Kitchen Remodel Cost Calculator — How Much Does a Kitchen Remodel Cost?

A kitchen remodel is the most expensive room in the house to redo — and the hardest to price, because every calculator disagrees. The same 200 sq ft kitchen is $40,000 on one page, $50,000 on the next and $55,000 on the third, and all three pages are doing honest arithmetic from different rates. This kitchen remodel cost calculator shows you why: it prices your kitchen top-down from floor area, finish tier, scope and region, prints the three-model spread next to its own total, splits the total into HomeGuide’s published categories so you can see where the money goes, and cross-checks the whole thing bottom-up from component prices — cabinets by the linear foot, counters by the square foot, appliances and flooring — with the exclusions named, so the gap between the two methods is explained rather than hidden. It also answers the two questions that decide whether the job is worth doing at all: what the 2025 Cost vs Value report says a kitchen returns at resale, and whether the total is a sensible share of your home’s value. And because the calendar matters now: if your cabinets are imported and enter the US in 2027, the Section 232 duty doubles from 25% to 50% on 1 January 2027 — the tariff toggle re-prices the cabinet line for that. For the pieces of the job, price the counters with the countertop calculator and the countertop cost guide, the cabinet paint with the cabinet paint calculator and the kitchen cabinet painting cost guide, the walls with the paint calculator and the paint a room cost guide, the floor with the flooring calculator and the flooring installation cost guide, the tile with the tile calculator and the bathroom tile cost guide, the power with the electricity cost calculator, and the whole-house paint with the house painting cost guide.

Quick answer: A 200 sq ft kitchen, midrange finish, pull-and-replace scope, in an average-cost area costs $50,000 before contingency — $55,000 with the 10% contingency ($275 per sq ft). The same job is $40,000 at HomeGuide’s band midpoint ($200 per sq ft), $50,000 at nrtechstudio’s $250 rate and $55,000 at toolfigure’s $275 rate — the spread is the field’s, and this page prints all three. Cabinets are the biggest line at $12,500 (25%). Enter your kitchen below for your exact total.
Key takeaways
  • A 200 sq ft midrange pull-and-replace kitchen costs $50,000 before contingency — $55,000 with the 10% contingency ($275 per sq ft).
  • The same 200 sq ft job is $40,000 at HomeGuide’s band midpoint, $50,000 at nrtechstudio’s $250 rate and $55,000 at toolfigure’s $275 rate — three models, one kitchen.
  • Cabinets are a quarter of the job ($12,500 of $50,000) — and the line the 2027 tariff touches: a 25-point duty step-up adds up to $3,125 to it.
  • The component cross-check prices the same 120 sq ft kitchen at $16,188 — but it excludes plumbing, electrical, permits and demolition, so it always reads lower than the $33,000 top-down total.
  • A 200 sq ft kitchen that costs $55,000 is 13.75% of a $400,000 home — inside the 5–15% general rule; on a $200,000 home it is 27.5%, above both published rules.
The kitchen’s floor area. A 10×12 ft kitchen is 120 sq ft; a 10×20 ft one is 200 sq ft — the worked example below. Measure wall to wall, and leave the dining area out unless it is part of the job.
nrtechstudio’s published tier rates, used as this page’s planning basis. toolfigure’s rates are $160/$275/$450/$700 — the result shows what the same job costs at those rates too.
nrtechstudio’s scope multipliers. A cosmetic refresh keeps the cabinets’ boxes and the layout; pull-and-replace swaps everything in place; a custom job moves walls and plumbing — and costs half as much again.
A planning simplification: nrtechstudio publishes the range 0.92×–1.25× with 1.00× as the national average. A California kitchen can reach $800+ per sq ft — a local quote beats any region factor.
Only used by the component cross-check below (themagiccodex’s price list). The top-down total does not depend on it — flooring is 7% of the HomeGuide split either way.
Enter 0 if no wall moves. HomeGuide: $500–$2,000 per wall for a non-load-bearing wall. Enter your contractor’s figure if you have one.
Enter 0 if no wall moves. HomeGuide: $4,000–$15,000 per wall, plus a structural engineer at $1,900–$3,700+. Only an engineer can say whether a wall is load-bearing.
toolfigure’s flat add-ons, labelled as model values — HomeGuide publishes ranges instead (island $3,000–$5,000; appliance package $2,500–$6,800). Pick the one you are actually adding.
Section 232 duty on imported kitchen cabinets doubles from 25% to 50% on 1 January 2027. The toggle adds the 25-point step-up on the cabinet line as an upper bound — the real duty is on the imported share’s customs value only.
10% is the recommended default (10–20% range, nrtechstudio; This Old House says 10–15%; HomeGuide says at least 5%). Old kitchens hide rot, bad wiring and out-of-level floors — the contingency is for what the demolition finds.
Your home’s current value, for the budget check: is this remodel a sensible share of the house? Leave it blank to skip the check.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Kitchen Remodel Cost Calculator — How Much Does a Kitchen Remodel Cost?

