Post Hole Calculator
A post hole estimate is really three numbers: how many posts, how deep each hole goes, and how much concrete fills what is left after the post and the gravel base are in. The counting part trips people up first: a fence run needs one more post than it has intervals, because both ends need a post. The depth part follows the 1/3 rule — bury at least one third of the fence height above ground, never less than 24 in — unless the local frost line is deeper, in which case the frost line wins. The concrete part is a cylinder with two subtractions: the post itself displaces concrete, and the gravel drainage base at the bottom displaces more. Skip either subtraction and you overbuy by roughly a third. This post hole calculator runs both jobs on one page: Mode 1 plans a whole fence run (length, spacing and fence height in feet or metres), and Mode 2 sizes a single hole (diameter, depth, post shape, gravel base) so deck posts, mailbox posts and gate posts use the same honest math. Every bag figure states its hole diameter, because a bag count without a hole size is meaningless.
Hole volume calculator — concrete per post hole
Just need one hole sized? Enter the hole diameter and depth, the post shape and the gravel base — this hole volume calculator subtracts the post and the gravel before it counts a single bag, and always labels the bag figure with its hole diameter.
Formula
Worked example
A 12-in hole, 36 in deep, 4x4 post, 4-in gravel base, one hole, no waste. Step one — gross hole: pi x 6 squared x 36 = 4,071.5 in3 = 2.356 ft3. Step two — post: 3.5 x 3.5 x (36 - 4) = 392 in3 = 0.227 ft3. Step three — gravel: pi x 6 squared x 4 = 452.4 in3 = 0.262 ft3. Step four — concrete: 2.356 - 0.227 - 0.262 = 1.867 ft3. Bags: 1.867 / 0.375 = 4.98, so buy 5 x 50-lb bags; 1.867 / 0.60 = 3.11, so buy 4 x 80-lb bags.
Planning this project? Save to Pinterest to find this calculator again later.
How to use the Post Hole Calculator
- Measure the fence run in feet or metres and enter it with your post spacing — 8 ft on centre is standard, 6 ft for high wind or heavy panels. The calculator counts intervals (length / spacing, rounded up) plus one end post, plus your extras for corners and gates.
- Enter the fence height above ground, not the post length. The hole depth is one third of that height, never less than 24 in — and if your frost line is deeper, enter it and the hole goes to the frost line instead.
- Pick the post size. The hole diameter follows the 3-times rule automatically: 12 in for a 4x4 post, 18 in for a 6x6. The concrete math uses the actual (planed) post size — 3.5 x 3.5 in for a 4x4 — because that is what really displaces concrete.
- Read the concrete per hole first, then the run total. The gravel base (4 in in Mode 1) and the post are already subtracted, so the bag count is the concrete you actually pour, not the gross hole volume.
- Enter your per-bag, per-post and per-post labour prices for an installed-cost estimate — useful for comparing DIY against a fence contractor quote.
- For a single hole of a different size — a deck post, a mailbox post, a gate post — scroll to the hole volume calculator below and enter that hole directly.
Post Hole Calculator formula
Worked example
A 100 ft fence run, posts every 8 ft, 6-ft fence, 4x4 posts, no frost line, no extra posts, 10% waste. Step one — intervals: 100 / 8 = 12.5, rounded up = 13 intervals. Step two — posts: 13 + 1 end post = 14 posts. Step three — hole depth: max(6 ft / 3 = 24 in, 24-in minimum) = 24 in. Step four — post length to buy: 6 ft + 24 in = 8 ft posts (the classic 6-ft fence / 8-ft post pairing). Step five — hole diameter: 3 x 4 in = 12 in. Step six — concrete per hole: (24 - 4-in gravel) x (pi x 6 squared - 3.5 squared) = 20 x 100.85 in2 = 2,016.9 in3 = 1.167 ft3. Step seven — run total: 14 x 1.167 = 16.34 ft3 (0.61 yd3); with 10% waste = 17.98 ft3. Step eight — bags: 17.98 / 0.375 = 47.94, rounded up = 48 x 50-lb bags; 40 x 60-lb bags; 30 x 80-lb bags.
