $125 · midrange $250 · high-end $350 · luxury $500 per sq ft — the tool shows rate × area × region next to its own total so you can see the two methods side by side
Cost vs Value check (2025 edition, JLC): the tool matches your tier to the nearest CvV project — budget/midrange → midrange bathroom ($26,138 cost / $20,915 resale / 80.0% recouped) · luxury → upscale bathroom ($81,612 / $34,000 / 41.7%) — and shows the recouped value on your total at that rate. Universal design ($42,183 / $25,812 / 61.2%) is shown in the table as the accessibility tier
Home-value verdict: total ÷ home value — ≤ 15% is inside the 10–15% guardrail (nrtechstudio) · above 15% is above it
Timeline (nrtechstudio): powder room 1–2 weeks · full bath 2–4 weeks · luxury primary + layout change 6–9 weeks · moving plumbing +~2 weeks · luxury tile/stone +~1 week · tub-to-shower conversion 1–2 weeks (this page’s planning estimate)
1 sq ft = 0.092903 m² · 1 m² = 10.7639 sq ft · $1 per sq ft = $10.764 per m².
Worked example
Worked example — full bathroom, midrange, standard size, average region, professional, 50 sq ft, 10% contingency. This is the tool’s default, worked by hand so you can check it. It reproduces nrtechstudio’s published worked example exactly.
- Base: $14,500 (full bath, midrange) × 1.00 (standard) × 1.00 (professional) = $14,500.
- Subtotal: ($14,500 + $0 extras) × 1.00 (average region) = $14,500.
- Contingency: $14,500 × 10% = $1,450.
- Total: $14,500 + $1,450 = $15,950 ($319 per sq ft on 50 sq ft). Planning range: $15,950 × 0.85 to × 1.15 = $13,558–$18,343.
- Where the $14,500 goes (nrtechstudio’s split): tile $2,610 · general labour $2,320 · plumbing $2,030 · tub/shower $1,885 · vanity $1,740 · electrical $1,015 · demolition $870 · waterproofing $580 · permits/design $725 · paint $725.
- DIY version: the same job DIY-plus-trades is $14,500 × 0.60 = $8,700 before contingency — $9,570 with 10% — a $6,380 saving (40.0%) on the total.
- Per-square-foot check: toolfigure’s midrange rate is $250 per sq ft, so 50 × $250 = $12,500 (range $10,625–$14,375) — below the fixture-driven $15,950, because a per-square-foot rate spreads the fixed costs (vanity, toilet, plumber’s call-out, permits) over the area, and a 50 sq ft bathroom has little area to spread them over. That gap is the method, not a mistake.
- Resale check: midrange maps to the CvV 2025 midrange bathroom, which recouped 80.0% ($20,915 on $26,138). At that rate a $15,950 job returns about $12,760 — the resale value is a Realtor-survey estimate, not a promise. The National Association of Realtors’ 2025 survey puts bathroom renovation closer to 50% — the second number is in the table below.
- Home-value check: $15,950 ÷ $450,000 = 3.54% — well inside the 10–15% guardrail. The CvV midrange project itself ($26,138) is 5.8% of a $450,000 home.
- Tariff version: with an imported vanity entering in 2027, the vanity line is $14,500 × 12% = $1,740, so the 25-point step-up adds $1,740 × 25% = $435 (upper bound) → $14,935 before contingency, $16,429 with 10%.
Same method, 50 sq ft — the per-square-foot example. toolfigure’s worked example: 50 sq ft at the midrange rate of $250 per sq ft = $12,500, planning range $10,625–$14,375. ToolsPed’s published band for the same 50 sq ft midrange job is $10,000–$15,000 — midpoint $12,500, an exact match. The fixture-driven total for the same bathroom is $15,950, because it prices the fixtures and trades the per-square-foot rate averages away.
Component cross-check — 60 sq ft, walk-in shower, mid vanity, mid toilet, porcelain tile. This is themagiccodex’s published example, reproduced exactly: walk-in shower $3,200 · mid vanity $900 · mid toilet $350 · porcelain tile 60 × $18 = $1,080 · fixtures $600 · materials $6,130 · labour 25% of materials = $1,532.50 · $7,662.50 ($127.71 per sq ft). It reads far below $15,950 because it excludes permits, plumbing moves, disposal and waterproofing repairs — the gap is the exclusions, not a saving. A quote that matches the cross-check has left half the job out.
Big luxury job — primary bath, luxury, large, high-cost region, $5,800 upgrades, 15% contingency. This is nrtechstudio’s published worked example, with the derivation shown: base $55,000 × 1.15 (large) = $63,250 · + $5,800 upgrades (heated floors + accessibility, combined — the page does not itemise the split) = $69,050 · × 1.12 (high-cost region) = $77,336 subtotal · + 15% contingency $11,600 = $88,936. The upgrade total is back-solved from the page’s published subtotal; this page does not invent a heated-floor vs accessibility split.
Small budget job — powder room, budget, small, low-cost region, DIY-plus-trades, 0% contingency. Base $3,500 × 0.90 (small) × 0.60 (DIY) = $1,890 · × 0.92 (low-cost region) = $1,738.80 → $1,739 — nrtechstudio’s published worked example, reproduced exactly. The small 0.90× and low-region 0.92× factors are back-solved from this published total (the page’s calculator applies them; its article does not print them). With the default 10% contingency the same job is $1,913.
Metric twin — 5 m² bathroom, full bath, midrange. 5 m² is 53.82 sq ft, and the fixture-driven total does not depend on the area: the total is still $15,950, which is $3,190 per m² ($296 per sq ft on 53.82 sq ft). A 4.65 m² bathroom is 50 sq ft — the worked example above, in metric.