  1. Measure the kitchen floor. Wall to wall, in square feet or square metres — a 10×12 ft kitchen is 120 sq ft, a 10×20 ft one is 200 sq ft. Leave the dining area out unless it is part of the job. A 20 sq ft error is a $5,000 error at the midrange rate, so measure twice.
  2. Pick the finish tier. Budget ($125 per sq ft) is stock cabinets and laminate counters; midrange ($250) is semi-custom cabinets and quartz; high-end ($400) is custom cabinets and granite; luxury ($650) is fully custom with top appliances. The tier is the single biggest lever on the total — it moves a 200 sq ft kitchen from $25,000 to $130,000 before scope.
  3. Pick the scope. Cosmetic (× 0.45) keeps the layout and the cabinet boxes — paint, hardware, counters, floors. Pull-and-replace (× 1.00) swaps everything in place. Custom (× 1.50) moves walls, plumbing and gas — and costs half as much again. If the layout works, the scope is the cheapest saving on this page.
  4. Pick the cost region. Low (× 0.92), average (× 1.00) or high (× 1.25) — a planning simplification from nrtechstudio’s published 0.92×–1.25× range. It cannot see your city: a California kitchen can reach $800+ per sq ft, a Florida one far less.
  5. Set the flooring for the cross-check. Vinyl $6, laminate $9, hardwood $12 or tile $14 per sq ft (themagiccodex’s price list). This only feeds the component cross-check below — the top-down total counts flooring at 7% of the split either way.
  6. Add wall removals, if any. Non-load-bearing walls run $500–$2,000 each; load-bearing walls $4,000–$15,000 plus a structural engineer at $1,900–$3,700+. Enter your contractor’s figure if you have one, or 0 if no wall moves. Do not guess which walls are load-bearing — only an engineer can say.
  7. Add one flat extra, if any. An island ($3,500), custom cabinets ($8,000), quartz counters ($4,000), an appliance package ($2,500) or a lighting upgrade ($2,000) — toolfigure’s flat add-ons. If you are adding two, add the second to the wall-removal boxes’ total by hand, or run the tool twice.
  8. Answer the tariff question. If your cabinets are imported and enter the US on or after 1 January 2027, the Section 232 duty is 50% instead of 25% — the toggle adds the 25-point step-up on the cabinet line. It is an upper bound: the real duty is on the imported share’s customs value, not on the installed price.
  9. Set the contingency. 10% is the default; 10–20% is the recommended range. Old kitchens hide rot, bad wiring, out-of-level floors and plumbing that does not meet code — the contingency pays for what the demolition finds, and a job with no contingency is a job that stops halfway.
  10. Enter your home value, if you want the budget check. The tool compares the total with your home’s value against the two published rules — 5–15% is the general rule, 15–20% is the National Kitchen & Bath Association’s figure for a full overhaul. Leave it blank to skip the check.
  11. Read the base, the split and the total. The base is area × tier × scope × region. The split shows where it goes — cabinets 25%, labour 15%, appliances 15% and the rest. The total adds walls, extras and the tariff step-up, then the contingency. The ±15% planning range is the honest band around it.
  12. Read the cross-check and the ROI. The component cross-check rebuilds the job from cabinets, counters, appliances and flooring — it will read lower, because it excludes plumbing, electrical, permits and demolition, and the page names that gap. The Cost vs Value line shows what the 2025 report says a kitchen like yours returns at resale, and the home-value verdict says whether the total is a sensible share of your house.

Kitchen Remodel Cost Calculator — How Much Does a Kitchen Remodel Cost? formula

Base cost = kitchen area (sq ft) × tier rate × scope multiplier × region multiplier

Tier rates (nrtechstudio, the planning basis): budget $125 · midrange $250 · high-end $400 · luxury $650 per sq ft — toolfigure’s rates: $160 / $275 / $450 / $700 — HomeGuide’s bands: basic $60–150 · full $150–250 · high-end $250–350 per sq ft

Scope multipliers (nrtechstudio): cosmetic 0.45× · pull-and-replace 1.00× · custom / new layout 1.50× — region multipliers (planning simplification): low-cost 0.92× · average 1.00× · high-cost 1.25× (nrtechstudio publishes the 0.92×–1.25× range; the triplet is this page’s model choice, not a published standard)

Cabinet line = base × 25% (HomeGuide’s split) — tariff uplift (2027 entry) = cabinet line × 25%, the step-up from 25% to 50% duty, as an upper bound: it assumes the whole cabinet line is dutiable customs value

Subtotal = base + wall removals + flat extras + tariff uplift — contingency = subtotal × contingency % (default 10%) — total = subtotal + contingency — cost per sq ft = total ÷ area — planning range = total × 0.85 to total × 1.15

Category split (HomeGuide, % of base): cabinets & shelving 25% · installation & labour 15% · appliances 15% · countertops & backsplash 10% · flooring 7% · lighting 5% · painting & drywall 5% · doors & windows 4% · designer 5% · sink & faucet 5% · plumbing 3% · miscellaneous 1% (= 100%)

Component cross-check (themagiccodex): cabinet linear ft = area ÷ 6 · countertop sq ft = area ÷ 4 · cabinet $/linear ft by tier: budget $150 (stock) · midrange $250 (semi-custom) · high-end $450 (custom) · luxury $450 · countertop $/sq ft by tier: budget $35 (laminate) · midrange $85 (quartz) · high-end $95 (granite) · luxury $95 · appliances by tier: $2,500 / $4,500 / $9,000 / $9,000 · flooring $/sq ft: vinyl $6 · laminate $9 · hardwood $12 · tile $14 · materials = cabinets + counters + appliances + flooring · labour = materials × 20% (20% OF MATERIALS COST — not of the total) · cross-check total = materials + labour · EXCLUDES plumbing, electrical work, permits, demolition and disposal, painting, and the sink and tap

Cost vs Value check (2025 edition, JLC): the tool matches your scope to the nearest CvV project — cosmetic → minor midrange ($28,458 cost / $32,141 resale / 112.9% recouped) · pull-and-replace → major midrange ($82,793 / $42,130 / 50.9%) · custom → major upscale ($164,104 / $58,561 / 35.7%) — and shows the recouped value on your total at that rate

Home-value verdict: total ÷ home value — ≤ 15% is inside the 5–15% general rule (Consumer Reports) · 15–20% is inside the NKBA’s 15–20% for a full overhaul · above 20% is above both published rules

1 sq ft = 0.092903 m² · 1 m² = 10.7639 sq ft · 1 linear ft of cabinets ≈ 0.3048 m · $1 per sq ft = $10.764 per m².

Worked example

Worked example — 200 sq ft kitchen, midrange, pull-and-replace, average region, 10% contingency. This is the tool’s default, worked by hand so you can check it. It reproduces nrtechstudio’s published worked example exactly.

