Plaster Calculator

Almost every plaster calculator on the web stops at volume: it tells you the cubic feet and leaves you to work out the bags. That is the hard half of the job, because the answer moves about 15% depending on which dry-volume convention you use, and because "plaster" means three different jobs: cement plaster (cement + sand, measured in 50 kg bags), two-coat plaster (a scratch coat plus a finish coat, the South African pattern), and UK gypsum skim (25 kg bags over plasterboard). This plaster calculator does all three on one page, in feet or metres. Mode A takes your net wall area (openings deducted), a thickness preset and a mix ratio, and gives you wet volume, dry volume at the stated 1.33 factor, 50 kg cement bags, sand in m3 and ft3, optional water, and an installed-cost estimate — with the textbook variant shown alongside so you can see why another calculator gave you a lower number. Mode B splits a two-coat job into scratch and finish coats with bags and sand per coat and in total. Mode C sizes UK gypsum skim by product — Multi-Finish, Board Finish, Bonding or One Coat — from your board count. If you have ever searched "how many bags of plaster do I need" or "how much plaster do I need for a wall", this is that answer, with the convention stated instead of hidden. For the wall itself, use the brick calculator or the concrete block calculator, for the mortar behind it the mortar calculator, and for the finish coat of paint the paint calculator.

Quick answer: One 50 kg bag of cement covers about 13-14 m2 at 12 mm with a 1:6 mix, under either dry-factor convention (textbook: 100 / 7.5 = 13.3 m2 per bag; ordering default: 9.29 m2 / 0.67 bags = 13.9 m2 per bag). So a 100 m2 wall at 12 mm, 1:6 needs 8 bags by the ordering default (7.5 bags unrounded by the textbook variant) and 1.50 m3 of sand. For UK gypsum skim, one 25 kg bag of Multi-Finish covers 8-10 m2 at 2 mm in practice — about 2.5-3 standard boards per bag.
Pick the job: cement plaster for sand-and-cement render, two-coat for scratch + finish, gypsum skim for plasterboard. Only the fields for your mode are used.
Total wall area before openings. Modes A and B only — Mode C counts boards instead.
Total area of doors and windows in the wall. Enter 0 for a blank wall. If openings exceed the wall area, the net area is treated as zero.
Mode A only. 6 mm ceilings, 12 mm internal, 15 mm sheltered, 20 mm external — see the thickness guide below.
Mode A only. Internal 1:6, external and wet areas 1:4, ceilings 1:3-1:4. Richer mixes use more cement per square metre, not more plaster.
Mode B only. First coat, keyed for the finish coat — 12 mm is the SA pattern standard.
Mode B only. Second coat over the scratch coat — 6 mm is the SA pattern standard.
Mode B only. Internal walls use 1:6; external and wet walls use the richer 1:4.5. On smooth dense concrete, apply a spatterdash or bonding agent first or the plaster delaminates — ceilings worst.
Mode C only. Number of standard 2400 x 1200 mm boards (2.88 m2 each) to skim. Count the boards, not the wall area — damaged boards skim worse and waste more.
Mode C only. Multi-Finish and Board Finish skim at 2 mm; Bonding is an 8 mm undercoat; One Coat figures depend on the exact product — the result names both.
Modes A and B only. Applied to the wet volume before the dry factor. 10% covers spillage, hollow filling and dropped plaster on most walls; use 15% on rough blockwork.
Your store price per bag — 50 kg cement in Modes A and B, 25 kg gypsum in Mode C, in dollars — leave blank to skip the cost estimate.
Modes A and B only. Your bulk sand price per cubic metre, in dollars — leave blank to skip the sand cost.
Modes A and B only. Your labour rate per square foot (or square metre) of net wall area, in dollars — leave blank to skip the labour cost. Ceiling work costs more than wall work.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Plaster Calculator