Why some calculators say 13 posts for this run: they let the last bay run short, putting posts at 0, 8, ..., 96 ft and calling the last 4 ft a bay. This calculator keeps every bay at or under the spacing, so the same run needs 14 posts — and its bag range differs the same way: other sources quote 32-39 x 50-lb bags for this run because they use a 10-in hole, skip the gravel subtraction, or round per hole. Always compare bag counts with the hole diameter stated.
Fence height to hole depth, post length and hole diameter (4x4 posts, 3-times rule, no frost):
| Fence height | Hole depth (1/3 rule, 24-in min) | Post to buy | Hole diameter |
|---|---|---|---|
| 3 ft | 24 in (minimum governs) | 5 ft | 12 in |
| 4 ft | 24 in (minimum governs) | 6 ft | 12 in |
| 5 ft | 24 in (minimum governs) | 7 ft | 12 in |
| 6 ft | 24 in | 8 ft | 12 in |
| 8 ft | 32 in | 10 ft 8 in | 12 in |
| 10 ft | 40 in | 13 ft 4 in | 12 in |
Concrete and bags per post hole (4x4 post, 4-in gravel base, per hole, before waste — buy counts round up per hole; the calculator rounds up on the run total instead, so run totals can come out lower):
| Hole (diameter x depth) | Concrete | 50-lb bags (exact / buy) | 80-lb bags (exact / buy) |
|---|---|---|---|
| 10 in x 24 in | 0.77 ft3 | 2.05 / 3 | 1.28 / 2 |
| 10 in x 36 in | 1.23 ft3 | 3.27 / 4 | 2.05 / 3 |
| 12 in x 24 in | 1.17 ft3 | 3.11 / 4 | 1.95 / 2 |
| 12 in x 36 in | 1.87 ft3 | 4.98 / 5 | 3.11 / 4 |
| 12 in x 48 in | 2.57 ft3 | 6.85 / 7 | 4.28 / 5 |
Metric version: a 30 m fence run, posts every 2.4 m, 1.8 m fence, 100 mm nominal posts (90 mm actual), no frost line, no extra posts, 10% waste. Step one — intervals: 30 ÷ 2.4 = 12.5, rounded up = 13 intervals. Step two — posts: 13 + 1 end post = 14 posts. Step three — hole depth: max(1.8 m ÷ 3 = 0.60 m, 0.61 m minimum) = 0.61 m. Step four — post length to buy: 1.8 + 0.61 = 2.41 m posts (buy 2.4 m posts and trim, or 2.7 m if the supplier only stocks longer lengths). Step five — hole diameter: 3 × 100 mm = 300 mm. Step six — concrete per hole: (0.61 − 0.10 m gravel) × (π × 0.15² − 0.09²) = 0.51 × 0.0626 m² = 0.0319 m³. Step seven — run total: 14 × 0.0319 = 0.4469 m³; with 10% waste = 0.4916 m³ (17.36 ft³). Step eight — bags: 17.36 ÷ 0.375 = 46.3, rounded up to 47 × 50-lb bags; 17.36 ÷ 0.6 = 28.9, rounded up to 29 × 80-lb bags. Once posts are set, count pickets and rails with the fence calculator.
Measurement tips
- Measure the run twice and mark the corners first. A run that is 100 ft on paper and 103 ft on the ground needs one more post at 8-ft spacing — and the post count is the number most often gotten wrong.
- Set corner and gate posts first, braced plumb, and pull a string line between them. Line posts set to a string stay straight; posts set by eye wander.
- Call 811 before you dig. Buried utilities are the one mistake that turns a fence job into an emergency — the call is free and the marking is usually done within a few days.
- Put 4 in of compacted gravel under every post, even where the soil drains well. It keeps the post end out of standing water, which is what rots wood posts from the bottom up.
