Cubic Yard Calculator

Almost every bulk material — concrete, gravel, sand, topsoil, mulch — is sold by the cubic yard: 27 cubic feet, or 0.7646 m3, a cube roughly the size of a washing machine. The question "how many cubic yards do I need" is really two questions: what is the volume of the project, and how much extra should you order for waste and settling? This cubic yard calculator answers both. Pick your material, enter the shape — rectangular slab, square pad, round area, cylinder or post hole, or a custom volume in ft3 or m3 — add the depth in inches, and get the yards to order with a waste allowance, the weight range so you know what the truck is carrying, bag counts for concrete and mulch, and an optional cost estimate. Working in stages? Each result has an "Add this area to the project total" button that builds a running multi-area total — volume, bags and cost — across beds, pads and holes. Everything works in feet or metres throughout.

Quick answer: A 10 x 8 ft slab, 4 in deep needs 0.99 cubic yards — order 1.04 with the default 5% waste. Metric: a 3 x 2.4 m slab, 100 mm thick needs 0.72 m3 (0.94 yd3). One cubic yard is 27 cubic feet = 0.7646 m3 — a cube about the size of a washing machine.
Rectangles use Length x Width; a square pad uses the side length in the Length field; round areas and cylinders use Diameter; post holes add a Quantity; Custom skips dimensions entirely.
Rectangle length — or the side of a square pad. Not used by round, cylinder or custom shapes.
Rectangle width, in the same unit as Length above. Not used by square, round, cylinder or custom shapes.
Round areas and cylinders/post holes, in the same unit as Length above (feet or metres). Not used by other shapes.
Cylinder / post hole shape only: how many identical holes. Set to 1 for a single column or hole.
Depth in inches for slabs, beds and holes. Double-check the unit — 4 feet of concrete instead of 4 inches is a 12x over-order.
Custom shape only: enter a volume you already know in ft3 or m3.
Sets the weight range — and which bag sizes are offered, since concrete and mulch are the only materials sold in standard bags here.
5% covers spillage and uneven subgrade. Use 10–15% on over-dug holes, soft ground or fills that will settle.
Only used when Material is Concrete or Mulch — other materials are normally bought in bulk, so the bag count is hidden for them.
Your supplier's delivered price per cubic yard, in dollars — leave blank to skip the cost estimate.
Your store price for the bag size above, in dollars — leave blank to skip the cost estimate.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Cubic Yard Calculator

  1. Pick the material first — it sets the weight range and which bag sizes are offered (concrete and mulch are the only materials with standard bag sizes here).
  2. Choose the shape and fill in only its fields: rectangles use Length x Width, a square pad uses the side length in the Length field, round areas and cylinders use Diameter, post holes add a Quantity, and Custom takes a volume in ft3 or m3 directly.
  3. Enter the depth in inches (or centimetres) — the most common mistake on any cubic yard calculator is entering 4 when you mean 4 inches versus 4 feet, so glance at the unit selector.
  4. Leave the waste allowance at 5%, or raise it to 10–15% on uneven ground, over-dug trenches or deep fills that will settle.
  5. Read the yards to order first, then the bag count (concrete/mulch), the weight range for delivery planning, and the cost if you entered prices.
  6. For multi-area projects — several beds, pads or holes — click "Add this area to the project total" under each result to build a running total with a grand-total row for volume, bags and cost.

Cubic Yard Calculator formula

Rectangular slab: length x width x depth. Square pad: side x side x depth. Round area: pi x (diameter / 2)^2 x depth. Cylinder / post hole: pi x (diameter / 2)^2 x depth x quantity. Cubic yards = cubic feet / 27; cubic metres = cubic yards x 0.764555. Order amount = volume x (1 + waste % / 100). Concrete bags = ft3 / bag yield (80 lb -> 0.60 ft3, 60 lb -> 0.45, 40 lb -> 0.30, 50 lb -> 0.375 — QUIKRETE Concrete Mix No. 1101), rounded up. Mulch bags = ft3 / bag size (2 ft3 or 1.5 ft3), rounded up. Weight range = yards x the material's published per-yard range. Example: 10 x 8 ft x 4 in = 10 x 8 x 0.333 ft = 26.67 ft3 / 27 = 0.99 yd3; x 1.05 = 1.04 yd3 to order.

Worked example

A 10 x 8 ft concrete slab, 4 in thick, 5% waste. Step one — depth to feet: 4 in = 0.333 ft. Step two — volume: 10 x 8 x 0.333 = 26.67 ft3. Step three — yards: 26.67 / 27 = 0.99 yd3. Step four — waste: 0.99 x 1.05 = 1.04 yd3 to order. Step five — bags: 26.67 x 1.05 = 28.0 ft3 / 0.60 = 46.7 = 47 x 80 lb bags. Step six — weight: 1.04 x 3,600–4,050 = 3,730–4,200 lb (moisture moves this number).