  1. Pick the mode first: Mode A for cement plaster, Mode B for a two-coat scratch + finish job, Mode C for UK gypsum skim over plasterboard. Only your mode's fields are used.
  2. Mode A: enter the gross wall area and the openings area — the calculator deducts doors and windows, so measure them too and add their areas together. Pick a thickness preset (6 mm ceiling, 12 mm internal, 15 mm sheltered, 20 mm external) and a mix (internal 1:6, external 1:4, ceiling 1:3-1:4).
  3. Mode B: enter the net wall area the same way, then the scratch thickness (12 mm standard) and the finish thickness (6 mm standard), and pick internal 1:6 or external 1:4.5. Read the bags and sand per coat as well as the total — each coat is bought separately.
  4. Mode C: count your 2400 x 1200 mm boards and pick the product — Multi-Finish, Board Finish, Bonding or One Coat. The result is a range, not a single figure: buy the top of the range on damaged boards or in cold rooms.
  5. Read the cement bags first if you are buying cement, and the sand volume first if you are ordering bulk sand. The dry volume line shows the 1.33 factor explicitly — if another calculator gave you a lower number, check whether it used the textbook 1.27 + 20% variant shown in the footnote.
  6. On smooth dense concrete, do not skip the bonding step: apply a spatterdash coat or a bonding agent before the scratch coat, or the plaster delaminates — ceilings are the worst for this, because gravity helps the failure along.
  7. Enter your per-bag price, sand price and labour rate for an installed-cost estimate — useful for comparing DIY against a plasterer's quote.

Plaster Calculator formula

Net wall area = gross area - openings area (never below zero). Wet plaster volume = net area x thickness (thickness in metres: mm / 1,000 — this is the mm-to-m step most hand calculations get wrong). Wet volume with waste = wet volume x (1 + waste % / 100). Dry volume = wet volume with waste x 1.33 (ordering default). Cement volume = dry volume x cement parts / total parts; sand volume = dry volume x sand parts / total parts. Cement bags = cement volume x 1,440 kg/m3 / 50 kg, rounded up. Sand in ft3 = sand in m3 / 0.0283168. Water (optional, cement plaster only) = about 20% of (cement kg + sand kg), in litres. Textbook variant (footnote): dry volume = wet volume x 1.27 x 1.20, split the same way — it reads about 15% lower than the ordering default on the same wall. Two-coat: each coat is computed separately by the same formula and the bags are rounded up per coat, then added. Gypsum skim: boards area = boards x 2.88 m2 (2400 x 1200 mm); Multi-Finish / Board Finish bags = area / 8 to area / 10, rounded up; Bonding bags = area / 3 to area / 3.5, rounded up; One Coat bags are computed in square feet (area in m2 x 10.7639) against the named product coverage. Example: 100 m2, 12 mm, 1:6, 10% waste — wet = 100 x 0.012 = 1.20 m3; with waste = 1.32 m3; dry = 1.32 x 1.33 = 1.7556 m3; cement = 1.7556 / 7 = 0.2508 m3 x 1,440 = 361.15 kg, so 361.15 / 50 = 7.22, rounded up to 8 bags; sand = 1.7556 x 6 / 7 = 1.5048 m3 = 53.14 ft3.

Worked example

A 100 m2 wall (no openings to deduct), 12 mm plaster, 1:6 mix, 10% waste, ordering default. Step one — wet volume: 100 x 0.012 = 1.20 m3. Step two — with waste: 1.20 x 1.10 = 1.32 m3. Step three — dry volume: 1.32 x 1.33 = 1.7556 m3. Step four — cement: 1.7556 / 7 = 0.2508 m3 x 1,440 = 361.15 kg, so 8 x 50 kg bags (7.22 unrounded, rounded up). Step five — sand: 1.7556 x 6 / 7 = 1.5048 m3 (53.14 ft3). Step six — water (optional): 20% of (361.15 + 2,407.68) = about 554 litres. Textbook footnote for the same wall (1.27 + 20%): dry = 1.20 x 1.27 x 1.20 = 1.8288 m3; cement = 1.8288 / 7 x 1,440 = 376.21 kg = 7.5 bags unrounded; sand = 1.57 m3. The textbook variant reads lower on bags only because it is unrounded and uses the lighter dry factor — buy 8 bags, not 7, or the last square metres run dry.

Imperial version: a 100 ft2 wall (9.2903 m2), 12 mm, 1:6, 10% waste, ordering default. Wet = 9.2903 x 0.012 = 0.1115 m3; with waste = 0.1226 m3; dry = 0.1226 x 1.33 = 0.1631 m3; cement = 0.1631 / 7 x 1,440 = 33.55 kg, so 1 x 50 kg bag; sand = 0.1631 x 6 / 7 = 0.1398 m3 (4.94 ft3); water about 51 litres.

