Gravel Calculator
Gravel is sold by the cubic yard at the landscape yard, by the ton on the delivery ticket, and by the bag at the garden center — three different units for the same pile of rock, and mixing them up is how driveways end up short. The math itself is simple: area times depth gives volume, volume times density gives weight. The hard part is knowing your gravel type (crushed stone, pea gravel and crusher run all weigh different amounts per yard) and adding enough for compaction, because loose gravel settles 10–15% under tires and rain. This gravel calculator handles rectangles, circles and trenches — driveways, patios, paths and French drains — in metric or imperial, and turns the result into cubic yards, tons, bag counts and a cost estimate in one pass.
- A 10×20 ft driveway 4 in deep in crushed stone is 2.47 cubic yards net — 2.72 yards and 3.67 tons with the 10% compaction allowance.
- One cubic yard of gravel covers about 100 sq ft at 3 in deep and weighs roughly 1.3–1.5 tons.
- A 3×6 m path 10 cm deep in crusher run needs 3.96 tonnes — 159 × 25-kg bags.
- A 30 ft French drain trench, 1 ft wide and 18 in deep, needs about 1.7 cubic yards — roughly 2.5 tons of river rock.
Planning this project? Save to Pinterest to find this calculator again later.
How to use the Gravel Calculator
- Pick the shape first — rectangle for driveways and patios, circle for rings and surrounds, trench for French drains and edging.
- Measure length and width in feet or metres. For a circle, measure straight across — that diameter goes in the length box and width is ignored.
- Enter the gravel depth in inches or centimetres. Driveways want 4 in (10 cm) of compacted stone; paths and patios 2–3 in; check your local guidance for heavy vehicles.
- Choose your gravel type. Crushed stone is the all-rounder for driveways; crusher run packs into a near-solid base; pea gravel and river rock are for looks and drainage, not driving on.
- Read the bulk volume (cubic yards / cubic metres) and the weight (tons / tonnes). Yards sell by the yard; delivery tickets and dump trailers work in tons — you now have both.
- Use the bag count to decide bulk vs bags: under about a cubic yard (roughly 50 bags of 0.5 cu ft), garden-center bags are fine; above that, a landscape yard delivers far cheaper.
- Add your price per ton for a cost estimate, then order the rounded-up total. Confirm the density with your supplier when you call — their scale beats any website.
Gravel Calculator formula
Worked example
A 10×20 ft gravel driveway, 4 in deep, crushed stone, 10% for compaction. Step one — area: 10 × 20 = 200 sq ft. Step two — volume: 200 × (4 ÷ 12) = 66.67 ft³, which is 66.67 ÷ 27 = 2.47 cubic yards (1.89 m³). Step three — weight: 1.89 m³ × 1,600 kg/m³ = 3,023 kg (3.33 US tons). Step four — waste: 3,023 × 1.10 = 3,326 kg, or 3.67 US tons to order, which is 2.72 yd³. Step five — bags: 73.33 ft³ ÷ 0.5 = 147 bags of 0.5 cu ft. At 147 bags, bulk wins by a landslide: even at $55/ton delivered, 3.67 tons is about $202, while 147 bags at $5 each is $735.
Metric version: a 3×6 m path, 10 cm deep, crusher run, 10% waste. Volume = 18 × 0.10 = 1.8 m³. Weight = 1.8 × 2,000 = 3,600 kg; +10% = 3,960 kg (3.96 tonnes, 2.59 yd³). 25-kg bags = 3,960 ÷ 25 = 158.4 → 159 bags — again, a bulk delivery is the sane choice.
French drain version: a 30 ft trench, 1 ft wide, 18 in deep of river rock, 10% waste. Volume = 30 × 1 × 1.5 = 45 ft³ = 1.67 yd³. Weight = 1.27 m³ × 1,650 = 2,097 kg; +10% = 2,307 kg (2.54 tons).