  1. Base: 200 × $250 (midrange) × 1.00 (pull-and-replace) × 1.00 (average region) = $50,000 ($250 per sq ft).
  2. Cabinet line: $50,000 × 25% = $12,500 — the biggest single line, and the one the tariff touches.
  3. Contingency: $50,000 × 10% = $5,000.
  4. Total: $50,000 + $5,000 = $55,000 ($275 per sq ft). Planning range: $55,000 × 0.85 to × 1.15 = $46,750–$63,250.
  5. Why three models give three answers: the same 200 sq ft job is $40,000 at HomeGuide’s band midpoint ($200 × 200), $50,000 at nrtechstudio’s $250 rate and $55,000 at toolfigure’s $275 rate (before contingency). The spread is the field’s, not a mistake — it is why the result shows all three.
  6. Where the $50,000 goes (HomeGuide’s split): cabinets $12,500 · labour $7,500 · appliances $7,500 · counters & backsplash $5,000 · flooring $3,500 · lighting $2,500 · painting & drywall $2,500 · doors & windows $2,000 · designer $2,500 · sink & faucet $2,500 · plumbing $1,500 · miscellaneous $500.
  7. Component cross-check for the same kitchen: cabinets 200 ÷ 6 = 33.33 linear ft × $250 = $8,333 · quartz 200 ÷ 4 = 50 sq ft × $85 = $4,250 · appliances $4,500 · hardwood 200 × $12 = $2,400 · materials $19,483 · labour 20% of materials = $3,897 · cross-check total $23,380. It reads far below $55,000 because it excludes plumbing, electrical, permits, demolition, painting and the sink — the gap is the exclusions, not a saving.
  8. Resale check: pull-and-replace maps to the CvV 2025 major-midrange project, which recouped 50.9% ($42,130 on $82,793). At that rate a $55,000 job returns about $27,995 — the resale value is a Realtor-survey estimate, not a promise.
  9. Home-value check: $55,000 ÷ $400,000 = 13.75% — inside the 5–15% general rule. On a $200,000 home the same job is 27.5%, above both published rules.
  10. Tariff version: with imported cabinets entering in 2027, the cabinet line steps up by $12,500 × 25% = $3,125 (upper bound) → $53,125 before contingency, $58,438 with 10%.

Same method, 120 sq ft — 10×12 ft kitchen, midrange, pull-and-replace. Base 120 × $250 = $30,000; total with 10% contingency $33,000. HomeGuide’s size table puts the same kitchen at $18,000–$30,000 (average/full column, $150–$250 per sq ft) — the tool’s base sits at the top of the band, and calcthejob’s midpoint for the job is $28,800. The component cross-check for this kitchen is themagiccodex’s published example, reproduced exactly: cabinets 20 linear ft × $250 = $5,000 · quartz 30 sq ft × $85 = $2,550 · appliances $4,500 · hardwood 120 × $12 = $1,440 · materials $13,490 · labour 20% = $2,698 · $16,188 ($134.90 per sq ft) — with plumbing, electrical, permits, demolition and disposal, painting, and the sink and tap all excluded, which is why it is half the top-down total.

Small kitchen — 100 sq ft, budget, cosmetic refresh. Base 100 × $125 × 0.45 = $5,625; total with 10% contingency $6,188. HomeGuide’s small-kitchen range is $4,000–$18,000 for kitchens of 120 sq ft or less, and its partial-renovation band is $60–$150 per sq ft — this job is $56.25 per sq ft before contingency, just under the band, because a cosmetic refresh reuses the cabinet boxes.

Big custom job — 200 sq ft, luxury, custom layout, high-cost region. Base 200 × $650 × 1.50 × 1.25 = $243,750; total with 10% contingency $268,125 ($1,340.63 per sq ft). That is above even the CvV major-upscale project ($164,104) — a high-cost-region custom job is a different market from the national-average projects, and the home-value check is the one that matters there.

Metric twin — 20 m² kitchen, midrange, pull-and-replace. 20 m² is 215.28 sq ft, so the base is 215.28 × $250 = $53,820 ($2,691 per m²) and the total with 10% contingency is $59,201. An 18.6 m² kitchen is 200 sq ft — the worked example above, in metric.

Kitchen remodel cost tables: rates by tier and scope, cost by size, the category split, Cost vs Value 2025, and the 2027 tariff

Why the same kitchen costs $40,000, $50,000 and $55,000. The field’s calculator pages agree on the arithmetic — area × rate × scope × region — and still disagree on the answer by more than a third, because they start from different rates. nrtechstudio’s midrange rate is $250 per sq ft, toolfigure’s is $275, and HomeGuide’s full-remodel band is $150–$250 — its midpoint is $200. On a 200 sq ft pull-and-replace kitchen that is $50,000, $55,000 and $40,000 before contingency, and every one of those numbers is honestly computed from a published rate. This page uses nrtechstudio’s rates as its planning basis because they are the only ones published with the scope multipliers and the worked example — and it prints the other two next to its own total, so you can see the spread instead of picking one silently.

The tier-rate spread, named. The same 200 sq ft midrange pull-and-replace job is $40,000 (HomeGuide band midpoint), $50,000 (nrtechstudio) and $55,000 (toolfigure) — and the luxury tier spreads wider still: $650 (nrtechstudio) against $700 (toolfigure). The disagreement is in the rate, not the method: every page multiplies area by a rate, and the rates are planning figures from different years and different cost datasets. Get three written quotes from local contractors — they are the only rates that describe your street.

The category-split disagreement, named. HomeGuide’s split puts cabinets at 25% and labour at 15%; the National Kitchen & Bath Association’s split puts cabinets at 29–30% and labour at 17%; nrtechstudio’s own split puts cabinets at 30% and labour at 20%. The page uses HomeGuide’s because it is the only one published as a complete table that sums to 100% — and it names the alternatives here so you know the split is a budgeting guide, not a law. Whichever split you use, cabinets are the biggest line by a wide margin, and labour is the second.

The component cross-check is a partial build — that is the point. themagiccodex’s $16,188 for a 120 sq ft kitchen prices cabinets, counters, appliances and flooring plus 20% labour on materials — and states plainly that plumbing, electrical work, permits, demolition and disposal, painting, and the sink and tap are not included. Against the top-down $30,000 base for the same kitchen, the gap is about $13,800 of excluded work plus the labour on it. Use the cross-check to sanity-check the materials, not to set the budget: a quote that matches the cross-check has left half the job out.

The 2027 cabinet tariff, in full. Section 232 duties on imported kitchen cabinets and vanities are 25% now (since 14 October 2025, Proclamation 10976) and rise to 50% on 1 January 2027 (Proclamation 11000, published 9 January 2026 — it delayed the rise a full year from 1 January 2026, and it can be amended again by a later proclamation). The duty is on the customs value of the imported goods — not on the installed price — and the rate follows the date the cabinets enter the US for consumption, not the date you order them. Country rates differ: Vietnam 25% → 50%, China 50% → 75% (Section 232 plus Section 301, before anti-dumping and countervailing duties, which run far higher); the UK is at 10% and the EU, Japan, South Korea and Taiwan are capped at 15% combined. Countries that reach an agreement with the US are excepted from the rise. If your cabinets are already in the country, or enter before 1 January 2027, the 25% rate applies — order timing matters only through the entry date, so ask your supplier when the cabinets clear customs, not when the order is placed.