Two-coat version: a 10 m2 wall, scratch 12 mm + finish 6 mm, internal 1:6, 10% waste. Scratch: wet = 10 x 0.012 = 0.12 m3; dry = 0.12 x 1.10 x 1.33 = 0.1756 m3; cement = 0.1756 / 7 x 1,440 = 36.12 kg, so 1 bag; sand = 0.1505 m3. Finish: wet = 10 x 0.006 = 0.06 m3; dry = 0.0878 m3; cement = 18.06 kg, so 1 bag; sand = 0.0752 m3. Total to buy: 2 bags, 0.2257 m3 sand — one bag per coat, rounded per coat. The SA ready reckoner quotes 1.3 bags + 0.26 m3 for the same 10 m2 including 10% waste: its unrounded cement figure runs higher because it allows extra for rough backgrounds, so on rough blockwork trust the higher sand figure.

Gypsum version: 10 boards (2400 x 1200 mm = 28.8 m2 = 310.0 ft2). Multi-Finish: 28.8 / 10 = 2.88, rounded up to 3 bags at the generous end and 28.8 / 8 = 3.60, rounded up to 4 bags at the tight end — practical boards-per-bag gives 10 / 3 = 3.33, rounded up to 4 and 10 / 2.5 = 4, so buy 4 bags, water 4 x 11.5 = 46 litres. Bonding at 8 mm: 28.8 / 3.5 = 8.23, rounded up to 9, and 28.8 / 3 = 9.60, rounded up to 10, so 9-10 bags, buy 10. One Coat: IN one-coat type 310.0 / 18 = 17.22, rounded up to 18, and 310.0 / 16 = 19.38, rounded up to 20, so 18-20 bags (IN one-coat); Gyproc Elite 90 type 310.0 / 24 = 12.92, rounded up to 13 bags — same wall, different product, different count, which is why the product name travels with every one-coat figure.

Coverage / yield reference — cement plaster, per 100 m2 (textbook basis: dry factor 1.27 + 20% joints/wastage, bags unrounded):

Thickness / mix50 kg bagsSand (m3)
6 mm ceiling, 1:36.60.69
12 mm internal, 1:67.51.57
12 mm internal, 1:410.51.46
15 mm, 1:69.41.96
15 mm, 1:413.21.83
20 mm external, 1:417.62.44
Coverage / yield reference — cement plaster, per 100 sq ft (ordering-default basis: dry factor 1.33 + 10% waste, bags unrounded):
Thickness / mix50 kg bagsSand (ft3)
12 mm, 1:60.674.9
12 mm, 1:40.944.6
20 mm, 1:41.577.7
Coverage / yield reference — SA two-coat ready reckoner, per 10 m2 including 10% waste (as published; scratch 12 mm + finish 6 mm):
Exposure / mix50 kg bagsSand (m3)
Internal, 1:61.30.26
External / wet, 1:4.51.70.25
Coverage / yield reference — UK gypsum skim, per 25 kg bag:
ProductCoverageNote
Multi-Finish, 2 mm skim8-10 m2Practical: 2.5-3 boards per bag; water 11.5 L per bag
Board Finish, 2 mm skim8-10 m2Same skim range as Multi-Finish; check your bag's chart
Bonding, 8 mm undercoat3-3.5 m2Undercoat, not a finish skim
One Coat (IN type), 12 mm16-18 sq ftProduct-specific — do not use for other one-coat products
One Coat (Gyproc Elite 90), 13 mm24 sq ftProduct-specific — different product, different coverage
Thickness guide. 6 mm for ceilings (thin, or it sags and cracks); 12 mm for internal walls (the default); 15 mm for sheltered or uneven internal work; 20 mm for external walls, where weather and uneven masonry need the depth. Thicker is not stronger past the guide — a 25 mm single coat slumps and cracks, which is why thick external work goes on in two coats.

Mix guide. Internal walls 1:6 (lean and economical, plenty strong for a protected wall); external and wet walls 1:4 (richer, more weather-resistant); ceilings 1:3-1:4 (rich, because a ceiling coat must grip overhead). A richer mix costs more cement per square metre but does not change the plaster volume — the thickness sets the volume, the mix only splits it.

Openings-deduction rule. Measure every door and window in the wall, add their areas, and subtract the total from the gross wall area before any other step. A single door is about 21 ft2 (2 m2) of wall you are not plastering — skipping this step is the biggest source of over-ordering on small rooms, and it also overstates the labour cost, which is charged on net area.