Density by gravel type — the presets this calculator uses (cross-checked against Engineering ToolBox material densities).
| Gravel type | Density | Weight per cubic yard | Weight per cubic metre |
|---|---|---|---|
| Crushed stone | 1,600 kg/m³ | 2,697 lb (1.35 US tons) | 1,600 kg (1.60 tonnes) |
| Crusher run | 2,000 kg/m³ | 3,371 lb (1.69 US tons) | 2,000 kg (2.00 tonnes) |
| Pea gravel | 1,700 kg/m³ | 2,866 lb (1.43 US tons) | 1,700 kg (1.70 tonnes) |
| River rock | 1,650 kg/m³ | 2,782 lb (1.39 US tons) | 1,650 kg (1.65 tonnes) |
| Decomposed granite | 1,500 kg/m³ | 2,529 lb (1.26 US tons) | 1,500 kg (1.50 tonnes) |
Coverage by depth — finished area per unit of gravel, before any waste or compaction allowance.
| Depth | Per cubic yard | Per cubic metre | Per US ton of crushed stone |
|---|---|---|---|
| 1 in (25 mm) | 324 sq ft | 40 m² | 241 sq ft |
| 2 in (50 mm) | 162 sq ft | 20 m² | 120 sq ft |
| 3 in (75 mm) | 108 sq ft | 13.3 m² | 80 sq ft |
| 4 in (100 mm) | 81 sq ft | 10 m² | 60 sq ft |
| 6 in (150 mm) | 54 sq ft | 6.7 m² | 40 sq ft |
| 8 in (200 mm) | 41 sq ft | 5 m² | 30 sq ft |
| 12 in (300 mm) | 27 sq ft | 3.3 m² | 20 sq ft |
Coverage per US ton by stone type — finished area before any waste or compaction allowance. The ton buys less volume as the stone gets heavier, so coverage falls as density rises.
| Stone type (density) | 2 in deep | 3 in deep | 4 in deep | 6 in deep |
|---|---|---|---|---|
| Crushed stone, this calculator's preset (1,600 kg/m³ = 1.35 tons/yd³) | 120 sq ft | 80 sq ft | 60 sq ft | 40 sq ft |
| Crushed stone, heavy quarry stone (1.50 tons/yd³) | 108 sq ft | 72 sq ft | 54 sq ft | 36 sq ft |
| River rock, this calculator's preset (1,650 kg/m³ = 1.39 tons/yd³) | 116 sq ft | 77 sq ft | 58 sq ft | 39 sq ft |
| Lava rock, light volcanic stone (~0.90 tons/yd³; not a calculator preset) | 180 sq ft | 120 sq ft | 90 sq ft | 60 sq ft |
Shed base version: a 10×12 ft pad for an 8×10 ft shed — the pad is the shed footprint plus 1 ft on every side, so the stone carries the walls and sheds rain past them. At 4 in deep in #57 / 3/4 in crushed stone (angular stone locks together; rounded pea gravel rolls and never compacts under a building): volume = 120 × (4 ÷ 12) = 40 ft³ = 1.48 yd³ (1.13 m³), and at this calculator’s crushed-stone preset (1,600 kg/m³ = 1.35 tons/yd³) that is about 2.0 US tons net. A compacted base settles more than a loose path, so order with 15–20% extra here instead of the usual 10%: 1.7–1.8 yd³, about 2.3–2.4 tons. For a heavier shed or soft ground, go 6 in deep: 2.22 yd³ net, about 3.0 tons before the allowance. In metric, the same pad is 3.05 × 3.66 m at 100 mm deep = 1.12 m³, about 1.79 tonnes of crushed stone. Enter the pad size — not the shed size — in the calculator above.
Measurement tips
- Order bulk for anything over about a cubic yard. Bagged gravel typically costs 3–5× more per ton — the bags are paying for packaging and shelf space, not stone.
- Put landscape fabric under paths and patios, not driveways. Fabric stops weeds in beds; under a driveway it can trap water and make the base spongy — compacted crusher run alone is better there.
- Compact in lifts. For driveways, spread crusher run in 3–4 in layers and compact each with a plate compactor — dumping 8 in at once leaves soft spots that rut under tires.
- Crown the driveway slightly. A 2% crown (about 1/4 in per foot) sheds water to the edges; a flat gravel driveway becomes a pond, then a pothole collection.
- Edge it. Steel, stone or timber edging keeps gravel from migrating into the lawn — unedged paths lose an inch of width per year to creep.
- Confirm density with your supplier. Quarries quote 1.3–1.5 tons per yard for crushed stone; if their number differs from the calculator, their scale wins — adjust the order, not the argument.
- For French drains, use washed rock with no fines. Crusher run's fines clog the system; 3/4 in washed river rock or crushed stone lets water through for decades.
Common mistakes
- Skipping the compaction allowance. Loose gravel settles 10–15% under traffic — a driveway calculated with zero waste is an inch low within a season.
- Driving on pea gravel. Pea gravel rolls under tires and migrates; it is a path and bed material — size it with the pea gravel calculator. Driveways want angular crushed stone or crusher run that locks together.
- Using crusher run in a French drain. The fines that make crusher run pack so well are exactly what clog a drain — use washed stone with no fines there.
