Stucco Calculator
Most stucco calculators get the arithmetic wrong in exactly one place: they work out how many bags one coat needs and then divide by the number of coats, as if one bag could cover three coats at once. It cannot — the scratch coat, the brown coat and the finish coat are three separate layers of material on the same wall, and each one needs its own bags. This stucco calculator counts every coat separately and adds them, for a traditional 3-coat system (scratch + brown + finish, 7/8 in total over lath) in feet or metres. Pick pre-mix (80-lb basecoat bags, the manufacturer coverage rate) or site-mix (94-lb cement bags + masonry sand tons, scratch 1:3, brown 1:4), enter the net wall area (openings deducted) and the coat thicknesses, and you get bags per coat, sand tons per coat in site-mix mode, lath area, and an installed-cost estimate. For the wall itself, use the brick calculator, the concrete block calculator or the mortar calculator, for the plaster behind an interior finish the plaster calculator, and for the paint after the 28-day cure the paint calculator.
Planning this project? Save to Pinterest to find this calculator again later.
How to use the Stucco Calculator
- Pick the system first: pre-mix for 80-lb basecoat and finish bags, site-mix for 94-lb cement bags plus masonry sand tons. Only the fields for your system are priced; the coat counts are shown either way.
- Enter the gross wall area and the openings area — the calculator deducts doors and windows, so measure them too and add their areas together. A door is about 21 ft2 (2 m2) of wall you are not stuccoing.
- Check the coat thicknesses: scratch 3/8 in, brown 3/8 in, finish 1/8 in is the standard 3-coat build-up, 7/8 in in total. Thicker coats use more bags per square foot — the tool scales the coverage inversely with thickness, so a 1/2 in base coat needs more bags than a 3/8 in one.
- Read the bags per coat, not just the total. The scratch bags, the brown bags and the finish bags are three separate orders on three separate days — rounding each coat up separately (as this tool does) means the brown coat never waits on a half-bag the scratch coat already used.
- In site-mix mode, read the cement bags and the sand tons per base coat as well as the totals: scratch at 1:3, brown at 1:4. The finish coat stays in 80-lb finish bags in both modes.
- Read the lath area next: it equals the net wall area plus your waste allowance for cuts around openings and corners. Order paper backing and fasteners from your lath supplier's chart — this tool does not count them.
- Enter your bag, sand, lath and labour prices for an installed-cost estimate — useful for comparing DIY against a stucco contractor's quote.
Stucco Calculator formula
Worked example
A 155 sq ft wall (no openings to deduct), pre-mix, scratch 3/8 in + brown 3/8 in + finish 1/8 in, 0% waste. Step one — scratch coat: 155 / 24 = 6.46, rounded up to 7 x 80-lb basecoat bags. Step two — brown coat: the same wall again, 155 / 24 = 6.46, rounded up to 7 x 80-lb basecoat bags. Step three — finish coat: 155 / 87.5 = 1.77, rounded up to 2 x 80-lb finish bags. Step four — total: 7 + 7 + 2 = 16 bags, plus 155 ft2 (14.40 m2) of lath. This is the correct per-coat arithmetic: a rival page that multiplies 25 sq ft per coat by 3 coats to get 75 sq ft per bag, then divides 155 / 75 = 2.07 and rounds up to 3 bags, is thirteen bags short — it counted each bag three times instead of counting each coat once.
Imperial version: a 100 sq ft wall, pre-mix, same coats, 0% waste. Scratch: 100 / 24 = 4.17, rounded up to 5 bags; brown: 5 bags; finish: 100 / 87.5 = 1.14, rounded up to 2 bags; total 12 bags, lath 100 ft2 (9.29 m2). With 10% waste the ordering area is 110 sq ft — scratch 110 / 24 = 4.58, rounded up to 5; brown 5; finish 110 / 87.5 = 1.26, rounded up to 2 — still 12 bags, lath 110 ft2 (10.22 m2).
Metric version: a 10 m2 wall (107.64 ft2), pre-mix, same coats, 0% waste. Scratch: 107.64 / 24 = 4.49, rounded up to 5 bags; brown: 5 bags; finish: 107.64 / 87.5 = 1.23, rounded up to 2 bags; total 12 bags, lath 10 m2 (107.64 ft2). A 100 m2 wall (1,076.39 ft2) needs scratch 1,076.39 / 24 = 44.85, rounded up to 45 bags; brown 45 bags; finish 1,076.39 / 87.5 = 12.30, rounded up to 13 bags; total 103 bags, lath 100 m2.