Measurement tips

  • Deduct the openings before anything else. A door (about 21 ft2) and two windows (about 30 ft2 together) remove 51 ft2 from a 12 x 10 ft room's walls — nearly a sixth of the plaster, and the same fraction of the labour bill.
  • Convert millimetres to metres before multiplying: 12 mm is 0.012 m, not 0.12 m. Entering 12 instead of 0.012 overstates the volume tenfold — the single most common plaster-arithmetic error, and the same trap as entering inches where feet belong (divide inches by 12 first).
  • Order by the higher convention on rough backgrounds. The ordering default (1.33 + waste) and the textbook variant (1.27 + 20%) differ by about 15%; rough brick and blockwork eat plaster into hollows and joints, so the higher figure is the safe order there.
  • On smooth dense concrete, bond first or replaster later. A spatterdash coat or a bonding agent is not optional on smooth concrete — without it the plaster delaminates, and ceilings fail first because gravity pulls the failed coat down.
  • For two-coat work, buy per coat, not per total. The scratch coat and the finish coat are mixed and applied on different days; rounding each coat up separately (as this tool does) means the second coat never waits on a half-bag the first coat already used.
  • For gypsum skim, buy the top of the range. Multi-Finish at 8-10 m2 per bag means 3-4 bags for 10 boards — buy 4. A bag opened for the last board costs more in a second trip than the spare bag costs on the shelf, and gypsum keeps 3-4 months if stored dry.
  • Keep gypsum bags dry and use them within 3-4 months of manufacture. Damp or stale gypsum sets wrong — lumpy, weak, or too fast — and no calculator can compensate for a dead bag.
  • Mix cement plaster to the wall, not to a litre count. The 20%-of-dry-weight water figure is a planning number for ordering water on site; the plasterer judges the working consistency by eye, and a mix that is too wet shrinks and cracks as it dries.
  • Price the sand as bulk, not bags, once you pass about a cubic metre. Bagged sand costs several times more per cubic metre than a bulk delivery, and a 100 m2 wall at 12 mm already needs about 1.5 m3.

Common mistakes

  • Entering thickness in millimetres as if it were metres. 12 mm x 100 m2 is 1.20 m3, not 12.0 m3 — divide mm by 1,000 first. The imperial twin of this error is entering a thickness in inches where the formula wants feet: divide inches by 12 first (12 mm is about 1/2 in, 20 mm about 3/4 in).
  • Counting the gross wall area. Doors and windows are not plastered; a room with one door and two windows over-orders by about a sixth if you skip the deduction.
  • Comparing bag counts across conventions without naming them. "7.5 bags" (textbook, unrounded) and "8 bags" (ordering default, rounded up) describe the same 100 m2 wall at 12 mm, 1:6 — quoting one against the other as if one were wrong is how two honest estimates look like a disagreement.
  • Copying a per-100-sq-ft table that reads 3-4 bags per 100 sq ft at 12 mm, 1:6. Two independent sources agree on about 0.67-0.82 bags per 100 sq ft for that specification; a table reading 4-5x higher has mixed up its units, and ordering from it buys four walls' worth of cement for one.
  • Skipping the bonding step on smooth concrete. Plaster applied straight to smooth dense concrete, especially on ceilings, delaminates in sheets — a spatterdash coat or bonding agent first is cheaper than replastering.
  • Merging one-coat products into one figure. IN one-coat at 16-18 sq ft per bag and Gyproc Elite 90 at 24 sq ft per bag are different products at different thicknesses (12 mm vs 13 mm); a single "one-coat coverage" number fits neither.
  • Using a single bare coverage figure for gypsum skim. Multi-Finish is 8-10 m2 per bag in practice, not a single number — the low end is the honest figure for damaged boards, cold rooms and first-time skimming.
  • Ordering gypsum by wall area instead of board count. Skim coverage is sold per board in practice (2.5-3 boards per bag) because boards, not square metres, are what you actually carry into the room — and a board count catches the offcuts a pure area figure misses.
  • Forgetting that a richer mix costs cement, not volume. Switching from 1:6 to 1:4 on 100 m2 at 12 mm raises cement from 7.5 to 10.5 bags (textbook) but leaves the plaster volume at 1.20 m3 wet — budgeting by volume alone understates the cement bill by 40%.