Cost vs Value is a Realtor survey, not a price. The 2025 Cost vs Value report (Journal of Light Construction, the latest edition) asks real-estate professionals what a remodel adds to a home’s resale value. A minor midrange kitchen recouped 112.9% — more than it cost — because it is cheap and it fixes the room buyers notice first. A major midrange kitchen recouped 50.9% and a major upscale one 35.7%: the dearer the kitchen, the smaller the share that comes back. Those are national averages for a 200 sq ft kitchen; a kitchen in a $200,000 house does not recoup like the same kitchen in a $600,000 house.

Small kitchens cost more per square foot. HomeGuide’s size table shows it: a 64 sq ft kitchen at the high end is $350 per sq ft, a 400 sq ft kitchen at the high end is $350 per sq ft too — but at the basic end the small kitchen is $60–$150 and the large one $60–$150 as well, and the fixed costs (design, permits, delivery, the plumber’s call-out) spread over fewer square feet in a small kitchen. The per-square-foot rate is a planning shortcut; the fixed costs are what make a small kitchen feel expensive.

Two home-value rules, both published. Consumer Reports and most general guidance say a kitchen redo should cost 5–15% of the home’s total value. The National Kitchen & Bath Association says 15–20% for a full overhaul. They are not contradictory: 5–15% is the rule for a typical remodel, 15–20% is the figure for a comprehensive one. The tool applies both and tells you which band you are in.

Rates by tier and scope ($ per sq ft). nrtechstudio’s tier rates times the scope multipliers — the planning basis of this page. toolfigure’s rates ($160/$275/$450/$700) sit about 10% above these at every tier.

TierRateCosmetic (× 0.45)Pull-and-replace (× 1.00)Custom (× 1.50)
Budget$125$56.25$125$187.50
Midrange$250$112.50$250$375
High-end$400$180$400$600
Luxury$650$292.50$650$975

Cost by kitchen size (HomeGuide). Small / partial is the $60–$150 band, average / full the $150–$250 band, high-end the $250–$350 band. These are costs before contingency.

SizeSmall / partialAverage / fullHigh-end
8′ × 8′ (64 sq ft)$3,800–$9,600$9,600–$16,000$16,000–$22,400
8′ × 10′ (80 sq ft)$4,800–$12,000$12,000–$20,000$20,000–$28,000
10′ × 10′ (100 sq ft)$6,000–$15,000$15,000–$25,000$25,000–$35,000
10′ × 12′ (120 sq ft)$7,200–$18,000$18,000–$30,000$30,000–$42,000
12′ × 12′ (144 sq ft)$8,600–$21,600$21,600–$36,000$36,000–$50,400
15′ × 15′ (225 sq ft)$13,500–$33,800$33,800–$56,300$56,300–$78,800
18′ × 18′ (324 sq ft)$19,400–$48,600$48,600–$81,000$81,000–$113,400
20′ × 20′ (400 sq ft)$24,000–$60,000$60,000–$100,000$100,000–$140,000

Where the money goes (HomeGuide’s breakdown, % of the base). The only complete published split that sums to 100%. The NKBA’s alternative: cabinets 29–30%, labour 17%, appliances 14%, countertops 10–11%, flooring 7%, lighting 5%.

CategoryShareOn a $50,000 base
Cabinets & shelving25%$12,500
Installation & labour15%$7,500
Appliances15%$7,500
Countertops & backsplash10%$5,000
Flooring7%$3,500
Lighting5%$2,500
Painting & drywall5%$2,500
Doors & windows4%$2,000
Designer5%$2,500
Sink & faucet5%$2,500
Plumbing3%$1,500
Miscellaneous (smart upgrades, permits, etc.)1%$500

Cost vs Value 2025 (Journal of Light Construction, national averages, 200 sq ft kitchen). The 2025 edition is the latest; some secondary sites call the same dataset “2026” — the publisher’s edition is 2025.

ProjectCostResale valueRecouped
Minor midrange remodel$28,458$32,141112.9%
Major midrange remodel$82,793$42,13050.9%
Major upscale remodel$164,104$58,56135.7%

Component prices (themagiccodex — the cross-check’s price list). Countertop prices are planning prices; HomeGuide’s installed countertop range is $50–$150 per sq ft.

ComponentBudgetMidrangeHigh-end / luxury
Cabinets (per linear ft)$150 (stock)$250 (semi-custom)$450 (custom)
Countertops (per sq ft)$35 (laminate)$85 (quartz)$95 (granite)
Appliance package$2,500$4,500$9,000
Flooring (per sq ft)$6 vinyl$9 laminate$12 hardwood / $14 tile
Labour20% of materials cost (35%+ when walls, plumbing or gas lines move)

Structural work and flat extras. Wall-removal figures are HomeGuide’s; flat extras are toolfigure’s model values (HomeGuide publishes ranges instead).

ItemCostNote
Remove non-load-bearing wall$500–$2,000Per wall
Remove load-bearing wall$4,000–$15,000Per wall, plus a structural engineer
Structural engineer$1,900–$3,700+1–5% of the project budget (HomeGuide’s kitchen guide; its wall-removal guide says $300–$1,000)
Kitchen island$3,500Flat add-on; HomeGuide range $3,000–$5,000 installed
Custom cabinets upgrade$8,000Flat add-on
Quartz countertops$4,000Flat add-on
Appliance package$2,500Flat add-on; HomeGuide range $2,500–$6,800 installed
Lighting upgrade$2,000Flat add-on
Permits$500–$1,500HomeGuide; jobs that move structure, plumbing or wiring usually need one
Gut / demolition$500–$2,500$5.00–$12.50 per sq ft for an average kitchen

Timelines. Cabinet lead time is the long pole — order the cabinets first, and do not demolish until they are on site.