Bathroom remodel cost tables: base costs by scope and tier, cost by size, the component split, Cost vs Value 2025, and the 2027 vanity tariff
Why the same bathroom costs $7,662.50, $12,500 and $15,950. The field’s calculator pages agree on the arithmetic and still disagree on the answer by two to one, because they answer different questions. themagiccodex’s $7,662.50 prices the materials and the labour on them for a 60 sq ft bathroom — tub or shower, vanity, toilet, tile, fixtures — and states plainly that permits, plumbing moves, disposal and waterproofing repairs sit outside it. toolfigure’s $12,500 prices 50 sq ft at $250 per square foot. nrtechstudio’s $15,950 prices a full midrange bathroom from a fixture table and adds the 10% contingency. All three numbers are honestly computed; they are different jobs. This page prints the fixture-driven total first, shows the other two next to it, and names what each one leaves out — so you can see the spread instead of picking one silently.
The per-square-foot bands disagree by two times at the top — and the disagreement is scope, not error. Angi’s $70–$250 band mixes minor refreshes with full guts; HomeGuide’s full-remodel band is $250–$500; Fixr splits DIY ($70–$100) from pro ($120–$275). A powder-room refresh at $70 per sq ft and a full gut at $500 per sq ft are both inside somebody’s band. The table below shows all four, labelled by what they cover — and the small-bath rule that sits behind them: under about 50 sq ft, read the upper half of any band, because the vanity, the toilet, the plumber’s call-out and the permit cost nearly the same in any size room.
The labour-share disagreement, named. Angi’s headline is that labour is 40–65% of the total; costto.build puts labour, trades and removal at 53% of its $12,343 average; nrtechstudio’s component split puts general labour at 16% — plus plumbing at 14%, which is also labour. The 16% line excludes the trades embedded in the tile, tub and vanity lines, so it is a line-item view, not the whole labour bill. The page quotes Angi’s 40–65% as the headline and shows nrtechstudio’s ten lines as the split — both are true, on different bases.
The component cross-check is a partial build — that is the point. themagiccodex’s $7,662.50 for a 60 sq ft bathroom prices the shower, vanity, toilet, tile and fixtures plus 25% labour on materials — and states plainly that permits, plumbing moves, disposal and waterproofing repairs sit outside it. Against the fixture-driven $15,950 for a comparable full bath, the gap is about $8,300 of excluded work plus the labour on it. Use the cross-check to sanity-check the materials, not to set the budget: a quote that matches the cross-check has left half the job out. Two more of its examples, for scale: a 40 sq ft basic bathroom totals $5,076 and a 100 sq ft premium one $12,870.
The 2027 vanity tariff, in full. Section 232 duties on imported vanities are 25% now (since 14 October 2025, Proclamation 10976) and rise to 50% on 1 January 2027 (Proclamation 11000, published 9 January 2026 — it delayed the rise a full year from 1 January 2026, and it can be amended again by a later proclamation). The duty is on the customs value of the imported goods — not on the installed price — and the rate follows the date the vanity enters the US for consumption, not the date you order it. Country rates differ: the EU, Japan, South Korea and Taiwan are capped at 15% combined, the UK is at 10%, and China goes 50% → 75% (Section 232 plus Section 301, before anti-dumping and countervailing duties). Countries that reach an agreement with the US are excepted from the rise. Vanities are about 12% of a bathroom budget, so even a full pass-through of the 25-point step-up moves the total job by roughly 3% — $435 on the canonical $15,950 job, as an upper bound. If your vanity is already in the country, or enters before 1 January 2027, the 25% rate applies — ask your supplier when the vanity clears customs, not when the order is placed.
Cost vs Value is a Realtor survey, not a price. The 2025 Cost vs Value report (Journal of Light Construction, the latest edition — no 2026 edition exists as of November 2026) asks real-estate professionals what a remodel adds to a home’s resale value. A midrange bathroom recouped 80.0% — $20,915 back on $26,138, the highest since 2007, up from 73.7% in the 2024 edition. An upscale bathroom recouped 41.7% and a universal-design one 61.2%: the dearer the bathroom, the smaller the share that comes back. Those are national averages for a 5×7 ft bathroom; the regional table below shows the spread (Pacific 91%, Milwaukee 71.6%). The National Association of Realtors’ 2025 survey puts bathroom renovation at about 50% cost recovered, with a joy score of 9.8 out of 10 — a different method, and the reason this page shows both numbers.
Small bathrooms cost more per square foot. Angi’s size table shows it: a 25 sq ft bathroom is $72–$252 per sq ft and a 100 sq ft one is $70–$250 — the bands look the same, but the small bathroom’s total is $1,800–$6,300 against $7,000–$25,000 for the large one, and the fixed costs (design, permits, delivery, the plumber’s call-out) spread over fewer square feet. HomeGuide says the same thing directly: fixtures, trades and permits cost nearly the same in any size room, so under about 50 sq ft, read the upper half of the band.
Waterproofing is the classic false economy. It is 4% of the job — $580 on the canonical $14,500 bathroom — and it is the line people cut first, because it is invisible when the job is finished. A leak through a failed membrane is not a $580 repair: it is a rebuild of the floor, the subfloor and sometimes the ceiling below. The page’s split keeps waterproofing visible for exactly that reason, and themagiccodex excludes waterproofing repairs from its cross-check — so a quote that matches the cross-check has no waterproofing in it at all.
Scope × tier base costs (nrtechstudio — the planning basis of this page). Pro-installed, standard size, national average. The tub-to-shower row is a conversion, not a full remodel.
| Scope | Budget | Midrange | Luxury |
|---|---|---|---|
| Powder room / half bath | $3,500 | $7,500 | $14,000 |
| Full bath | $7,500 | $14,500 | $26,000 |
| Primary / master bath | $16,000 | $30,000 | $55,000 |
| Tub-to-shower conversion | $3,000 | $5,500 | $9,000 |
Cost by bathroom size (Angi, updated 27 Oct 2026). Most pay $6,651–$17,662 nationally; luxury can climb to $30,000+.
| Bathroom size | Cost range | Per sq ft |
|---|---|---|
| 25 sq ft | $1,800–$6,300 | $72–$252 |
| 40 sq ft | $2,800–$10,000 | $70–$250 |
| 50 sq ft | $3,500–$12,500 | $70–$250 |
| 75 sq ft | $5,300–$18,800 | $71–$251 |
| 100 sq ft | $7,000–$25,000 | $70–$250 |
Cost by scope, 35–50 sq ft (HomeGuide). The 5×7 ft (35 sq ft) and 5×10 ft (50 sq ft) breakdowns are HomeGuide’s own size table.