- Eyeballing depth. "About four inches" estimated by eye is how 2.5-yard jobs become 4-yard jobs — the tape measure is the cheapest tool on site.
- Forgetting the subgrade. Gravel on soft mud needs 15–20% extra (the first inch sinks) plus proper excavation — the calculator sizes the stone, not the groundwork.
- Buying bags for a bulk job. 147 bags for a driveway sounds fine until you load them — one bulk delivery costs less and saves your back and your Saturday.
- No edging. Gravel migrates — without edging, a neat 10-ft path is a 12-ft gravel smear within two years.
Factors that affect accuracy
- Depth: the biggest lever, and it is linear — double the depth, double the gravel. Most errors come from depth, not area.
- Gravel type: crusher run (2,000 kg/m³) vs decomposed granite (1,500 kg/m³) is a 33% weight swing on the same volume — pick the right preset.
- Compaction: loose-dumped vs mechanically compacted differ by 10–20%. Driveways and anything driven on need the higher figure.
- Subgrade: soft or muddy ground swallows the first inch — add 15–20% waste instead of 10% on poor soil.
- Moisture: wet stone weighs more per shovel. Volume stays roughly the same, but the scale ticket runs heavy after rain.
- Shape: rectangles and trenches are exact; circles use the diameter; irregular beds need the split-into-rectangles method or a 10–15% shape allowance.
- Delivery: most yards sell by the cubic yard with a 1-yard minimum plus a delivery fee — a half-yard job can cost nearly as much delivered as a full yard — see the gravel cost guide for delivered prices by type.
Sources & assumptions
- Volume = length × width × depth (rectangles and trenches); circles use π × (diameter ÷ 2)² × depth.
- Weight at preset densities: crushed stone 1,600, crusher run 2,000, pea gravel 1,700, river rock 1,650, decomposed granite 1,500 kg/m³.
- 10% default covers compaction and spillage; use 15–20% on soft ground or for depths over 6 in (15 cm).
- Density cross-check: Engineering ToolBox — densities of common materials (gravel and crushed-stone tables).
- Density and coverage tables in the worked example (added 2026-10-29) are arithmetic from the presets above: weight per cubic yard = density × 0.7646 m³ per yd³; coverage = volume ÷ depth (1 yd³ = 27 ft³; per-ton coverage uses crushed stone at 1,600 kg/m³, so 1 US ton = 0.567 m³ ≈ 20.0 ft³).
- Coverage per ton by stone type (added 2026-10-30) is the same arithmetic at each type's density — 2,000 lb ÷ density ÷ depth — cross-checked against published coverage tables (OnsiteCalculator, GravelCalculations, Eartheasy, Ergeon and SubcontractorHub agree on about 116 / 77 / 58 / 39 sq ft per ton at 2 / 3 / 4 / 6 in for stone near 1.4 tons per yard, which matches the river-rock row). Bag-vs-bulk crossover corrected 2026-10-30: bulk wins past about 1 cubic yard (≈50 bags of 0.5 cu ft), not ~25 bags — bulk runs 3–5× cheaper per ton than garden-center bags.
Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.
How this calculator was checked
Figures checked 18 November 2026. Each case below was recomputed from the calculator's own formula and matched the tool's output.
| Test inputs | Expected result |
|---|---|
| 10×20 ft driveway, 4 in deep, crushed stone (1,600 kg/m³), 10% waste | ≈ 2.72 yd³, ≈ 3.66 tons (3.32 tonnes), 147 × 0.5 ft³ bags |
| Metric path, 3×6 m, 10 cm deep, crusher run (2,000 kg/m³), 10% waste | 3.96 tonnes, ≈ 2.59 yd³, 159 × 25-kg bags |
| Circle, 6 ft diameter, 3 in deep, pea gravel (1,700 kg/m³), 10% waste | ≈ 0.29 yd³ |
| Trench, 30×1 ft, 18 in deep, river rock (1,650 kg/m³), 10% waste | ≈ 2.55 tons, ≈ 1.83 yd³ |
What this check does not cover
- Tonnage cases use the named presets — crushed stone 1,600 kg/m³, crusher run 2,000, pea gravel 1,700, river rock 1,650.
- The circle case takes the diameter as the length; the width field is ignored for circles.
- The 147-bag case divides by 0.5 ft³ per bag; the metric case divides by 25 kg per bag.