Site-mix version: a 1,000 sq ft wall, site-mix, 3/8 in + 3/8 in + 1/8 in, 0% waste. Scratch (1:3): wet = 1,000 x 0.375 / 12 = 31.25 ft3; dry = 31.25 x 1.33 = 41.56 ft3; cement = 41.56 / 4 = 10.39 ft3, rounded up to 11 x 94-lb bags; sand = 41.56 x 3 / 4 = 31.17 ft3 = 1.56 tons. Brown (1:4): dry 41.56 ft3; cement = 41.56 / 5 = 8.31 ft3, rounded up to 9 x 94-lb bags; sand = 41.56 x 4 / 5 = 33.25 ft3 = 1.66 tons. Finish: 12 x 80-lb bags (1,000 / 87.5 = 11.43, rounded up). Totals: 20 x 94-lb cement bags + 12 finish bags + 3.22 tons (2.92 tonnes) of masonry sand, lath 1,000 ft2 (92.90 m2). The published site-mix yield (one 94-lb bag about 110 sq ft @ 3/8 in) would give 10 bags per base coat; this tool's dry-factor figure runs one bag higher per coat, which is the safe side to order on.
Coverage / yield reference — per coat, each figure labelled with its thickness:
| Material / coat | Coverage | Thickness |
|---|---|---|
| Pre-mix 80-lb basecoat (scratch or brown) | 24 sq ft per bag | 3/8 in |
| Pre-mix 80-lb basecoat, data sheets (Quikrete / Sakrete / Omega / Western) | 16-17 sq ft per bag | 1/2 in |
| Site-mix 94-lb cement (base coats) | About 110 sq ft per bag (3.4-3.8 ft3 yield) | 3/8 in |
| Finish 80-lb bag (this tool: 87.5 midpoint) | 75-100 sq ft per bag | About 1/8 in |
| Scratch + brown combined (numericcore, rival figure — combined total, NOT per-coat) | 1 bag per 25-30 sq ft | Both base coats together |
Lath note. Traditional 3-coat stucco over framed walls goes over paper-backed wire lath: the paper keeps the wet scratch coat off the framing, the wire gives it something to grip, and the 7/8 in total thickness buries the wire. Lath area equals wall area — this tool adds your waste allowance for cuts around openings, corners and control joints. Over solid masonry (block or brick) no lath is needed, but the surface still needs a dash or bonding coat first on smooth substrates.
Cure schedule. Moist-cure the scratch coat for 48 hours and the brown coat for 48 hours before the next coat goes on — cement cures by hydration, not by drying out, and a coat that dries too fast shrinks and cracks. Keep each coat damp (misting, not flooding) through its 48 hours, longer in hot or windy weather. After the finish coat, wait about 28 days before painting traditional cement stucco, so the alkalinity drops enough for paint to hold.
Measurement tips
- Count per coat, then add. Scratch bags + brown bags + finish bags is the order; any figure that divides a total by 3 has counted each bag three times. The 155 sq ft example above (7 + 7 + 2 = 16, not 3) is the check to run on any other calculator's answer.
- Deduct the openings before anything else. A door (about 21 ft2) and two windows (about 30 ft2 together) remove 51 ft2 from a wall — at 24 sq ft per bag that is 2 bags per base coat, 4 basecoat bags plus finish, and the same fraction of the labour bill.
- Check your bag's data sheet before ordering. Pre-mix basecoat coverage varies by brand and thickness (24 sq ft @ 3/8 in vs 16-17 sq ft @ 1/2 in) — if your bag states a lower coverage than the tool assumes, re-run with the thicker coat or buy the extra bags the data sheet implies.
- Buy finish bags from one batch. Integrally coloured finish coats vary slightly between batches, and a second trip for one more bag can leave a visible shade change across the wall.
- Moist-cure, do not just wait. A scratch or brown coat left to dry out in sun and wind shrinks and cracks before the next coat covers it — mist it and keep it damp for the full 48 hours per coat, longer in hot weather.
- Order sand by the yard's scale, not the calculator's tonnage, once you pass a few tons. Ask the yard for its tons-per-yard figure and its sand density — the scale ticket is what you pay on, and masonry sand density varies by source.
- For site-mix, keep the scratch coat richer than the brown coat (1:3, then 1:4). The richer scratch coat bonds to the lath; the leaner brown coat floats flatter and compacts better for the finish coat.