Metric version: a 3 x 2.4 m slab, 100 mm thick, 5% waste. Volume = 3 x 2.4 x 0.1 = 0.72 m3; yards = 0.72 / 0.764555 = 0.94 yd3; x 1.05 = 0.99 yd3 to order.

Coverage reference — area covered by 1 cubic yard at each depth (area = 27 / depth in feet):

Depth1 yd3 covers
1 in324 ft2
2 in162 ft2
3 in108 ft2
4 in81 ft2
6 in54 ft2
8 in40.5 ft2
12 in27 ft2
Metric: 1 m3 covers 40 m2 at 25 mm, 20 m2 at 50 mm, 10 m2 at 100 mm and 6.67 m2 at 150 mm (m2 = 1 / depth in metres).

Pickup payload warning — how much of a yard your truck can actually carry A cubic yard is a volume, not a weight, and the weight is what overloads a pickup. Payload ratings are for a properly equipped truck and include everything in it — driver, passengers, fuel and gear — so plan on a conservative 1,500 lb of material for a typical crew-cab 4x4 half-ton (a 2025 Ford F-150 tops out at 2,440 lb of payload in its lightest regular-cab 4x2 configuration; most crew-cab 4x4 versions rate roughly 1,400–1,800 lb — check the yellow Tire and Loading label on your door jamb, not the brochure maximum). Safe load = 1,500 lb / weight per yard, using the high end of each range so wet material cannot push you over:
Material1 yd3 weighsSafe pickup load at 1,500 lb payload
Mulch400–800 lbAbout 2 yd3 (bed volume usually fills first)
Topsoil (dry)1,800–2,200 lbAbout 0.75 yd3 — three-quarters of a yard
Gravel2,300–2,900 lbAbout 0.5 yd3 — half a yard, not a full yard
Sand (dry)2,600–3,000 lbAbout 0.5 yd3 — half a yard, not a full yard
Concrete3,600–4,050 lbAbout 0.4 yd3 — never a full yard in a pickup
The rule of thumb: half a yard is the pickup limit for gravel and sand; a full yard of either overloads most half-tons, and a full yard of concrete overloads even most three-quarter-tons. Wet material weighs more than the dry ranges above, so a load that was legal dry can be over the limit after rain. Above about 1 yd3, get bulk delivery or ready-mix — it is cheaper than a broken spring, a ticket, or a load dumped on the roadside. A trailer does not fix this for free: it has its own gross vehicle weight rating, and the trailer tongue weight still counts against the truck payload.

Supplier checklist — have this ready when you call or order
- Your total in cubic yards: the "to order" number with waste, not the exact volume.
- The exact material name: "3/4 in crushed stone" beats "gravel" — screens and sizes vary.
- Delivery date, address, and whether the truck can reach the spot: a loaded mixer needs about 10 ft of width and solid ground.
- Ask about short-load fees (under about 1 yd3) and delivery/placement charges — they are often separate line items.
- For weighed materials, ask their tons-per-yard figure: the scale ticket is what you actually pay on.
- The delivery window and who is on site to direct the driver.

Measurement tips

  • Order ready-mix above about a cubic yard. 47 x 80 lb bags is a full day of brutal mixing — a mixer truck delivers 1.04 yd3 in minutes, and the price per yard is usually lower.
  • Call with your "to order" number, not the exact volume. Dispatchers think in yards; rounding 1.04 down to "about a yard" quietly drops the waste margin.
  • Ask about the short-load fee before ordering under a yard. Many plants charge extra below 1–2 yd3 — sometimes bags are genuinely cheaper for half a yard.
  • Check truck access before delivery day. A loaded mixer is heavy; soft ground, low wires and tight gates are the usual delivery-day failures.
  • For fills and topsoil, expect settling: loose material compacts 10–20% in the first season. The 10–15% waste option exists for exactly this — raised beds need topping up next spring.
  • Keep the scale ticket or delivery slip. If the pile looks short, the ticket (yards or tons) is your evidence — eyeballing a pile is how shortages go unnoticed.
  • Separate your piles by material on delivery. A gravel pile that drifts into the topsoil pile ruins both — a tarp or a plywood divider costs almost nothing.
  • Ordering for a pool project? Convert cubic yards to gallons for a pool before you order — the yardage to buy should match the water the pool actually holds, in gallons or litres.