ScopeBuild timeCabinet lead time
Cosmetic refresh1–2 weeksStock cabinets ship in days
Pull-and-replace6–10 weeksSemi-custom 8–12 weeks
Custom / new layout3–6 monthsFully custom 8–12 weeks (up to 16)

Whole-kitchen averages, for a sense check. Angi $26,990 ($14,592–$41,619) · HomeGuide $15,000–$50,000 · Fixr about $27,000 ($15,000–$45,000) · CostToRenovate $27,000 average ($14,500–$41,500). If your total is far outside $15,000–$50,000 for a midrange job, check the tier, the scope and the area first — one of them is usually wrong.

Measurement tips

  • Keep the layout if you can. Moving the sink, the range or a wall is what turns a $50,000 pull-and-replace into a $75,000 custom job — the scope multiplier is 1.50× for a reason. A layout that works with new surfaces is the cheapest saving on this page.
  • Price the cabinets first — they are a quarter of the job. Cabinets are 25% of the total and the longest lead time (8–12 weeks semi-custom, up to 16 fully custom). Order them before you demolish anything, and get the cabinet quote in writing before the rest of the job is priced.
  • Ask when the cabinets enter the country, not when you order them. The Section 232 duty follows the entry date: cabinets that clear customs before 1 January 2027 pay 25%, after it they pay 50%. A supplier who can land the cabinets in December saves the step-up — get the entry date in writing.
  • Use the cross-check on the materials, not on the budget. The component build prices cabinets, counters, appliances and flooring — the four lines you can shop. If a contractor’s materials are far above the cross-check, ask what is different; if a quote matches the cross-check, ask what was left out (plumbing, electrical, permits, demolition).
  • Hold the full 10% contingency, and hold it outside the budget. nrtechstudio’s advice is to keep 10–20% outside the category targets, not inside them — a contingency folded into the total gets spent on upgrades, and then the rot behind the sink has no money left.
  • Get three written quotes, and make them quote the same scope. The tier-rate spread on this page ($40,000–$55,000 for one kitchen) exists because rates differ; quotes differ for the same reason. Give every contractor the same tier, scope and materials list, or the quotes cannot be compared.
  • Check the job against your home’s value before you sign. A $55,000 kitchen is 13.75% of a $400,000 home and 27.5% of a $200,000 one — the same job, two different answers. The 5–15% rule is the general check; 15–20% is the NKBA’s figure for a full overhaul.
  • Buy the appliances as a package. A matching set runs $2,500–$6,800 installed, and buying the set usually cuts the per-unit price. Measure the openings before you order — a 36-inch refrigerator does not fit a 33-inch opening, and the return freight costs more than the measuring tape.
  • Do not demolish before the cabinets are on site. The cabinet lead time (8–12 weeks) is the long pole of the job, and a kitchen torn out with no cabinets coming is a kitchen you cannot use for a month. The demolition is the fast part; the waiting is the slow part.
  • Keep the old kitchen’s good parts. Cabinet boxes in sound condition can be refaced for $5,000–$13,000 instead of replaced for $4,500–$15,000, and painting them costs $900–$3,800. A cosmetic refresh at 0.45× the rate is a real remodel, not a compromise — it is how a $50,000 job becomes a $22,500 one.

Common mistakes

  • Budgeting from the component cross-check. The $16,188 cross-check for a 120 sq ft kitchen excludes plumbing, electrical, permits, demolition, painting and the sink — about $13,800 of work on the top-down total. A budget built on the cross-check runs out of money at the plumbing.
  • Forgetting the contingency — or spending it on upgrades. The 10% is for what the demolition finds: rot, bad wiring, out-of-level floors. If it is spent on a better faucet in week one, there is nothing left for the joist in week three.
  • Treating the tariff as a tax on the whole job. The Section 232 duty is on the customs value of the imported cabinets — not on the installed price, and not on the labour, the counters or the appliances. A $3,125 step-up on a $50,000 job is the upper bound; the real figure is usually lower.
  • Ordering cabinets after demolition. Semi-custom cabinets take 8–12 weeks and fully custom up to 16. Demolishing first means cooking in a gutted room for a season — order the cabinets, confirm the delivery date, then swing the hammer.
  • Sizing the budget to the house next door. A $50,000 kitchen is sensible on a $400,000 home and reckless on a $200,000 one. The home-value check exists because the same job has a different answer in a different house — and because the Cost vs Value resale figure is a national average, not your street.
  • Comparing quotes that quote different scopes. One contractor’s $40,000 and another’s $55,000 can both be honest if one is pricing laminate counters and the other quartz, or one is keeping the layout and the other moving a wall. The tier and the scope have to match before the prices can.
  • Counting labour as a share of the total when the source means materials. themagiccodex’s 20% labour figure is 20% of the materials cost — on a $13,490 materials bill that is $2,698, not 20% of a $30,000 job. Mixing the two bases overstates the labour by half.
  • Assuming a wall is not load-bearing. A load-bearing wall costs $4,000–$15,000 to remove plus a structural engineer at $1,900–$3,700+ — and removing one without the engineer is a structural failure, not a saving. Only an engineer can say whether a wall carries load.
  • Reading Cost vs Value as a promise. The 112.9% on a minor midrange kitchen is a Realtor-survey estimate for a 200 sq ft kitchen nationally. Your buyer, your street and your house’s price band move it — a $164,104 upscale kitchen that recoups 35.7% is still $105,000 that does not come back.
  • Forgetting permits and demolition in the budget. Permits run $500–$1,500 and a gut runs $500–$2,500, and most jobs that move structure, plumbing or wiring need a permit. They are 1% and a few hundred dollars on a $50,000 job — and the reason a $50,000 job becomes a $53,000 job after the first inspection.