- Do not paint fresh stucco. Traditional cement stucco needs about 28 days before painting, or the paint peels as alkalinity and moisture work their way out — use the paint calculator only once the cure is done.
- Price the lath as its own line. Lath, paper backing and fasteners are a separate material order from the bags, and forgetting them is the most common reason a stucco materials list comes up short on delivery day.
Common mistakes
- Dividing total bags by the number of coats. One 80-lb bag covering 25 sq ft per coat does NOT cover 75 sq ft across three coats — it covers 25 sq ft three times over, once per coat. The 155 sq ft wall needs 7 + 7 + 2 = 16 bags, not 155 / 75 = 3 bags. This is the single most expensive stucco estimating error, because it leaves the job two-thirds short.
- Using a one-coat coverage rate for a 3-coat job (or the reverse). One-coat systems over foam are a different product at 3/8-1/2 in in a single pass; their coverage rate says nothing about a traditional 3-coat build-up, and the 3-coat rates say nothing about them.
- Counting the gross wall area. Doors and windows are not stuccoed; a wall with one door and two windows over-orders by about a quarter if you skip the deduction on a small wall.
- Skipping the moist cure. Cement stucco cures by hydration: a scratch or brown coat that dries out instead of staying damp for 48 hours shrinks, cracks, and bonds poorly to the next coat — and no amount of finish coat hides it.
- Ordering finish bags by the basecoat rate. The finish coat is about 1/8 in thick, not 3/8 in, so it covers roughly three times the area per bag (75-100 sq ft vs 24 sq ft). Ordering finish at the basecoat rate buys three times too many finish bags.
- Merging the numericcore combined total with per-coat arithmetic. Its 29 basecoat bags per 1,000 sq ft is a combined total on a different basis from this tool's 42 bags per base coat (84 total) at the manufacturer premix rate — quoting one against the other as if one were wrong is how two honest estimates look like a disagreement. Pick one basis and order by it.
- Forgetting lath on framed walls. Bags alone do not make a 3-coat system: without paper-backed wire lath there is nothing for the scratch coat to grip, and the 7/8 in total thickness exists to bury that lath.
- Painting before the 28-day cure. Fresh cement stucco is too alkaline and too damp for paint — paint applied early peels, and the repaint costs more than the wait.
- Using one bare coverage figure for every bag. Pre-mix basecoat yields run 16-24 sq ft per bag depending on brand and thickness, and finish yields run 75-100 sq ft depending on texture — a figure without a thickness and a product attached is not an order quantity.
Factors that affect accuracy
- Number of coats: three coats means three separate material quantities on the same wall — the coat count multiplies the order, it never divides it.
- Coat thickness: coverage per bag is inversely proportional to thickness — a 1/2 in base coat covers about a third less area per bag than a 3/8 in one (24 sq ft scaled to 18 sq ft).
- System: pre-mix bags cost more per square foot than site-mixed cement and sand, but remove on-site batching variation; site-mix needs separate sand tonnage and a mixer, and its yield depends on the crew's batching.
- Mix ratio (site-mix): scratch at 1:3 uses more cement per cubic foot than brown at 1:4 — the ratio changes the cement/sand split and the cost, never the wet volume.
- Finish texture: heavy textures use more finish material than smooth ones, pushing finish coverage toward the 75 sq ft end of the 75-100 range.
- Substrate: rough or porous masonry drinks the scratch coat and lowers coverage per bag; smooth dense substrates need a dash or bonding coat first or the scratch coat delaminates.
- Openings: every door and window subtracted removes basecoat bags, finish bags, sand, lath and labour — net area is the input that matters, not gross.
- Waste: spillage, rebound off the wall, trowel waste and cuts around openings are real consumption — 10% is the floor for most walls, 15% for rough backgrounds or first-time work.
- Weather and curing: hot sun and wind dry coats out before they hydrate, so curing effort (and sometimes material, for rework) rises in summer; cold weather slows the cure and the schedule.
Sources & assumptions
- Pre-mix basecoat coverage: about 24 sq ft per 80-lb bag at 3/8 in — per engineerfix's stucco calculation guide. This tool scales that rate inversely with the thickness you enter (24 x 0.375 / thickness in inches), so a 1/2 in base coat covers 18 sq ft per bag by the tool's arithmetic.