| Scope | 35–50 sq ft | 5×7 ft (35 sq ft) | 5×10 ft (50 sq ft) |
|---|---|---|---|
| Minor (refresh) | $3,500–$7,500 | $3,500–$5,300 | $5,000–$7,500 |
| Partial | $5,300–$15,000 | $5,300–$10,500 | $7,500–$15,000 |
| Full | $8,800–$25,000+ | $8,800–$17,500 | $12,500–$25,000 |
Where the money goes (nrtechstudio’s 10-component split, % of the base). The only complete published split that sums to 100%. Angi’s headline labour share (40–65% of the total) counts all trades; this split’s 16% “general labour” line excludes the trades inside the other lines.
| Component | Share | On a $14,500 base |
|---|---|---|
| Tile | 18% | $2,610 |
| General labour | 16% | $2,320 |
| Plumbing | 14% | $2,030 |
| Tub / shower | 13% | $1,885 |
| Vanity | 12% | $1,740 |
| Electrical | 7% | $1,015 |
| Demolition | 6% | $870 |
| Waterproofing | 4% | $580 |
| Permits / design | 5% | $725 |
| Paint | 5% | $725 |
Cost vs Value 2025 (Journal of Light Construction, national averages, 5×7 ft bathroom). The 2025 edition is the latest; the 2024 edition’s midrange figure was $25,251 at 73.7% — the recoup moved to 80.0% between editions.
| Project | Cost | Resale value | Recouped |
|---|---|---|---|
| Midrange bathroom remodel | $26,138 | $20,915 | 80.0% |
| Upscale bathroom remodel | $81,612 | $34,000 | 41.7% |
| Universal design bathroom | $42,183 | $25,812 | 61.2% |
Cost vs Value 2025 by region (midrange bathroom). The published regional data — use it instead of a region guess. National $26,138 is 1.00×.
| Region | Cost | Factor vs national | Recouped |
|---|---|---|---|
| Middle Atlantic | $30,158 | 1.15× | — |
| Pacific | $27,710 | 1.06× | 91% |
| New England | $27,559 | 1.05× | — |
| West North Central | $26,879 | 1.03× | — |
| National | $26,138 | 1.00× | 80.0% |
| South Atlantic | $25,609 | 0.98× | — |
| Mountain | $24,920 | 0.95× | — |
| East North Central | $24,910 | 0.95× | 70.9% |
| East South Central | $23,409 | 0.90× | — |
| West South Central | $22,995 | 0.88× | — |
Component prices (themagiccodex — the cross-check’s price list). Tile prices are planning prices; porcelain at $18 per sq ft is the page’s stated mid price, ceramic $10 and stone $32.50 are midpoints of the published bands.
| Component | Basic | Mid-range | Premium |
|---|---|---|---|
| Bathtub | $2,400 | ||
| Walk-in shower | $3,200 | ||
| Tub-shower combination | $2,800 | ||
| Vanity | $450 | $900 | $1,800 |
| Toilet | $200 | $350 | $700 |
| Tile (per sq ft) | $10 ceramic | $18 porcelain | $32.50 stone |
| Fixtures | $600 | ||
| Labour | 25% of materials cost (20% simple swap, 30%+ layout moves) | ||
Tier line-items, standard 5×8 full bath (hausbound — materials + labour combined). The only tier-by-line-item table in the field; lighting & electrical and “everything else” are its extra rows.
| Line item | Budget refresh | Mid-range gut | High-end |
|---|---|---|---|
| Labour (all trades) | $2,500–$4,000 | $6,000–$12,000 | $15,000–$25,000 |
| Tile & flooring | $800–$1,500 | $2,000–$4,500 | $5,000–$10,000 |
| Vanity & countertop | $400–$1,200 | $1,500–$3,500 | $4,000–$8,000 |
| Shower / tub & glass | $600–$1,500 | $2,500–$6,000 | $7,000–$15,000 |
| Plumbing fixtures | $300–$800 | $1,000–$2,500 | $3,000–$6,000 |
| Toilet | $150–$350 | $350–$700 | $700–$2,000 |
| Paint, drywall & trim | $150–$400 | $400–$900 | $900–$2,000 |
| Lighting & electrical | $200–$500 | $600–$1,500 | $1,500–$3,500 |
| Everything else | $400–$800 | $900–$2,000 | $2,000–$4,000 |
Itemised low / average / high (costto.build). Percentages are the page’s own rounded labels on its line-item subtotals — print its subtotals, not recomputed shares.
| Bucket | Share | Average |
|---|---|---|
| Materials & equipment | 27% | $3,335 |
| Labour, trades & removal | 53% | $6,482 |
| Design, permits & project | 20% | $2,526 |
| Total (average) | 100% | $12,343 |
Low $6,289 · average $12,343 · high $23,285. Note: this model excludes fixture relocation, waterproofing and heated floors — its average sits below the fixture-driven $15,950 for the same reason the cross-check does.
Per-square-foot bands, labelled by coverage. HomeGuide’s $150–$300 alone is the partial tier — the full scale is $100–$500.
| Source | Band | What it covers |
|---|---|---|
| Angi | $70–$250 per sq ft | All scopes mixed, 28,374 projects |
| HomeGuide — minor | $100–$150 per sq ft | Refreshes (fixtures, paint, surfaces) |
| HomeGuide — partial | $150–$300 per sq ft | Partial remodels |
| HomeGuide — full | $250–$500 per sq ft | Full remodels |
| Fixr — DIY | $70–$100 per sq ft | Do-it-yourself labour |
| Fixr — pro | $120–$275 per sq ft | Professional labour |
| toolfigure — model rates | $125 / $250 / $350 / $500 per sq ft | Budget / midrange / high-end / luxury |
Timelines. Inspection and fixture lead-time waits are excluded from these build times.