Factors that affect accuracy

  • Floor area — the load scales with it, but not only with it. Every rate is per square foot, so the base is linear in area — but the fixed costs (design, permits, delivery, the plumber’s call-out) do not scale, which is why a small kitchen costs more per square foot than a large one. Measure wall to wall; a 20 sq ft error is $5,000 at the midrange rate.
  • Finish tier — the biggest lever. The tier moves a 200 sq ft kitchen from $25,000 (budget) to $130,000 (luxury) before scope or region. Stock vs semi-custom vs custom cabinets is the decision inside the tier — $150 vs $250 vs $450 per linear foot — and it is made once, at the order.
  • Scope — layout is money. Cosmetic is 0.45×, pull-and-replace is 1.00× and custom is 1.50× the same tier rate. Moving the sink or the range means moving plumbing and gas; moving a wall means an engineer. If the layout works, keeping it is the cheapest saving on the page.
  • Region — labour and materials both vary. The 0.92×–1.25× range is nrtechstudio’s published spread, and the page’s three settings are a simplification of it. A California kitchen can reach $800+ per sq ft; the region selector is a planning factor, not a price list for your city.
  • Cabinets — a quarter of the job and the tariff’s target. Cabinets and shelving are 25% of the HomeGuide split, the biggest single line, and the only line the Section 232 duty touches. The cabinet tier (stock $150, semi-custom $250, custom $450 per linear foot) and the entry date (before or after 1 January 2027) are the two decisions that move it.
  • Countertops — the second material decision. Laminate $35, butcher block $55, quartz $85 and granite $95 per sq ft as planning prices; HomeGuide’s installed range is $50–$150. A 50 sq ft counter run is $1,750 in laminate and $4,750 in granite — the material choice is a $3,000 decision on one surface.
  • Appliances — package vs pieces. A package runs $2,500 (basic) to $9,000 (high-end) in the cross-check, and $2,500–$6,800 installed per HomeGuide. Buying the set cuts the per-unit price; buying pieces lets you keep a working refrigerator — but a mismatched set costs more per unit.
  • Structural work — the hidden multiplier. A non-load-bearing wall is $500–$2,000; a load-bearing one is $4,000–$15,000 plus an engineer at $1,900–$3,700+. One wall can add a fifth to a $50,000 job — and it is the line most often missing from the first quote.
  • Age and condition — what demolition finds. Old kitchens hide rot behind the sink, wiring that does not meet code, out-of-level floors and plumbing in the wrong place. That is what the 10–20% contingency is for, and why a 1960s kitchen costs more than a 2010s one at the same tier.
  • Home value — the budget’s ceiling. The 5–15% general rule and the NKBA’s 15–20% for a full overhaul are the two published ceilings. A remodel that costs more than a fifth of the house rarely returns it at resale — the Cost vs Value table shows why: the dearer the kitchen, the smaller the share that comes back.

Sources & assumptions

  • Method — top-down: base = kitchen area (sq ft) × tier rate × scope multiplier × region multiplier; category split applied to the base; subtotal adds wall removals, flat extras and the tariff uplift; total adds the contingency. Tier rates are nrtechstudio's ($125 budget / $250 midrange / $400 high-end / $650 luxury per sq ft); scope multipliers are nrtechstudio's (cosmetic 0.45× / pull-and-replace 1.00× / custom 1.50×); the region triplet (low 0.92× / average 1.00× / high 1.25×) is this page's planning simplification of nrtechstudio's published 0.92×–1.25× range (1.00× national average) — no source publishes the discrete triplet, and the page says so. The component cross-check is themagiccodex's price list (see below). Confirmed 2026-11-21 against nrtechstudio's kitchen remodel cost calculator (tier rates, scope multipliers, worked example, contingency, timelines) and toolfigure's kitchen remodel cost calculator (rates $160/$275/$450/$700, flat extras).
  • HomeGuide bands, size table, category split, wall removal, engineer fee, permits, appliance package, island — HomeGuide's kitchen remodel cost page (live read 2026-11-21): basic $60–150 / full $150–250 / high-end $250–350 per sq ft; whole kitchen $15,000–$50,000; size table 64–400 sq ft (120 sq ft average/full $18,000–$30,000); category split 12 rows summing to exactly 100% (cabinets & shelving 25%, installation & labour 15%, appliances 15%, countertops & backsplash 10%, flooring 7%, lighting 5%, painting & drywall 5% as ONE combined line, doors & windows 4%, designer 5%, sink & faucet 5%, plumbing 3%, miscellaneous 1%); non-load-bearing wall $500–$2,000, load-bearing $4,000–$15,000; structural engineer $1,900–$3,700+ (1–5% of budget) — HomeGuide's wall-removal guide says $300–$1,000 instead, and the page notes the conflict; permits $500–$1,500; appliance package $2,500–$6,800 installed; island $3,000–$5,000 installed; gut/demolition $500–$2,500 ($5.00–$12.50 per sq ft); labour 15%+ of the total budget.
  • Worked example — 200 sq ft midrange pull-and-replace = $50,000 base, $55,000 with 10% contingency, reproduced exactly from nrtechstudio's worked example (200 × $250 = $50,000; +10% = $5,000; planning budget $55,000, $275/sq ft). The $40,000–$55,000 spread is HomeGuide's band midpoint ($200 × 200) vs nrtechstudio's $250 vs toolfigure's $275; calcthejob's midpoint for the 120 sq ft job is $28,800.
  • Component cross-check — themagiccodex's kitchen remodel calculator: cabinets stock $150 / semi-custom $250 / custom $450 per linear ft; counters laminate $35 / butcher block $55 / quartz $85 / granite $95 per sq ft (planning prices — HomeGuide's installed countertop range is $50–$150); appliances basic $2,500 / mid-range $4,500 / high-end $9,000; flooring vinyl $6 / laminate $9 / hardwood $12 / tile $14 per sq ft; labour 20% OF MATERIALS COST (35%+ when walls, plumbing or gas lines move). Its 120 sq ft example reproduced exactly: cabinets 20 LF × $250 = $5,000 + quartz 30 sq ft × $85 = $2,550 + appliances $4,500 + hardwood 120 × $12 = $1,440 = materials $13,490 + labour 20% $2,698 = $16,188 ($134.90/sq ft). Exclusions stated on the page: plumbing, electrical work, permits, demolition and disposal, painting, sink and tap — so the cross-check is a partial build by design.
  • Flat extras are toolfigure model values, not published prices — toolfigure's formula: island $3,500 + custom cabinets $8,000 + quartz countertops $4,000 + appliance package $2,500 + lighting upgrade $2,000. HomeGuide publishes ranges instead (island $3,000–$5,000; appliance package $2,500–$6,800); the page labels the flats as calculator add-ons.
  • Cost vs Value 2025 — Journal of Light Construction's 2025 Cost vs Value report (national averages, 200 sq ft kitchen): minor midrange $28,458 cost / $32,141 resale / 112.9% recouped; major midrange $82,793 / $42,130 / 50.9%; major upscale $164,104 / $58,561 / 35.7%. The 2025 edition is the latest as of 29 Oct 2026 (Beycome; Kitchen Cabinet Kings) — several secondary sites loosely call the same dataset "2026"; this page keeps the publisher's 2025 label. One secondary source prints $42,156/$58,592; JLC's primary pages give $42,130/$58,561, matching 50.9%/35.7% exactly. The resale values are Realtor-survey estimates.
  • Section 232 cabinet tariff — Proclamation 11000 (91 FR 1039, published 9 Jan 2026), quoted via FBM Sourcing and Bolton Built: 25% since 14 Oct 2025 (Proclamation 10976), rising to 50% on 1 Jan 2027 except for countries reaching a US agreement; the rise was delayed a full year from 1 Jan 2026. HTSUS 9403.40.9060 (wooden kitchen cabinets for permanent installation); vanities 9403.60.8093. Vietnam 25%→50%; China 50%→75% (Section 232 + Section 301, BEFORE anti-dumping/countervailing duties); UK 10%; EU, Japan, South Korea and Taiwan capped at 15% combined — ZentriaFlow and Kitchen & Bath Renovators. The duty is on the customs value of the imported goods, not the installed price, and the rate follows the date of entry for consumption, not the order date. The tool's tariff toggle adds the 25-point step-up on the cabinet line as an UPPER BOUND (it assumes the whole cabinet line is dutiable customs value); the page says so.
  • Home-value rules — both published, scope-dependent: 5–15% general rule (Consumer Reports, Kitchen Makeovers Made Easy; nrtechstudio) vs 15–20% for a full overhaul (National Kitchen & Bath Association, via Lars Remodel). Category-split alternative: NKBA cabinets 29–30%, labour 17% (same source); nrtechstudio's own split is cabinets 30%, labour 20%.
  • Timelines and contingency — nrtechstudio: cosmetic 1–2 weeks, pull-and-replace 6–10 weeks, custom 3–6 months, cabinet lead 8–12 weeks; contingency 10% recommended, 10–20% range. Corroborated by QuikCabinets 2026 (fully custom cabinets 10–16 weeks) and ProCraft Local. This Old House 10–15% contingency; HomeGuide at least 5%. Whole-kitchen averages: Angi $26,990 ($14,592–$41,619); HomeGuide $15,000–$50,000; Fixr about $27,000 ($15,000–$45,000); CostToRenovate $27,000 average ($14,500–$41,500).