Common mistakes

  • Entering depth in the wrong unit. 4 feet of concrete instead of 4 inches is a 12x over-order — always glance at the unit next to the depth field.
  • Confusing cubic feet with cubic yards. A yard is 27 ft3: ordering "27" when you need 27 ft3 buys a small mountain.
  • Skipping the waste allowance on dug holes. An over-dug post hole or an uneven trench bottom quietly adds 10–20% — that is what the allowance models.
  • Using one density number for weight. Published figures are ranges (gravel 2,300–2,900 lb/yd3) because moisture and compaction move them — never plan a trailer load on the low end.
  • Buying bags past the bulk crossover. Above about 1 yd3 of concrete or 3 yd3 of mulch, bulk or ready-mix is usually cheaper per yard than bags.
  • Measuring the gross area for a curvy bed. Measure the widest rectangle and accept the slight over-order — or split the curve into two rectangles and add both to the project total.
  • Forgetting the truck in the plan. A yard of gravel weighs well over a ton — your car trunk is not the delivery vehicle.

Factors that affect accuracy

  • Depth accuracy: a half-inch error on a 4 in slab is 12.5% — the single biggest lever on the total.
  • Subgrade unevenness: dips and soft spots drink extra material; the waste allowance absorbs it.
  • Compaction and settling: loose fills compact under their own weight — use 10–15% waste for deep fills.
  • Moisture: wet material weighs far more than dry (see the weight ranges) — it does not change the volume you need, but it changes the truck you need and the price on a scale ticket.
  • Bag yield variance: QUIKRETE's 0.60 ft3 per 80 lb bag is the published figure; other brands differ slightly — check your bag.
  • Shape approximations: round and cylinder modes assume perfect circles; real holes bell out at the bottom — a little extra is cheap insurance.
  • Material choice: the same volume of mulch weighs roughly one-tenth of concrete — the weight ranges exist so delivery and trailer planning use the right number.

Sources & assumptions

  • Volume math: 1 yd³ = 27 ft³ exactly; 1 yd³ = 0.764555 m³. Order amount = exact volume × (1 + waste % / 100). Coverage check: 1 yd³ covers 81 ft² at 4 in (27 ÷ 0.333 ft) — the table on the page uses area = 27 ÷ depth in feet.
  • Concrete bag yields: QUIKRETE Concrete Mix No. 1101 technical data sheet — 80 lb → 0.60 ft³ (45 bags/yd³), 60 lb → 0.45 ft³ (60/yd³), 40 lb → 0.30 ft³ (90/yd³), 50 lb → 0.375 ft³ (72/yd³). Bag counts are rounded up.
  • Weight ranges per cubic yard: thecalculatorsite.com — Cubic Yards Calculator — Mulch 400–800 lb, Topsoil (dry) 1,800–2,200 lb, Gravel 2,300–2,900 lb, Sand (dry) 2,600–3,000 lb, Concrete 3,600–4,050 lb; cross-confirmed by CoolConversion (citing ASTM C29/ACI 211.1). Crushed stone uses the gravel aggregate range; general fill uses the soil (topsoil) range. Presented as ranges with a moisture caveat — never single numbers.
  • Mulch bag math is arithmetic: 2 ft³ bags → 13.5 bags/yd³ (27 ÷ 2); 1.5 ft³ bags → 18 bags/yd³ (27 ÷ 1.5). Bag counts are rounded up.
  • Cost, when shown, uses only the price per cubic yard and price per bag you enter — no prices are preset. Multi-area totals are simple sums of the saved areas' ordered volumes, bag counts and costs.
  • Pickup payload figures: Ford's published 2025 F-150 specifications (maximum payload 2,440 lb, 3.5L EcoBoost regular cab 8-ft box 4x2; crew-cab 4x4 configurations roughly 1,400–1,800 lb across engines) — the page plans on a conservative 1,500 lb and tells readers to use their own door-jamb Tire and Loading label, since payload includes passengers, fuel and gear. Safe-load arithmetic: 1,500 ÷ high-end weight per yard — mulch 1,500/800 = 1.9 yd³, topsoil 1,500/2,200 = 0.68, gravel 1,500/2,900 = 0.52, sand 1,500/3,000 = 0.50, concrete 1,500/4,050 = 0.37 — rounded to the stated table values.

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • Weight ranges are estimates from published per-yard densities — they are not your supplier's scale ticket. Moisture and compaction move the real number, so never plan a trailer load on the low end of the range.
  • Bag yields are the manufacturers' published figures (QUIKRETE Concrete Mix No. 1101: 80 lb → 0.60 ft3, 60 lb → 0.45 ft3, 40 lb → 0.30 ft3, 50 lb → 0.375 ft3). A different brand may yield slightly more or less — check the bag.
  • The waste allowance covers spillage, over-digging and uneven ground. It does not model long-term settling or compaction — loose fills settle 10–20% in the first season, so use 10–15% on deep fills.
  • Round and cylinder modes assume perfect circles. Real post holes bell out at the bottom, so they take a little more than the math says — a small extra allowance is cheap insurance.
  • Crushed stone uses the gravel aggregate weight range and general fill uses the soil (topsoil) range, as stated in Sources — these are planning ranges, not lab densities.
  • Cost is an estimate only, from the price per cubic yard and price per bag you enter — no prices are preset.