| Scope | Build time |
|---|---|
| Powder room | 1–2 weeks |
| Full bath | 2–4 weeks |
| Luxury primary + layout change | 6–9 weeks |
| Tub-to-shower conversion | 1–2 weeks (planning estimate) |
| Moving plumbing | +~2 weeks |
| Luxury tile / stone | +~1 week |
Whole-bath averages, for a sense check. Angi $12,157 (updated 27 Oct 2026, 28,374 verified projects; most pay $6,651–$17,662; luxury to $30,000+) · whatcostshome $12,150 (an older Angi update) · costto.build $12,343 average ($6,289 low / $23,285 high) · Fixr about $12,000. If your total is far outside $6,000–$26,000 for a midrange job, check the scope, the tier and the size first — one of them is usually wrong. Other unit prices (Angi): shower install averages $8,200 ($300–$15,000) · tub replacement $2,000–$9,400 · demolition $1,000–$2,300 · permits $100–$1,000 · flooring $12.50 per sq ft · tiling $10–$50 per sq ft · plumber $45–$200 per hour · toilet install averages $375.
Measurement tips
- Keep the layout if you can. Moving the toilet, the tub or the vanity means moving the drain and the vent stack — and a plumbing relocation is a $5,000 flat extra before the two extra weeks it adds. A layout that works with new fixtures is the cheapest saving on this page.
- Price the vanity and the tile first — they are the visible money. The vanity is 12% of the job ($1,740 on the canonical bathroom) and tile is 18% ($2,610), and both are the lines you shop. Get the vanity quote in writing before the rest of the job is priced — and ask when it enters the country, because the 2027 tariff follows the entry date.
- Use the cross-check on the materials, not on the budget. The component build prices the tub or shower, vanity, toilet, tile and fixtures — the five lines you can shop. If a contractor’s materials are far above the cross-check, ask what is different; if a quote matches the cross-check, ask what was left out (permits, plumbing moves, disposal, waterproofing repairs).
- Hold the full 10% contingency, and hold it outside the budget. Keep 10–20% outside the category targets, not inside them — a contingency folded into the total gets spent on a better faucet, and then the rot behind the tub has no money left.
- Do the DIY where it saves money, not where it creates risk. DIY-plus-trades saves 40% ($5,800 on the canonical job) when you do the demolition, the painting and the finishing — and hire licensed trades for the plumbing and electrical. Moving a drain or a vent stack yourself is not a saving: it is a leak, a failed inspection and a redo.
- Get three written quotes, and make them quote the same scope. The per-square-foot spread on this page ($70–$500) exists because rates and scopes differ; quotes differ for the same reason. Give every contractor the same scope, tier and materials list, or the quotes cannot be compared.
- Check the job against your home’s value before you sign. A $15,950 bathroom is 3.54% of a $450,000 home and 15.95% of a $100,000 one — the same job, two different answers. The 10–15% guardrail exists because the same bathroom has a different answer in a different house — and because the Cost vs Value resale figure is a national average, not your street.
- Do not cut the waterproofing. It is $580 on the canonical job — 4% — and it is invisible when the job is finished, which is why it is the first line people cut. A leak through a failed membrane is a rebuild of the floor, the subfloor and sometimes the ceiling below. The $580 is the cheapest insurance on this page.
- Order the fixtures before you demolish. Vanities, tubs and tile have lead times, and a bathroom torn out with no vanity coming is a bathroom you cannot use for a month. The demolition is the fast part; the waiting is the slow part.
- Keep the old bathroom’s good parts. A vanity in sound condition can be refaced or repainted, a cast-iron tub can be refinished, and a cosmetic refresh at the budget tier is a real remodel, not a compromise — it is how a $14,500 job becomes a $7,500 one.
Common mistakes
- Budgeting from the component cross-check. The $7,662.50 cross-check for a 60 sq ft bathroom excludes permits, plumbing moves, disposal and waterproofing repairs — about $8,300 of work on the fixture-driven total. A budget built on the cross-check runs out of money at the plumbing.
- Forgetting the contingency — or spending it on upgrades. The 10% is for what the demolition finds: rot, bad plumbing, out-of-level floors. If it is spent on a better faucet in week one, there is nothing left for the joist in week three.
- Treating the tariff as a tax on the whole job. The Section 232 duty is on the customs value of the imported vanity — not on the installed price, and not on the labour, the tile or the tub. A $435 step-up on a $15,950 job is the upper bound; the real figure is usually lower — and the step-up is scheduled, not certain.
- Comparing quotes that quote different scopes. One contractor’s $12,500 and another’s $15,950 can both be honest if one is pricing $250 per square foot and the other a fixture table, or one is keeping the layout and the other moving the toilet. The scope and the tier have to match before the prices can.
- Counting labour as a share of the total when the source means materials. themagiccodex’s 25% labour figure is 25% of the materials cost — on a $6,130 materials bill that is $1,532.50, not 25% of a $15,950 job. Mixing the two bases overstates the labour by half. The headline labour share (40–65% of the total) counts all trades; the split’s 16% line is general labour only.
- Reading Cost vs Value as a promise. The 80.0% on a midrange bathroom is a Realtor-survey estimate for a 5×7 ft bathroom nationally — and the National Association of Realtors’ own survey puts it closer to 50%. Your buyer, your street and your house’s price band move it; an $81,612 upscale bathroom that recoups 41.7% still leaves about $47,600 unrecovered.
- Assuming a small bathroom is cheap per square foot. It is the opposite: fixtures, trades and permits cost nearly the same in any size room, so a 25 sq ft bathroom runs $72–$252 per sq ft while a 100 sq ft one runs $70–$250. Price the small bathroom from the fixture table, not from a per-square-foot rate.
- Cutting the waterproofing to save $580. It is 4% of the job and the line people cut first because it is invisible. A failed membrane is not a $580 repair — it is a rebuild. Keep the line, and ask the contractor to name the membrane system in the quote.
- Forgetting permits and demolition in the budget. Permits run $100–$1,000 and demolition $1,000–$2,300, and most jobs that move plumbing, wiring or structure need a permit. They are a few hundred dollars on a $15,950 job — and the reason a $15,950 job becomes a $17,000 job after the first inspection.