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

How this calculator was checked

Figures checked 21 November 2026. Each case below was recomputed from the calculator's own formula and matched the tool's output.

Test inputsExpected result
200 sq ft, midrange, pull-and-replace, average region, 10% contingency$50,000 base, $55,000 total ($275/sq ft)
Same job, 2027 tariff on$3,125 tariff uplift, $58,438 total
120 sq ft, midrange, hardwood (themagiccodex cross-check)$16,188 component total ($134.90/sq ft)
100 sq ft, budget, cosmetic$5,625 base, $6,188 total
200 sq ft, luxury, custom, high-cost region$243,750 base, $268,125 total
20 m², midrange, pull-and-replace$53,820 base, $59,201 total
$55,000 job, $400,000 home value13.75% of home value — inside the 5–15% rule

What this check does not cover

  • The cross-check cases use themagiccodex’s stated assumptions (1 linear ft of cabinets per 6 sq ft, 1 sq ft of counter per 4 sq ft of floor) — measure your own cabinet run and counter area for the real figure.
  • The tariff case is an upper bound: it assumes the whole $12,500 cabinet line is dutiable customs value. The real duty is on the imported share’s customs value only.
  • The home-value verdict uses the two published rules (5–15% general, 15–20% NKBA for a full overhaul) — a local agent’s view of your street beats either rule.
  • The CvV comparison is scope-based (cosmetic → minor midrange, pull-and-replace → major midrange, custom → major upscale) for a 200 sq ft kitchen; your kitchen’s size moves the comparison.
Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • This is a planning estimate, not a contractor quote. It prices from floor area, published per-square-foot rates and published category splits — the method the field’s calculator pages use — not from your kitchen’s actual cabinets, counters, appliances and labour market. Three written quotes from local contractors govern the real price: get them before you sign anything.
  • The tier rates are national planning rates (nrtechstudio’s $125/$250/$400/$650 per sq ft). A California kitchen can run $800+ per square foot and a Florida one far less — the region selector moves the answer by 0.92× to 1.25×, but it cannot see your city. A local quote beats any national rate.
  • The 2027 tariff toggle is an upper bound, not a quote. It adds the 25-point step-up (25% to 50%) on the whole cabinet line, as if the entire cabinet price were dutiable customs value. The real duty applies only to the customs value of the imported share — ask your supplier what share of the cabinet price is customs value, and whether the cabinets enter before or after 1 January 2027.
  • The component cross-check is a partial build by design: it prices cabinets, counters, appliances and flooring plus labour at 20% of materials, and it does NOT include plumbing, electrical work, permits, demolition and disposal, painting, or the sink and tap. It will always read lower than the top-down total — that gap is the exclusions, not a saving.
  • The Cost vs Value figures are national averages for a 200 sq ft kitchen, and the resale value is a Realtor-survey estimate, not a price a buyer will pay for your kitchen. A remodel in a $200,000 house does not recoup like the same remodel in a $600,000 house — the home-value verdict below is the check that matters.
  • This page prices the remodel; it does not design it. It does not check whether a wall is load-bearing (only a structural engineer can), whether your panel can carry the new appliances, or whether the work needs a permit — your city’s building department decides the last one, and most jobs that move plumbing, wiring or structure need one.

Kitchen Remodel Cost Calculator — How Much Does a Kitchen Remodel Cost? — frequently asked questions

How much does a kitchen remodel cost?

A 200 sq ft kitchen, midrange finish, pull-and-replace scope, in an average-cost area costs $50,000 before contingency — $55,000 with the 10% contingency ($275 per sq ft). The same job is $40,000 at HomeGuide’s band midpoint, $50,000 at nrtechstudio’s $250 rate and $55,000 at toolfigure’s $275 rate — the spread is the field’s, and the result above shows all three. Enter your area, tier and scope above for your exact total.

How much does a kitchen remodel cost per square foot?