- Brace posts plumb while the concrete sets. Fast-setting mix reaches final set in 20-40 minutes, but wait about 4 hours before hanging rails or gates — a post bumped at 30 minutes sets crooked.
- Slope the concrete surface away from the post so rain runs off instead of pooling against the wood. A finger-width crown at the post is enough.
- Buy posts by the hole depth, not the fence height: a 6-ft fence needs 8-ft posts (24 in buried), an 8-ft fence needs 10-ft 8-in posts. Ordering fence-height posts leaves you 2 ft short in the ground.
- Keep bags dry until the day you pour. Opened or damp bags go lumpy and lose strength — a bag stored damp is a bag wasted.
Common mistakes
- Counting sections instead of posts. A 100-ft run at 8-ft spacing has 13 intervals but needs 14 posts — forgetting the end post sends you back to the store mid-job.
- Using the gross hole volume for concrete. A 12-in hole 36 in deep holds 2.36 ft3 gross, but the post and gravel take 0.49 ft3 of it — ordering gross overbuys by about a quarter.
- Comparing bag counts without the hole diameter. A 10-in hole and a 12-in hole at the same depth differ by about 50% in concrete — that is why one calculator says 2 bags per post and another says 4, and both are right for their own hole.
- Digging above the frost line. A post set above the frost line heaves a little every winter until the fence leans — in freezing ground the hole must reach below the local frost depth, whatever the 1/3 rule says.
- Premixing fast-setting concrete. It is designed to be poured dry into the hole and watered on top; mixed in a wheelbarrow it starts setting before it reaches the hole.
- Hanging gates on fresh posts. Fast-setting mix sets in 20-40 minutes but still needs about 4 hours before it takes strain — a gate hung early rocks the post loose while the concrete is still green.
- Setting posts in standing water. A hole full of water dilutes the mix at the bottom and leaves a weak collar — bail the hole or wait for it to drain, and keep the gravel base under the post.
Factors that affect accuracy
- Fence height: hole depth is one third of the height above ground, so an 8-ft fence (32 in) needs a third more depth than a 6-ft fence (24 in) — and a longer, more expensive post to match.
- Frost line: where the ground freezes, frost depth overrides the 1/3 rule entirely — roughly 12 in in the South to 48 in or more in the far North, set by local code, not by any national table.
- Wind exposure: a solid privacy fence acts like a sail. In high wind, guides go deeper than the 1/3 rule — Quikrete's own post-setting sheet uses one half of the above-ground height — and gate posts go deeper still.
- Soil type: sandy or loose soils grip less and some guides add about 10% depth; expansive clay swells and shrinks and wants the same. Dense, rocky soil grips well and can allow a little less.
- Post size: a 6x6 post needs an 18-in hole against a 4x4's 12-in hole, and displaces more concrete — but the bigger hole still needs more bags overall, roughly 60% more at the same depth.
- Hole diameter: the single biggest lever on bag count. Doubling the diameter quadruples the hole area — a 12-in hole at 24 in needs about 50% more concrete than a 10-in hole at the same depth.
- Gravel base: every inch of gravel is an inch less concrete. A 6-in base instead of a 4-in base saves about 0.11 ft3 per 12-in hole — small per hole, real across a whole run.
- Bag size: yields are 0.375 ft3 (50 lb), 0.45 ft3 (60 lb) and 0.60 ft3 (80 lb). The 50-lb fast-setting bag is the fence-post standard because it pours dry; the 80-lb standard bag is cheaper per cubic foot but must be mixed wet.
Sources & assumptions
- Post count method: intervals = fence length / post spacing, rounded up; posts = intervals + 1 end post + extra posts (corners, gates) — the same method as this site's fence calculator.
- Hole depth = max(1/3 of fence height above ground, 24 in, frost-line depth). Hole diameter = 3 x nominal post width (4x4 -> 12 in, 6x6 -> 18 in) per Quikrete fast-setting concrete mix post-setting instructions.