What this calculator doesn't do
- Gravel density is a preset, not a measurement. Crushed stone at 1,600 kg/m³ is a typical dry value — your supplier's stockpile may run 1,500–1,700 depending on stone type and moisture. The scale ticket at the yard is the final word.
- The 10% default covers compaction and spillage. Fresh gravel settles 10–15% under traffic and rain; on soft or muddy subgrade, use 15–20% because the first inch disappears into the ground.
- It doesn't design your driveway. Base thickness depends on soil, drainage and vehicle weight — this calculator sizes the material once you know the depth, it doesn't pick the depth for a heavy truck on clay.
- Bag estimates assume standard 0.5 cu ft (14 L) garden-center bags. Bulk bags, super sacks and 25-kg bags vary — the bag counts are a buying guide, not a guarantee.
- Cost is an estimate only. Gravel prices swing with haul distance, quarry fees and season — always get a delivered quote from a local yard before budgeting.
Gravel Calculator — frequently asked questions
How much gravel do I need?
Multiply length × width × depth (in feet, with depth in feet too), then divide by 27 for cubic yards. A 10×20 ft driveway 4 in deep is 66.67 ft³ ÷ 27 ≈ 2.47 cubic yards — add 10% for compaction, so order about 2.7 yards. The calculator above does it in any units and converts to tons and bags.
How do I convert cubic yards of gravel to tons?
Multiply cubic yards by the density: roughly 1.35 tons per yard for crushed stone, 1.5 for pea gravel, 1.7 for crusher run. So 3 cubic yards of crushed stone ≈ 4 tons. The exact factor varies by stone type and moisture — your supplier's scale ticket is the final word.
How many tons of gravel do I need for a driveway?
A standard 2-car driveway (about 10×20 ft) at 4 in deep needs roughly 3.5–4 tons of crushed stone with 10% compaction allowance. Longer driveways scale linearly: a 10×50 ft driveway needs about 9 tons. Use the calculator with your exact dimensions.
Should I use pea gravel or crushed stone for my driveway?
Crushed stone — always, for driveways. Its angular edges lock together under tires. Pea gravel is rounded, so it rolls, ruts and migrates under vehicles; save it for paths, beds and decorative areas where nobody drives.
How deep should gravel be for a driveway?
4 inches (10 cm) of compacted gravel over a prepared subgrade is the standard for passenger vehicles. Go 6–8 in for heavy trucks or soft soil, and compact in 3–4 in lifts. Paths and patios only need 2–3 in.
How much area does one ton of gravel cover?
It depends on the stone's density, because a ton of heavy stone is less volume than a ton of light stone. One ton of crushed stone at this calculator's preset (1,600 kg/m³ = 1.35 tons per yard, so one ton ≈ 0.74 yd³) covers about 120 sq ft at 2 in deep, 80 sq ft at 3 in, 60 sq ft at 4 in, or 40 sq ft at 6 in. Heavier quarry stone (1.50 tons per yard) covers less: 108 / 72 / 54 / 36 sq ft at the same four depths. River rock (1,650 kg/m³) sits between them at about 116 / 77 / 58 / 39 sq ft, while light lava rock (~0.90 tons per yard) stretches to 180 / 120 / 90 / 60 sq ft. Coverage halves as depth doubles — it is pure volume math, before any waste allowance.
How much gravel do I need for a French drain?
Multiply trench length × width × depth, then use washed 3/4 in stone (no fines — crusher run clogs drains). A 30 ft trench 1 ft wide and 18 in deep needs about 1.7 cubic yards, roughly 2.5 tons of river rock. The calculator's trench mode does this directly.
How much does gravel cost per ton?
Crushed stone typically runs $35–$75 per ton delivered, depending on haul distance and region; decorative stone costs more. Bulk is 3–5× cheaper per ton than garden-center bags. Enter your yard's price in the calculator for an exact estimate.
How much gravel do I need for a shed base?
Build the pad 1 ft larger than the shed on every side and 4–6 in deep, in #57 or 3/4 in crushed stone — angular stone that compacts and locks, never rounded pea gravel. An 8×10 ft shed sits on a 10×12 ft pad: at 4 in deep that is 40 ft³ = 1.48 yd³, about 2.0 tons of crushed stone net, and a compacted base wants 15–20% extra on top, so order about 2.3–2.4 tons. At 6 in deep the same pad is 2.22 yd³, about 3.0 tons net. Enter the pad dimensions — not the shed dimensions — in the calculator above.
Next step
Take the cubic-yard and ton totals to the landscape yard for a delivered bulk quote — and confirm their stone density against the calculator's preset, because the scale ticket is what you actually pay on.
Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.