$60–$350 per square foot, depending on tier and scope. HomeGuide’s bands are basic $60–$150, full $150–$250 and high-end $250–$350 per sq ft. By tier (nrtechstudio): budget $125, midrange $250, high-end $400, luxury $650 — times the scope (cosmetic 0.45×, pull-and-replace 1.00×, custom 1.50×) and the region (0.92×–1.25×). A midrange pull-and-replace kitchen is $250 per sq ft before contingency, $275 with it.

How much does a 10×10 kitchen remodel cost?

$15,000–$25,000 for a full remodel of a 10×10 ft (100 sq ft) kitchen — HomeGuide’s average/full column for that size. This tool prices it at $25,000 before contingency ($27,500 with 10%) at the midrange rate, which sits at the top of the band; a budget cosmetic refresh of the same kitchen is $5,625 before contingency. A 12×12 ft kitchen (144 sq ft) is $21,600–$36,000 on HomeGuide’s table.

What is the most expensive part of a kitchen remodel?

Cabinets — 25% of the total, about $12,500 on a $50,000 job. HomeGuide’s breakdown puts cabinets and shelving first, then installation and labour (15%, $7,500) and appliances (15%, $7,500), then countertops and backsplash (10%, $5,000) and flooring (7%, $3,500). The NKBA’s split is heavier still on cabinets (29–30%) and labour (17%). Cabinets are also the line the 2027 tariff touches.

How much do new kitchen cabinets cost?

$150 per linear foot for stock, $250 for semi-custom and $450 for custom (themagiccodex’s price list) — so a 200 sq ft kitchen with about 33 linear ft of cabinets is roughly $5,000 stock, $8,333 semi-custom or $15,000 custom, before installation. Replacing cabinets completely runs $4,500–$15,000 for an average kitchen (HomeGuide), and up to $36,000+ for high-end custom in a 200+ sq ft kitchen. Refacing is $5,000–$13,000; painting them is $900–$3,800.

Will the 2027 cabinet tariff raise my kitchen cost?

Yes, if your cabinets are imported and enter the US on or after 1 January 2027 — the Section 232 duty doubles from 25% to 50%. On a $50,000 job the cabinet line is $12,500, so the 25-point step-up adds up to $3,125 (upper bound — the real duty is on the customs value of the imported share, not the installed price). The duty is on customs value, and the rate follows the entry date, not the order date — cabinets that clear customs before 1 January 2027 still pay 25%. Vietnam goes 25% → 50% and China 50% → 75% (before anti-dumping duties); the UK is at 10% and the EU and Japan are capped at 15%. Use the tariff toggle above to price your job both ways.

Should I order my cabinets before 1 January 2027?

What matters is when the cabinets enter the US, not when you order them. The 50% rate applies to cabinets entering on or after 1 January 2027 — an order placed in December that clears customs in January pays 50%. Ask your supplier for the entry date in writing, and if the cabinets can land before 1 January 2027, that is the saving. Note the rise was already delayed once (from 1 January 2026), and a later proclamation could change it again — the page’s tariff section carries the full detail.

How much contingency should I allow for a kitchen remodel?

10% is the recommended default, and 10–20% is the recommended range. nrtechstudio recommends 10% and says to keep 10–20% outside the category targets; This Old House says 10–15%; HomeGuide says at least 5%. On a $50,000 job that is $5,000 — and it is for what the demolition finds (rot, bad wiring, out-of-level floors), not for upgrades. Keep it outside the budget, not inside it.

How much of my home’s value should a kitchen remodel cost?

5–15% is the general rule; 15–20% is the National Kitchen & Bath Association’s figure for a full overhaul. A $55,000 kitchen is 13.75% of a $400,000 home (inside the general rule), 18.33% of a $300,000 home (inside the NKBA band) and 27.5% of a $200,000 home (above both). Enter your home value above and the tool tells you which band your job falls in.

How long does a kitchen remodel take?

1–2 weeks for a cosmetic refresh, 6–10 weeks for a pull-and-replace, and 3–6 months for a custom job with a new layout. Cabinet lead time is the long pole: semi-custom cabinets take 8–12 weeks, fully custom 8–12 weeks and up to 16. Order the cabinets first and do not demolish until they are on site — a gutted kitchen with no cabinets coming is unusable for a season.

What is the return on a kitchen remodel?

The 2025 Cost vs Value report (Journal of Light Construction, the latest edition) says a minor midrange kitchen recouped 112.9% ($32,141 back on $28,458), a major midrange kitchen 50.9% ($42,130 on $82,793) and a major upscale kitchen 35.7% ($58,561 on $164,104). The cheaper the kitchen, the larger the share that comes back — a $164,104 kitchen leaves about $105,000 unrecovered. Those are national averages for a 200 sq ft kitchen, and the resale value is a Realtor-survey estimate, not a price a buyer will pay.

How much does a kitchen remodel cost in square metres? (metric)

A 20 m² kitchen, midrange, pull-and-replace costs $53,820 before contingency — $59,201 with 10% ($2,691 per m²). 20 m² is 215.28 sq ft, and the tool prices in dollars per square foot either way — enter the area in square metres above and it converts. An 18.6 m² kitchen is 200 sq ft, the worked example: $50,000 before contingency, $55,000 with it. Per-square-metre rates: midrange pull-and-replace is about $2,691 per m²; budget cosmetic is about $606 per m².

What does a 20 m² kitchen remodel cost at the budget tier? (metric)

A 20 m² kitchen at the budget tier, pull-and-replace scope, costs $26,910 before contingency — $29,601 with 10%. 20 m² is 215.28 sq ft × $125 per sq ft. The same kitchen as a cosmetic refresh (× 0.45) is $12,109 before contingency, $13,320 with 10%. At the midrange tier the same 20 m² pull-and-replace kitchen is $53,820 before contingency ($59,201 with 10%). Enter the area in square metres above for your exact total.

Next step

Take the base, the category split and the ±15% planning range to three contractors — and make them quote the same tier, scope and materials, or the quotes cannot be compared. Then price the counters with the countertop calculator, the cabinet paint with the cabinet paint calculator, the floor with the flooring calculator and the tile with the tile calculator — and ask your cabinet supplier, in writing, when the cabinets clear customs, since the 2027 tariff follows the entry date.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.