- Concrete per hole = (hole depth - gravel base) x (hole area - post area): the post displacement and the gravel base are subtracted. Post actual sizes 4x4 = 3.5 x 3.5 in, 6x6 = 5.5 x 5.5 in (American Lumber Standard, PS 20).
- Bag yields per Quikrete concrete mix product data: 80 lb -> 0.60 ft3, 60 lb -> 0.45 ft3, 50 lb -> 0.375 ft3. Fast-setting 50 lb -> 0.375 ft3 with final set in 20-40 minutes, per the Quikrete fast-setting data sheet.
- Frost depth has no national figure — roughly 12 in in the South to 48 in or more in the far North, set by local code (2024 IRC R301.2 sets frost per jurisdiction). Call 811 before you dig.
- Cross-checks: a 4x4 post in a 10-in hole 30 in deep with a 6-in gravel base works out to 0.91 ft3 by this formula, against 0.92 ft3 published for the same hole; a 10-in hole 30 in deep with post subtracted only is 1.14 ft3 per the same comparison. Bag figures on this page always state their hole diameter, because counts without one are not comparable.
- Cost, when shown, uses only the prices per 50-lb bag, per post and per post of labour you enter — no prices are preset.
Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.
Safety note
What this calculator doesn't do
- Holes are modelled as straight cylinders, as an auger digs them. Hand-dug or bell-shaped holes take more concrete — add waste if your holes flare at the bottom.
- The calculator fills concrete to the top of the hole. Quikrete's fast-setting method stops the mix 3-4 in below the top and fills the rest with soil — that saves roughly 0.23 ft3 per 12-in hole, so the calculator's count is the conservative (higher) figure if you follow that method.
- The 1/3-depth rule is a planning rule, not a building code. Frost depths vary by jurisdiction and there is no national figure — check your local code before you dig, and dig below the local frost line wherever one applies.
- Gate and corner posts carry more load than line posts and are commonly set deeper and wider (a 6x6 gate post in a 16-in hole is a common upgrade). The calculator's extra-posts field adds posts; it does not deepen them — deepen gate posts by hand using the hole-volume mode.
- Bag counts are only comparable when the hole diameter is stated. A 10-in hole and a 12-in hole at the same depth differ by about 50% in concrete, which is why other calculators' bag counts look contradictory until you check their hole size.
- Cost is an estimate only, from the prices per bag, per post and per post of labour you enter — no prices are preset. Labour rates vary widely by region and by whether the fence is DIY or hired out.
Post Hole Calculator — frequently asked questions
How many fence posts do I need for a 100 ft fence?
14 posts for a 100 ft run with posts every 8 ft — 13 intervals (100 / 8 = 12.5, rounded up) plus one end post. Add one extra post per gate and per extra corner. Some calculators answer 13 for this run because they let the last bay run short (posts at 0, 8, ..., 96 ft); this calculator keeps every bay at or under the spacing, so it counts 14.
How deep should a fence post hole be?
One third of the fence height above ground, never less than 24 in — so a 6-ft fence needs 24-in holes and an 8-ft fence needs 32-in holes. If your local frost line is deeper than that, dig to the frost line instead. Quikrete's own post-setting sheet uses one half of the above-ground height (36 in for a 6-ft fence) — the deeper reading, worth using in high wind or soft soil.
How wide should a fence post hole be?
Three times the post width: 12 in for a 4x4 post, 18 in for a 6x6 post. That width gives enough concrete around the post to anchor it — a hole barely wider than the post leaves almost no collar and the post rocks loose.
How many bags of concrete do I need per fence post?