- Basecoat data sheets: about 16 sq ft per 80-lb bag at 1/2 in for Quikrete/Sakrete pre-mixed base coats, 16 for Omega sanded base coats and 17 for Western Blended sanded base coats — per thestuccoguy's pre-mixed base coat calculators, citing the manufacturers' data sheets. At 1/2 in the tool's scaled figure (18) sits just above this 16-17 range; the page says so and advises one spare bag per coat at 1/2 in.
- Site-mix base coats: one part cementitious material to three or four parts sand by volume; one 94-lb bag of portland cement yields about 3.4-3.8 ft3 of finished wet stucco, covering about 110 sq ft at 3/8 in — per engineerfix. This tool assigns scratch 1:3 and brown 1:4, following thestuccoguy's scratch-vs-brown comparison (scratch 3 sand : 1 cement; brown 3:1 also used, 4:1 as the floating option).
- Site-mix method (this tool, stated assumptions): wet volume x 1.33 dry factor (the same convention as this site's plaster and mortar pages); one 94-lb cement bag taken as about 1 ft3 (the same assumption as the mortar page); masonry sand at 100 lb/ft3 (1,600 kg/m3, the same density as the plaster page); 2,000 lb per US ton; 1 US ton = 0.907185 tonnes.
- Coat thicknesses and system total: scratch 3/8 in, brown 3/8 in, finish about 1/8 in or less, 7/8 in total over lath on framed walls, about 1/2 in total directly over solid masonry — per engineerfix. Waste 10-15% on all materials (spillage, rebound, trowel waste) — per engineerfix; this tool defaults to 10% and applies it to the wall area before rounding, per coat.
- Finish-coat rate: about 1 bag per 75-100 sq ft (thin coat, about 1/8 in) — per numericcore's 3-coat stucco tool (ASTM C926). This tool uses the midpoint, 87.5 sq ft per 80-lb bag at 1/8 in — a stated assumption, not a manufacturer claim.
- Rival cross-check ONLY (never this tool's formula): numericcore's 3-coat tool quotes 1,000 sq ft -> 29 x 80-lb basecoat bags + 2.0 tons masonry sand + 10 x 80-lb finish bags, and scratch + brown combined at about 1 bag per 25-30 sq ft. It counts basecoat as a combined total and reads far below per-coat premix arithmetic (42 bags per base coat, 84 total, at 24 sq ft per bag @ 3/8 in) — the page names the gap and warns never to mix the two bases.
- Competitor error debunked, never copied: calculoonline's stucco coverage calculator claims one 80-lb bag 'covers 25 sq ft per coat, so 3 coats = 75 sq ft per bag' and prices a 155 sq ft wall at 3 bags (155 / 75 = 2.07, rounded up). The division is wrong: each coat needs its own bags — 155 sq ft needs 7 scratch + 7 brown + 2 finish = 16 bags by this tool's per-coat arithmetic.
- Cure schedule: moist-cure the scratch coat for 48 hours and the brown coat for 48 hours before the finish coat; traditional cement stucco needs about 28 days before painting — per numericcore. Lath: traditional 3-coat stucco over framed walls goes over paper-backed wire lath at 7/8 in total — per numericcore (3-coat over lath) and engineerfix (7/8 in standard over wood-frame with metal lath).
- Cost, when shown, uses only the prices per bag, per finish bag, per ton of sand, per unit of lath area and labour rate you enter — no prices are preset. Per-coat bags are rounded up separately, then added; the total is never divided by the number of coats.
Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.
Safety note
What this calculator doesn't do
- The tool's pre-mix base-coat rate (24 sq ft per 80-lb bag @ 3/8 in, scaled by thickness) and the bag data sheets (16-17 sq ft per 80-lb bag @ 1/2 in) are different products' figures at different thicknesses, not two measurements of one bag. Scaled to 1/2 in, the tool gives 18 sq ft per bag — just above the 16-17 data-sheet range — so if your coat runs a full 1/2 in thick, buy one spare bag per coat over the tool's count.
- The finish-coat rate is the midpoint of a published range (75-100 sq ft per 80-lb bag @ about 1/8 in), not a manufacturer claim: 87.5 sq ft per bag. A heavy texture finish uses more material than a smooth one, so buy the low end of the range (more bags) for heavy textures.
- The numericcore cross-check (1,000 sq ft -> 29 basecoat bags + 2.0 tons sand + 10 finish bags) is quoted as a rival figure only. It counts basecoat as a combined total and reads far below this tool's per-coat premix arithmetic (42 bags per base coat, 84 in total, at 24 sq ft per bag @ 3/8 in). Do not mix the two bases: if you order by the rival total, you are not ordering per coat.