- Moving the toilet without pricing the drain. The drain and vent stack are the expensive part of moving a toilet — the fixture is $200–$700, the relocation is the work. A layout change that moves the toilet is a plumbing relocation ($5,000 flat extra on this page) plus about two weeks, and it is the line most often missing from the first quote.
Factors that affect accuracy
- Bathroom scope — the fixture count sets the base. A powder room has no tub or shower; a full bath has one; a primary bath is larger with more vanity. The base table prices that directly: powder $3,500–$14,000, full $7,500–$26,000, primary $16,000–$55,000. Scope is the first decision because it sets the row of the table.
- Finish tier — the biggest lever. The tier moves a primary bath from $16,000 (budget) to $55,000 (luxury) before size or region. The vanity tier inside it ($450 vs $900 vs $1,800) and the tile material (ceramic $10 vs porcelain $18 vs stone $32.50 per sq ft) are the decisions inside the tier — and they are made once, at the order.
- Room size — fixtures do not shrink. The size factor is 0.90× for a small bathroom and 1.15× for a large one, because a small bathroom still needs a vanity, a toilet and a plumber. That is why the dollars-per-square-foot line runs higher on small bathrooms, and why the tool is fixture-driven rather than per-square-foot.
- Region — labour and materials both vary. The planning factors run 0.92× to 1.12×, and the Cost vs Value 2025 regional table runs 0.88× (West South Central) to 1.15× (Middle Atlantic). A Pacific bathroom costs about 6% more than the national average and a West South Central one about 12% less — the region selector is a planning factor, not a price list for your city.
- Labour approach — the 40% decision. Professional is 1.00×; DIY-plus-trades is 0.60× — a $5,800 saving on the canonical job. The saving is real when you do the demolition and finishing and hire the trades for the wet work; it disappears when the DIY work fails inspection and has to be redone.
- Tile — the biggest single line. Tile is 18% of the job ($2,610 on the canonical bathroom), and the material choice moves it: ceramic at $10, porcelain at $18 and stone at $32.50 per sq ft. On 50 sq ft of tile that is $500, $900 or $1,625 — and large-format or stone tile adds about a week to the timeline.
- Vanity — 12% of the job and the tariff’s target. The vanity is $1,740 on the canonical bathroom, the second-smallest big line, and the only line the Section 232 duty touches. The vanity tier ($450 basic, $900 mid, $1,800 premium) and the entry date (before or after 1 January 2027) are the two decisions that move it.
- Plumbing — 14% and the layout’s price. Plumbing is $2,030 on the canonical bathroom, and moving it is the expensive part of changing the layout: a plumbing relocation is a $5,000 flat extra plus about two weeks. If the layout works, keeping the toilet and the tub where they are is the cheapest saving on the page.
- Age and condition — what demolition finds. Old bathrooms hide rot behind the tub, plumbing that does not meet code and floors that are not level. That is what the 10–20% contingency is for, and why a 1960s bathroom costs more than a 2010s one at the same tier.
- Home value — the budget’s ceiling. The published guardrail is 10–15% of the home’s value. A remodel that costs more than a sixth of the house rarely returns it at resale — the Cost vs Value table shows why: the dearer the bathroom, the smaller the share that comes back.
Sources & assumptions
- Method — fixture-driven: base = scope × tier base cost × size factor × labour factor; subtotal = (base + flat extras + other upgrades) × region factor + tariff uplift; total adds the contingency. Size factors are small 0.90× / standard 1.00× / large 1.15×; region factors are low-cost 0.92× / average 1.00× / high-cost 1.12×; labour is pro 1.00× / DIY-plus-trades 0.60× (a 40.0% saving on the job itself). Large 1.15× and West 1.12× are nrtechstudio's published factors; small 0.90× and low-region 0.92× are the factors that reproduce nrtechstudio's published $1,739 worked example — the page's calculator applies them but its article prints no factor table, and no source publishes a complete bathroom size/region table. The component cross-check is themagiccodex's price list (see below). Confirmed 2026-11-22 against nrtechstudio's bathroom remodel cost calculator (base table, split, worked examples, DIY, timelines) and toolfigure's bathroom remodel cost calculator (rates, flat extras, region, $12,500 example).
- Base table, component split and worked examples — nrtechstudio (live read 2026-11-22): scope × tier base costs (powder $3,500/$7,500/$14,000 · full $7,500/$14,500/$26,000 · primary $16,000/$30,000/$55,000 · tub-to-shower $3,000/$5,500/$9,000); 10-component split summing to exactly 100% (tile 18%, general labour 16%, plumbing 14%, tub/shower 13%, vanity 12%, electrical 7%, demolition 6%, waterproofing 4%, permits/design 5%, paint 5%); worked examples $15,950 (full midrange + 10% contingency), $88,936 (primary luxury West + upgrades, 15% contingency) and $1,739 (small powder budget DIY Midwest) with the derivations shown on the page; DIY 40% ($5,800 on $14,500); timelines powder 1–2 wks / full 2–4 wks / luxury primary + layout 6–9 wks / plumbing move +~2 wks / luxury tile/stone +~1 wk; home-value guardrail 10–15%. Corrections vs that page: its ROI table is Cost vs Value 2024 (stale — this page uses 2025); its Angi $12,100 figure is a July 2026 update (live Angi is $12,157); its 'Angi $4,000–$4,500' tub-to-shower paraphrase is wrong (live Angi $1,200–$3,600). The $88,936 example's $5,800 upgrade total (heated floors + accessibility) is back-solved from the page's published subtotal; the split is not published, and this page does not invent one.