Plan on 3–5 × 50-lb bags per post for a standard 4x4 post in a 10–12 in hole, 24–36 in deep — the exact count depends on the hole diameter, always check it. For a 4x4 post with a 4-in gravel base: a 10-in hole 24 in deep needs 0.77 ft3 (2.05 x 50-lb exact, buy 3 per hole); a 12-in hole 24 in deep needs 1.17 ft3 (3.11 x 50-lb exact, buy 4 per hole); a 12-in hole 36 in deep needs 1.87 ft3 (4.98 x 50-lb exact, buy 5 per hole). The calculator rounds up on the run total, so a whole run can need fewer bags than per-hole rounding suggests.
Why do different calculators give different bag counts for the same fence?
Because they assume different holes. A 10-in hole vs a 12-in hole at the same depth differs by about 50% in concrete; skipping the gravel subtraction adds about 0.18-0.26 ft3 per hole; skipping the post subtraction adds about 0.17-0.23 ft3; and rounding up per hole instead of on the run total adds up to nearly a bag per post. Compare calculators only when the hole diameter, depth, gravel and rounding are all stated.
Do you subtract the post and the gravel base from the concrete?
Yes — both. A 12-in hole 36 in deep holds 2.36 ft3 gross, but the 4x4 post displaces 0.23 ft3 and a 4-in gravel base displaces 0.26 ft3, leaving 1.87 ft3 of concrete. Cross-check: a 4x4 post in a 10-in hole 30 in deep with a 6-in gravel base works out to 0.91 ft3 by this formula, against 0.92 ft3 published for the same hole — agreement within rounding.
How deep is the frost line for fence posts?
There is no national figure — frost depth is set locally, roughly 12 in in the South to 48 in or more in the far North, and your building department's table governs. The rule that matters: the bottom of the concrete must sit below the local frost depth, or the post heaves a little every winter. Enter your local figure in the frost-line field and the calculator digs to it.
Should I use fast-setting or standard concrete for fence posts?
Fast-setting for posts: a 50-lb bag yields 0.375 ft3, reaches final set in 20-40 minutes, pours dry into the hole with water on top (no premixing), and takes strain after about 4 hours. Standard 80-lb mix (0.60 ft3 per bag) is cheaper per cubic foot but must be mixed wet and given a full day before the post takes strain. For a whole fence run, fast-setting is the usual choice because posts go up in a day.
Can I use this calculator for deck posts?
Yes — the hole volume mode is the same cylinder-minus-post-minus-gravel math, and deck posts are the second most common use. Deck footings are often deeper and wider than fence holes and may need a permit and an inspection, so check your local code for footing depth and diameter before you dig — the calculator sizes the concrete, it does not approve the footing.
Do I need to call 811 before digging post holes?
Yes. Call 811 (in the US) before you dig anything — the service marks buried utilities, usually free and within a few days. Hitting a buried line is the one post-hole mistake that can injure someone and stop the job cold. Outside the US, use your local before-you-dig service.
How many bags of concrete do I need for 14 fence posts?
For the worked example above — 14 posts, 12-in holes 24 in deep, 4x4 posts, 4-in gravel base — 16.34 ft3 before waste, 17.98 ft3 with 10% waste: 48 x 50-lb bags, 40 x 60-lb bags, or 30 x 80-lb bags. Change the hole diameter or the depth and the count moves fast, so re-run with your actual auger size.
How much does it cost to set fence posts in concrete?
For the worked example above (14 posts, 48 × 50-lb bags): at example prices of $6 per bag and $15 per post, materials are 48 × $6 + 14 × $15 = $498 before labour — labour is charged per post on top. This calculator presets no prices, so enter your store prices above for your total; bag costs use the 50-lb count, and the prices above are example inputs only, not quotes: installed cost = bags x your price per 50-lb bag + posts x your price per post + posts x your labour rate per post. Enter all three prices above and the calculator totals them; bag costs use the 50-lb count, and labour is charged per post including extras.
Next step
Take the post count and bag counts to the supplier and confirm your auger diameter matches the hole diameter in the estimate — a 10-in auger in a 12-in estimate is a different job. Then call 811 before you dig, and compare the materials total against the fence calculator if you still need pickets and rails.
Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.