- Site-mix sand tonnage assumes masonry sand at 100 lb per ft3 (1,600 kg/m3) and one 94-lb cement bag at about 1 ft3 — the same assumptions as this site's plaster and mortar pages. Your yard's sand density and your cement brand's bag volume override these figures; ask the yard for its tons-per-yard figure before ordering bulk.
- The brown coat is costed at 1:4 and the scratch coat at 1:3 in site-mix mode. Some applicators use 1:3 for both coats; if yours does, the brown coat needs more cement and less sand than this tool shows — the difference on 1,000 sq ft at 3/8 in is about 2 extra cement bags for the brown coat.
- Lath area equals the net wall area plus your waste allowance for cuts around openings and corners. It does not include the paper backing overlap or fastener counts — order those from your lath supplier's coverage chart.
- Cost is an estimate only, from the prices you enter — no prices are preset. Labour rates vary widely by region and by whether the finish is smooth or heavily textured.
- This page sizes stucco materials only. It does not check whether a wall needs paper, weep screed, control joints or a different system (one-coat over foam is a different product with different coverage), and it does not approve a structural or waterproofing design — check your local building code and ASTM C926 before you stucco.
Stucco Calculator — frequently asked questions
How many bags of stucco do I need for 100 sq ft?
12 bags for 100 sq ft of 3-coat stucco, pre-mix, 0% waste: 5 x 80-lb basecoat bags for the scratch coat (100 / 24 = 4.17, rounded up), 5 for the brown coat, and 2 x 80-lb finish bags (100 / 87.5 = 1.14, rounded up) — 5 + 5 + 2 = 12, plus 100 sq ft (9.29 m2) of lath. With 10% waste the same wall still needs 12 bags (5 + 5 + 2 on 110 sq ft), with 110 sq ft of lath.
How many bags of stucco do I need for 155 sq ft?
16 bags for 155 sq ft, pre-mix, 0% waste: 7 x 80-lb basecoat bags for the scratch coat (155 / 24 = 6.46, rounded up), 7 for the brown coat, and 2 x 80-lb finish bags (155 / 87.5 = 1.77, rounded up) — 7 + 7 + 2 = 16, plus 155 sq ft (14.40 m2) of lath. Do NOT trust a figure of 3 bags for this wall: that comes from multiplying 25 sq ft per coat by 3 coats to get 75 sq ft per bag and dividing 155 / 75 = 2.07 — it counts each bag three times.
How much stucco do I need for 1,000 sq ft?
96 bags for 1,000 sq ft, pre-mix, 0% waste: 42 x 80-lb basecoat bags per base coat (1,000 / 24 = 41.67, rounded up), so 84 basecoat bags in total, plus 12 x 80-lb finish bags (1,000 / 87.5 = 11.43, rounded up) — 84 + 12 = 96, plus 1,000 sq ft (92.90 m2) of lath. As a labelled rival cross-check only, numericcore quotes 29 basecoat bags + 2.0 tons of masonry sand + 10 finish bags for 1,000 sq ft — a combined total on a different basis, not this tool's per-coat formula. Site-mix for the same wall: 11 + 9 = 20 x 94-lb cement bags, 3.22 tons (2.92 tonnes) of sand, and 12 finish bags.
How many bags of stucco do I need for a 10 m2 wall?
12 bags for a 10 m2 wall (107.64 sq ft), pre-mix, 0% waste: 5 x 80-lb basecoat bags for the scratch coat (107.64 / 24 = 4.49, rounded up), 5 for the brown coat, and 2 x 80-lb finish bags (107.64 / 87.5 = 1.23, rounded up) — 5 + 5 + 2 = 12, plus 10 m2 (107.64 sq ft) of lath. In metric units the arithmetic is identical; only the area unit changes, since bag coverage is published per square foot.
How many 80-lb bags of stucco do I need for 100 m2?
103 bags for a 100 m2 wall (1,076.39 sq ft), pre-mix, 0% waste: 45 x 80-lb basecoat bags for the scratch coat (1,076.39 / 24 = 44.85, rounded up), 45 for the brown coat, and 13 x 80-lb finish bags (1,076.39 / 87.5 = 12.30, rounded up) — 45 + 45 + 13 = 103, plus 100 m2 of lath. With 10% waste (110 m2 ordering area, 1,184.03 sq ft): 50 + 50 + 14 = 114 bags, with 110 m2 of lath.
How much sand do I need for stucco?