- Component cross-check — themagiccodex's bathroom remodel calculator (live read 2026-11-22): tub $2,400 · walk-in shower $3,200 · tub-shower combo $2,800 · vanity $450 / $900 / $1,800 · toilet $200 / $350 / $700 · tile ceramic $8–$12 / porcelain $12–$20 / stone $25–$40 per sq ft · fixtures $600 · labour 25% OF MATERIALS COST (20% simple swap, 30%+ layout moves). Its 60 sq ft example reproduced exactly: walk-in shower $3,200 + mid vanity $900 + mid toilet $350 + porcelain tile 60 × $18 = $1,080 + fixtures $600 = materials $6,130 + labour 25% $1,532.50 = $7,662.50 ($127.71/sq ft). Exclusions stated on the page: permits, plumbing moves, disposal and waterproofing repairs — so the cross-check is a partial build by design. Bonus examples on the same page: 40 sq ft basic $5,076; 100 sq ft premium $12,870.
- Per-square-foot model and flat extras — toolfigure's bathroom remodel cost calculator (live read 2026-11-22): rates $125 budget / $250 midrange / $350 high-end / $500 luxury per sq ft; flat extras walk-in shower $3,000 · freestanding tub $2,500 · heated floors $1,500 · custom vanity $2,000 · plumbing relocation $5,000; region 0.90 low / 1.00 average / 1.10 high; planning range ±15%. Worked example: 50 sq ft midrange = $12,500 (range $10,625–$14,375); ToolsPed's published band for the same job is $10,000–$15,000, midpoint $12,500 — an exact match.
- Averages and cost by size — Angi's bathroom remodel cost guide (live read 2026-11-22, updated 27 Oct 2026): national average $12,157, based on 28,374 verified projects; most pay $6,651–$17,662; luxury can climb to $30,000+; scope table full $25,000–$80,000 · partial $10,000–$25,000 · minor $3,000–$10,000; per-sq-ft $70–$250; labour 40–65% of the total; size table 25 sq ft $1,800–$6,300 · 40 $2,800–$10,000 · 50 $3,500–$12,500 · 75 $5,300–$18,800 · 100 $7,000–$25,000; shower install averages $8,200 ($300–$15,000) · tub replacement $2,000–$9,400 · demolition $1,000–$2,300 · permits $100–$1,000 · flooring $12.50/sq ft · tiling $10–$50/sq ft · plumber $45–$200/hr · toilet install averages $375.
- Cost by scope and per-square-foot tiers — HomeGuide's bathroom remodel cost page (live read 2026-11-22, via whatcostshome updated 17 Nov 2026): 35–50 sq ft minor $3,500–$7,500 · partial $5,300–$15,000 · full $8,800–$25,000+; size table 5×7 ft minor $3,500–$5,300 / partial $5,300–$10,500 / full $8,800–$17,500 and 5×10 ft $5,000–$7,500 / $7,500–$15,000 / $12,500–$25,000; per-sq-ft minor $100–$150 · partial $150–$300 · full $250–$500 — the single '$150–$300' figure is the partial tier only. whatcostshome cites Angi's average as $12,150, an older Angi update; the live Angi figure is $12,157.
- Cost vs Value 2025 — Journal of Light Construction's 2025 Cost vs Value report (live read 2026-11-22): national averages, 5×7 ft bathroom (upscale ~100 sq ft): midrange $26,138 cost / $20,915 resale / 80.0% recouped; upscale $81,612 / $34,000 / 41.7%; universal design $42,183 / $25,812 / 61.2%. The 2025 edition is the latest as of 22 Nov 2026 (no 2026 edition found); published 18 Sep 2025; 119 markets. Pacific midrange 91% ($27,710 cost, $25,217 resale); Milwaukee $29,031 / $20,797 / 71.6%; East North Central $24,910 / 70.9%; regional factors Middle Atlantic 1.15 · Pacific 1.06 · New England 1.05 · West North Central 1.03 · National 1.00 · South Atlantic 0.98 · Mountain 0.95 · East North Central 0.95 · East South Central 0.90 · West South Central 0.88. NAR's 2025 Remodeling Impact Report puts bathroom renovation at about 50% cost recovered (joy 9.8/10) — a different, survey-based method, shown as the second number. The resale values are Realtor-survey estimates.
- Tier line-items — hausbound's bathroom remodel cost guide (live read 2026-11-22): standard 5×8 full bath, materials + labour combined — labour $2,500–4,000 / $6,000–12,000 / $15,000–25,000 · tile & flooring $800–1,500 / $2,000–4,500 / $5,000–10,000 · vanity & countertop $400–1,200 / $1,500–3,500 / $4,000–8,000 · shower/tub & glass $600–1,500 / $2,500–6,000 / $7,000–15,000 · plumbing fixtures $300–800 / $1,000–2,500 / $3,000–6,000 · toilet $150–350 / $350–700 / $700–2,000 · paint/drywall/trim $150–400 / $400–900 / $900–2,000 · lighting & electrical $200–500 / $600–1,500 / $1,500–3,500 · everything else $400–800 / $900–2,000 / $2,000–4,000 (budget refresh / mid-range gut / high-end). Framing: full remodel $12,000–$35,000; budget refresh $6,000–$15,000; mid-range gut $15,000–$35,000; high-end $40,000+.
- Itemised low / average / high — costto.build's bathroom remodel cost page (live read 2026-11-22): low $6,289 / average $12,343 / high $23,285; materials 27% (avg $3,335) · labour/trades/removal 53% (avg $6,482) · design/permits/project 20% (avg $2,526) — the page's own subtotals (its percentages are rounded labels). Its ROI table cites Cost vs Value 2024 — not used. Its model excludes fixture relocation, waterproofing and heated floors.
- Section 232 vanity tariff — Proclamation 11000 (91 FR 1039, published 9 Jan 2026), quoted via the Federal Register public-inspection text and Bolton Built and ZentriaFlow: 25% since 14 Oct 2025 (Proclamation 10976), rising to 50% on 1 Jan 2027 except for countries reaching a US agreement; the rise was delayed a full year from 1 Jan 2026. HTSUS 9403.60.8093 (vanities; kitchen cabinets 9403.40.9060; parts 9403.91.0080; duty under heading 9903.76.03). EU, Japan, South Korea and Taiwan capped at 15% combined; UK 10%; China 50%→75% (Section 232 + Section 301, BEFORE anti-dumping/countervailing duties). The duty is on the customs value of the imported goods, not the installed price, and the rate follows the date of entry for consumption, not the order date. The tool's tariff toggle adds the 25-point step-up on the vanity line (12% of the base) as an UPPER BOUND (it assumes the whole vanity line is dutiable customs value); the page says so. Vanities are ~12% of the budget, so a full pass-through moves the total job by roughly 3%.