Cubic Yard Calculator — frequently asked questions

How many cubic yards of concrete do I need for a 10x10 slab, 4 inches thick?

1.24 cubic yards — 10 x 10 ft x 4 in = 100 sq ft x 0.333 ft = 33.33 ft3 / 27 = 1.23 yd3; order 1.30 with 5% waste. That is 56 x 80 lb bags (33.33 x 1.05 / 0.60 = 58.3, rounded up), so ready-mix delivery usually wins at this size.

How many cubic yards of gravel do I need for a driveway?

2.22 cubic yards for a 12 x 20 ft driveway at 3 in deep — 240 sq ft x 0.25 ft = 60 ft3 / 27 = 2.22; order 2.33 with 5% waste. Weight: 2.33 x 2,300–2,900 lb = 5,370–6,770 lb (about 2.7–3.4 tons) — one full-size pickup load at most, so plan delivery.

How many cubic yards of mulch do I need for a garden bed?

0.37 cubic yards for a 10 x 4 ft bed at 3 in deep — 40 sq ft x 0.25 ft = 10 ft3 / 27 = 0.37; order 0.39 with 5% waste, which is 6 x 2 ft3 bags (10 x 1.05 / 2 = 5.25, rounded up). For beds, the coverage table helps: 1 yd3 of mulch covers 108 ft2 at 3 in.

How many cubic yards are in a 10x10 area?

It depends on depth: a 10 x 10 ft area is 1.23 yd3 at 4 in deep, 1.85 yd3 at 6 in, and 3.70 yd3 at 12 in (100 sq ft x depth in feet / 27). Multiply the area by the depth in feet and divide by 27 for any depth.

How many cubic yards of topsoil do I need for a 4x8 raised bed?

1.19 cubic yards for a 4 x 8 ft bed at 12 in deep — 32 sq ft x 1 ft = 32 ft3 / 27 = 1.19; order 1.25–1.37 with a 5–15% settling allowance, since new raised beds settle 10–20% in the first season.

How much does a cubic yard of gravel weigh?

2,300–2,900 lb (1.04–1.32 tonnes) — a range, not one number, because moisture and compaction move it. Wet gravel sits at the high end; never plan a trailer load on the low end.

Can I haul a cubic yard of gravel in my pickup truck?

Usually no — a full yard of gravel weighs 2,300–2,900 lb, which exceeds the payload of most half-ton pickups (a typical crew-cab 4x4 half-ton carries roughly 1,400–1,800 lb of payload; even a 2025 Ford F-150 tops out at 2,440 lb in its lightest configuration). Half a yard of gravel or sand, about 1,150–1,500 lb, is the safe pickup limit. For a full yard or more, get bulk delivery. Check your door-jamb Tire and Loading label — it is the rating for your exact truck, and it includes passengers, fuel and gear.

How many cubic yards is a 3x3 m slab at 100 mm?

1.18 cubic yards — 3 x 3 m x 0.1 m = 0.9 m3; 0.9 / 0.764555 = 1.18 yd3; order 1.24 with 5% waste. In metric terms that is 0.94 m3 to order.

How many 80 lb bags of concrete are in a cubic yard?

45 bags — one cubic yard is 27 ft3 and an 80 lb bag yields 0.60 ft3 (27 / 0.60 = 45). With 5% waste, buy 48 (28.35 / 0.60 = 47.25, rounded up). By bag size: 60 lb = 60 bags, 40 lb = 90 bags, 50 lb = 72 bags per yard.

How many cubic yards of concrete do I need for a post hole?

0.09 cubic yards for a 12 in diameter, 3 ft deep hole — pi x 0.5^2 x 3 = 2.36 ft3 / 27 = 0.087; that is 4 x 80 lb bags (2.36 / 0.60 = 3.93, rounded up). Enter the diameter, depth and hole count in the cylinder shape above — real holes bell out at the bottom, so keep the waste allowance on.

How many cubic yards of sand do I need per square metre?

0.065 cubic yards per m2 at 50 mm deep — 1 m2 x 0.05 m = 0.05 m3; 0.05 / 0.764555 = 0.065 yd3. A 10 m2 patio base at 50 mm needs 0.65 yd3 — order 0.69 with 5% waste. Weight: 0.69 x 2,600–3,000 lb = 1,790–2,060 lb of dry sand.

Next step

Take the cubic-yard total to the supplier — ask for their delivered per-yard price and their short-load fee, since both change the real cost. If the bag count is under about 45 × 80 lb bags, price bags and bulk side by side before you commit.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.