3.22 tons (2.92 tonnes) of masonry sand for 1,000 sq ft of site-mix stucco at 3/8 in + 3/8 in, 0% waste: scratch at 1:3 needs 31.17 ft3 (1.56 tons) and brown at 1:4 needs 33.25 ft3 (1.66 tons) — 64.42 ft3 in total at 100 lb per ft3. For 100 sq ft the same job needs 0.32 tons (6.44 ft3). Pre-mix jobs need no separate sand order: the sand is already in the bags.
How much lath do I need for stucco?
The net wall area plus your waste allowance: 100 sq ft of wall at 10% waste needs 110 sq ft (10.22 m2) of lath; 1,000 sq ft at 10% waste needs 1,100 sq ft (102.19 m2). The waste covers cuts around openings, corners and control joints — paper backing and fasteners are ordered separately from your lath supplier's chart.
How many bags of cement do I need for site-mixed stucco?
20 x 94-lb cement bags for 1,000 sq ft of site-mix stucco at 3/8 in + 3/8 in, 0% waste: scratch at 1:3 needs 11 bags (dry 41.56 ft3 / 4 = 10.39 ft3, rounded up) and brown at 1:4 needs 9 bags (41.56 / 5 = 8.31 ft3, rounded up) — plus 3.22 tons of masonry sand and 12 finish bags. The published yield of about 110 sq ft per 94-lb bag at 3/8 in would give 10 bags per base coat; this tool's dry-factor figure runs one bag higher per coat.
How thick should each stucco coat be?
Scratch 3/8 in (about 10 mm), brown 3/8 in (about 10 mm), finish 1/8 in (about 3 mm) or less — 7/8 in (about 22 mm) in total over lath on framed walls. Over solid masonry the total can be about 1/2 in, since there is no lath to embed. In numbers for 100 sq ft, pre-mix: 3/8 in base coats need 5 bags per coat, while 1/2 in base coats need 6 bags per coat (100 / 18 = 5.56, rounded up) — thickness, not wall size, is what moves the per-bag coverage.
How long do I wait between stucco coats?
Moist-cure the scratch coat for 48 hours and the brown coat for 48 hours before the next coat goes on — 4 days of curing across the two base coats, plus the finish coat's own cure. Keep each coat damp (misting, not flooding) through its 48 hours, longer in hot or windy weather. After the finish coat, wait about 28 days before painting traditional cement stucco.
What mix ratio should I use for site-mixed stucco?
Scratch coat 1:3 (one part cement to three parts sand) and brown coat 1:4 (one part cement to four parts sand) — the richer scratch coat bonds to the lath, the leaner brown coat floats flatter for the finish. Some applicators use 1:3 for both coats; if yours does, the brown coat on 1,000 sq ft at 3/8 in needs 11 cement bags instead of 9. The finish coat is a separate pre-mixed product, not a site-mixed ratio.
Do I deduct doors and windows from stucco area?
Yes — always. Net area = gross wall area minus the total area of doors and windows, never below zero. A single door is about 21 ft2 (2 m2): on a 155 sq ft wall that is a seventh of the stucco, the lath and the labour. Enter the openings area above and the calculator deducts it before any other step.
How much does stucco cost per square metre?
Multiply bags x your price per bag + finish bags x your finish price + sand x your price per ton + lath x your lath price + net area x your labour rate — this calculator presets no prices. As an illustration with entered prices: 100 sq ft (9.29 m2) of pre-mix stucco at 10% waste, with 10 basecoat bags at $15 ($150), 2 finish bags at $18 ($36), lath 10.22 m2 at $5 per m2 ($51.10) and labour 9.29 m2 at $30 per m2 ($278.71) gives an installed total of $515.81. Enter your own prices above and the calculator totals them; textured finishes cost more per square metre than smooth ones.
Can I use one-coat stucco instead of 3-coat?
One-coat stucco over rigid foam is a different system, not a shortcut version of this page: it goes on at 3/8-1/2 in in a single fibre-reinforced pass, with a different product and different coverage per bag. This calculator sizes traditional 3-coat stucco only (scratch + brown + finish, 7/8 in over lath) — do not use its per-coat rates for a one-coat job, or the one-coat rate for a 3-coat job.
Next step
Take the per-coat bag counts, sand tonnage and lath area to the supplier and confirm the bag's data-sheet coverage matches the estimate — then follow the cure schedule above (48 hours moist-cure per base coat, about 28 days before painting) and price the paint with the paint calculator only once the cure is done.