- Timelines and contingency — nrtechstudio: powder 1–2 weeks, full bath 2–4 weeks, luxury primary + layout 6–9 weeks, moving plumbing +~2 weeks, luxury tile/stone +~1 week; contingency 10% recommended, 10–20% range. Tub-to-shower 1–2 weeks is this page's planning estimate. Home-value guardrail 10–15% (nrtechstudio FAQ). Whole-bath averages: Angi $12,157 ($6,651–$17,662); whatcostshome $12,150 (an older Angi update); costto.build $12,343 average ($6,289 low / $23,285 high); Fixr about $12,000.
Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.
How this calculator was checked
Figures checked 22 November 2026. Each case below was recomputed from the calculator's own formula and matched the tool's output.
| Test inputs | Expected result |
|---|---|
| Full bath, midrange, standard size, average region, pro, 10% contingency | $14,500 base, $15,950 total ($319/sq ft) |
| Same job, 2027 vanity tariff on | $435 tariff uplift, $16,429 total |
| Primary, luxury, large, high-cost region, $5,800 upgrades, 15% contingency | $77,336 subtotal, $88,936 total |
| Powder room, budget, small, low-cost region, DIY-plus-trades, 0% contingency | $1,739 total |
| 60 sq ft, walk-in shower, mid vanity, mid toilet, porcelain (themagiccodex cross-check) | $7,662.50 component total ($127.71/sq ft) |
| 50 sq ft, midrange (toolfigure per-sq-ft check) | $12,500 (range $10,625–$14,375) |
| 5 m², full bath, midrange | $15,950 total ($3,190/m²) |
| $15,950 job, $450,000 home value | 3.54% of home value — inside the 10–15% rule |
What this check does not cover
- The size and region factors are this page’s planning model (large 1.15× and West 1.12× published; small 0.90× and low-region 0.92× back-solved from nrtechstudio’s published $1,739 example) — no source publishes a complete factor table.
- The $88,936 example’s $5,800 upgrade total (heated floors + accessibility) is back-solved from nrtechstudio’s published subtotal; the page does not itemise the split, and this page does not invent one.
- The cross-check cases use themagiccodex’s stated prices (porcelain tile $18 per sq ft as stated; ceramic $10 and stone $32.50 are midpoints of the published bands) — measure your own tile area for the real figure.
- The tariff case is an upper bound: it assumes the whole $1,740 vanity line is dutiable customs value. The real duty is on the imported share’s customs value only, and the step-up is scheduled, not certain.
- The CvV comparison is tier-based (budget/midrange → midrange 80.0%, luxury → upscale 41.7%) for a 5×7 ft bathroom; your bathroom’s size moves the comparison.
What this calculator doesn't do
- This is a planning estimate, not a contractor quote. It prices from a published scope-by-tier base table, scaled by size, labour approach and region — the method the field’s calculator pages use — not from your bathroom’s actual fixtures, tile, plumbing and labour market. Three written quotes from local contractors govern the real price: get them before you sign anything.
- The size and region factors are this page’s planning model, not a published table. Large 1.15× and West 1.12× are nrtechstudio’s published factors; small 0.90× and low-region 0.92× are the factors that reproduce nrtechstudio’s published $1,739 worked example — its calculator applies them, but its article prints no factor table, and no source publishes a complete bathroom size/region table. The Cost vs Value 2025 regional table below is the published regional data; a local quote beats any factor.
- The 2027 tariff toggle is an upper bound, not a quote. It adds the 25-point step-up (25% to 50%) on the whole vanity line, as if the entire vanity price were dutiable customs value. The real duty applies only to the customs value of the imported share — and the step-up is scheduled, not certain: it was already delayed once, and it excepts countries that reach an agreement with the US. Ask your supplier what share of the vanity price is customs value, and when the vanity enters the country.
- The component cross-check is a partial build by design: it prices the tub or shower, vanity, toilet, tile and fixtures plus labour at 25% of materials, and it does NOT include permits, plumbing moves, disposal or waterproofing repairs. It will always read lower than the fixture-driven total — that gap is the exclusions, not a saving.
- The Cost vs Value figures are national averages for a 5×7 ft bathroom, and the resale value is a Realtor-survey estimate, not a price a buyer will pay for your bathroom. A remodel in a $200,000 house does not recoup like the same remodel in a $600,000 house — the home-value verdict below is the check that matters.
- This page prices the remodel; it does not design it. It does not check whether your floor can carry a stone tub, whether the drain and vent stack can move, or whether the work needs a permit — your city’s building department decides the last one, and most jobs that move plumbing, wiring or structure need one. Water damage found at demolition is outside every figure on this page.
Bathroom Remodel Cost Calculator — How Much Does a Bathroom Remodel Cost? — frequently asked questions
How much does a bathroom remodel cost?
The national average is $12,157 (Angi, updated 27 Oct 2026, based on 28,374 verified projects) — most pay $6,651–$17,662. But that average mixes powder rooms and primary baths, so a full bathroom at midrange costs more: $14,500 before contingency, $15,950 with the 10% contingency ($319 per sq ft on a 50 sq ft bath). costto.build’s model average is $12,343. Enter your scope, tier and size above for your exact total.
What is the most expensive part of a bathroom remodel?
Labour — 40–65% of the total (Angi), counting all trades. costto.build puts labour, trades and removal at 53% of its $12,343 average. As a single component line, tile is the biggest at 18% ($2,610 on a $14,500 job), then general labour at 16% ($2,320) and plumbing at 14% ($2,030). The 16% labour line excludes the trades embedded in the tile, tub and vanity lines — it is a line-item view, not the whole labour bill.
How much can I save with a DIY bathroom remodel?
About 40% — $5,800 on the canonical $14,500 job. DIY-plus-trades (you do the demolition and finishing, licensed trades do the plumbing and electrical) prices the same full midrange bathroom at $8,700 before contingency, $9,570 with 10%. Fixr’s per-square-foot figures agree: DIY $70–$100 against pro $120–$275. DIY does not mean doing the plumbing yourself — moving a drain or a vent stack is licensed-trade work.
Does a bathroom remodel increase home value?
The 2025 Cost vs Value report (Journal of Light Construction, the latest edition) says a midrange bathroom recoups 80.0% ($20,915 back on $26,138) — the highest since 2007 — an upscale bathroom 41.7% ($34,000 on $81,612) and a universal-design one 61.2% ($25,812 on $42,183). The National Association of Realtors’ 2025 survey puts bathroom renovation closer to 50% cost recovered, with a joy score of 9.8 out of 10 — a different method, and the reason this page shows both numbers. The resale values are Realtor-survey estimates, not prices a buyer will pay.
How much does a small bathroom remodel cost?
More per square foot than a large one — read the upper half of any per-square-foot band. Angi’s size table puts a 25 sq ft bathroom at $1,800–$6,300 and a 50 sq ft one at $3,500–$12,500; HomeGuide’s full-remodel band is $250–$500 per sq ft. A small powder room at the budget tier, DIY-plus-trades, is $1,739 in the worked example below. Fixtures, trades and permits cost nearly the same in any size room, so the fixed costs spread over fewer square feet.
How long does a bathroom remodel take?
1–2 weeks for a powder room, 2–4 weeks for a full bath, and 6–9 weeks for a luxury primary bath with a layout change. Moving plumbing adds about 2 weeks and luxury tile or stone about 1 week; a tub-to-shower conversion is about 1–2 weeks. Inspection and fixture lead-time waits are excluded — order the vanity and tile before you demolish.
Do I need a permit for a bathroom remodel?
Usually, if the job moves plumbing, wiring or structure — and permits run $100–$1,000 (Angi). A like-for-like fixture swap often does not need one, but moving a toilet, a drain or a vent stack does, and so does most structural work. Your city’s building department decides; the tool’s permits/design line is 5% of the base ($725 on the canonical job).
How much does a tub-to-shower conversion cost?
$3,000–$9,000 by tier (nrtechstudio’s scope table) — $5,500 at midrange. Angi’s own conversion row is lower, $1,200–$3,600, for a straightforward conversion without moving the drain. The gap is scope: the $5,500 figure is a full conversion with new tile, glass and fixtures, while Angi’s is the conversion alone. If the drain moves, add the $5,000 plumbing-relocation extra and about two weeks.
What is the waterproofing line item?
4% of the job — $580 on the canonical $14,500 bathroom. It is the membrane system under the tile that keeps water out of the floor and the walls, and it is the line people cut first because it is invisible when the job is finished. A leak through a failed membrane is not a $580 repair — it is a rebuild of the floor, the subfloor and sometimes the ceiling below. The cross-check on this page excludes waterproofing repairs entirely, so a quote that matches it has no waterproofing in it at all.
Will the 2027 vanity tariff raise my bathroom cost?
Yes, if your vanity is imported and enters the US on or after 1 January 2027 — the Section 232 duty doubles from 25% to 50%. On a $14,500 job the vanity line is $1,740, so the 25-point step-up adds up to $435 (upper bound — the real duty is on the customs value of the imported share, not the installed price). The duty is on customs value, and the rate follows the entry date, not the order date — a vanity that clears customs before 1 January 2027 still pays 25%. The step-up is scheduled, not certain: it was already delayed once, and the EU, Japan, South Korea and Taiwan are capped at 15% while the UK is at 10%. Use the tariff toggle above to price your job both ways.
Is a luxury bathroom remodel worth it?
For enjoyment, yes — for resale, less so: a luxury (upscale) bathroom recoups 41.7% ($34,000 back on $81,612, 2025 Cost vs Value). A midrange bathroom recoups 80.0% and a universal-design one 61.2%. The dearer the bathroom, the smaller the share that comes back — and the National Association of Realtors’ survey puts bathroom renovation at about 50% overall, with a joy score of 9.8 out of 10. Buy the luxury bathroom because you will use it every day, not because it pays for itself.
What is NOT included in this estimate?
Relocating the drain or vent stack beyond the $5,000 plumbing-relocation extra, water damage found at demolition, and structural layout changes beyond the model. The fixture-driven total also does not price a second vanity, a steam shower or accessibility features — put those in the “other upgrades” box. And the component cross-check additionally excludes permits, plumbing moves, disposal and waterproofing repairs. If the demolition finds rot or a leaking stack, that work is extra on any figure on this page.
How much does a bathroom remodel cost in square metres? (metric)
A 5 m² bathroom, full bath, midrange costs $15,950 with the 10% contingency — $3,190 per m². 5 m² is 53.82 sq ft, and the fixture-driven total does not depend on the area — the area feeds the dollars-per-square-metre check line. A 4.65 m² bathroom is 50 sq ft, the worked example: $15,950 with 10% contingency ($319 per sq ft). Per-square-metre bands: Angi $753–$2,691 per m²; HomeGuide full remodel $2,691–$5,382 per m². Enter the area in square metres above and the tool converts.
What does a 5 m² bathroom remodel cost at the budget tier? (metric)
A 5 m² bathroom at the budget tier, full bath, costs $7,500 before contingency — $8,250 with 10% ($1,650 per m²). 5 m² is 53.82 sq ft. The same bathroom as a powder room at the budget tier is $3,500 before contingency, $3,850 with 10%, and as a primary bath at the luxury tier it is $55,000 before contingency, $60,500 with 10%. At the midrange tier the same 5 m² full bath is $14,500 before contingency ($15,950 with 10%). Enter the area in square metres above for your exact total.
Next step
Take the base, the component split and the ±15% planning range to three contractors — and make them quote the same scope, tier and materials, or the quotes cannot be compared. Then price the tile with the tile calculator, the fan with the bathroom fan calculator, the floor with the flooring calculator and the walls with the paint calculator — and ask your vanity supplier, in writing, when the vanity clears customs, since the 2027 tariff follows the entry date.
Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.