Factors that affect accuracy

  • Thickness: plaster volume is directly proportional to thickness — 20 mm external work takes 67% more material than 12 mm internal work on the same wall, before any mix change.
  • Mix ratio: richer mixes (1:3, 1:4) take more cement and less sand per cubic metre of dry mix; leaner mixes (1:6) take less cement and more sand. Volume does not change with mix, only the split — and the cost, since cement costs more than sand.
  • Dry-factor convention: 1.33 + waste (ordering default) vs 1.27 + 20% (textbook) moves the answer about 15%. State which one your quote uses before comparing two plasterers' material lists.
  • Background roughness: rough brick and blockwork swallow plaster into hollows and joints — the reason both conventions include a waste allowance, and the reason 15% waste beats 10% on unplastered blockwork.
  • Openings: every door and window subtracted removes plaster, cement, sand and labour — net area is the input that matters, not gross.
  • Substrate: smooth dense concrete needs a spatterdash or bonding agent first; without it, adhesion fails and the whole estimate is wasted. Ceilings are the worst case.
  • Gypsum board condition: damaged boards, cold rooms and first-time skimming all push Multi-Finish toward the 8 m2 end of its 8-10 m2 range — and toward 2.5 rather than 3 boards per bag.
  • Gypsum shelf life: bags older than 3-4 months, or stored damp, set unpredictably — buy fresh bags for a skim coat rather than using last season's leftovers.
  • Waste: spillage, hollow filling, dropped plaster and bucket waste are real consumption — 10% is the floor for most walls, 15% for rough backgrounds or first-time work.

Sources & assumptions

  • Ordering default (this tool): dry volume = wet volume x (1 + waste % / 100) x 1.33, split by the mix ratio; cement bags = cement volume x 1,440 kg/m3 / 50 kg, rounded up; sand in ft3 = sand in m3 / 0.0283168. The 1.33 factor and 10% waste default follow engineeringnepal's plaster calculator (rough brick walls, mason fills hollows/joints).
  • Textbook variant (footnote on every Mode A result): dry volume = wet volume x 1.27 x 1.20, split the same way — per thecivilstudies' plaster calculation. It reads about 15% lower than the ordering default on the same wall; the engineeringnepal worked example proves the gap (20 mm 1:4 house: 52.8 bags default vs 45.9 bags at 1.27 + 0% extra).
  • Per-100 m2 table (textbook basis, bags unrounded): 6 mm ceiling 1:3 = 6.6 bags + 0.69 m3 sand; 12 mm 1:6 = 7.5 + 1.57; 12 mm 1:4 = 10.5 + 1.46; 15 mm 1:6 = 9.4 + 1.96; 15 mm 1:4 = 13.2 + 1.83; 20 mm external 1:4 = 17.6 + 2.44 — per thecivilstudies. Each figure is arithmetic from wet volume x 1.27 x 1.20 split by the mix (e.g. 12 mm 1:6: 1.20 x 1.27 x 1.20 = 1.8288 m3 dry; cement 1.8288 / 7 x 1,440 = 376.21 kg = 7.52 bags; sand 1.8288 x 6 / 7 = 1.57 m3).
  • Per-100 sq ft table (ordering-default basis, bags unrounded): 12 mm 1:6 = 0.67 bags + 4.9 ft3 sand; 12 mm 1:4 = 0.94 + 4.6; 20 mm 1:4 = 1.57 + 7.7 — per engineeringnepal. Quick-answer cross-check: 1 bag covers about 13-14 m2 at 12 mm, 1:6 under either convention (textbook 100 / 7.5 = 13.3; ordering 9.2903 / 0.67 = 13.9).
  • SA two-coat ready reckoner (as published, per 10 m2 including 10% waste, scratch 12 mm + finish 6 mm = 18 L/m2): internal 1:6 = 1.3 bags + 0.26 m3 sand; external/wet 1:4.5 = 1.7 bags + 0.25 m3 — per sapropertytools' plaster calculator (Concrete Society of Southern Africa 2024 leaflets). It runs above this tool's 1.33-factor figure on rough backgrounds; on rough blockwork order by the higher figure. Bonding rule from the same source: smooth dense concrete needs a bonding agent or spatterdash coat first or plaster delaminates (ceilings worst).
  • Mix guidance: internal 1:6, external/wet 1:4, ceiling 1:3-1:4 — engineeringnepal and thecivilstudies agree. Thickness presets: 6 mm ceilings, about 12 mm interior, 15-20 mm exterior — per calculatorzilo's plaster-volume page, which also warns to divide inches by 12 (the inch-to-feet trap) and states the 1.33 dry factor with a 0.0347 m3 per 50 kg bag conversion. Water about 20% of dry-material weight (happho pattern, optional output only).
  • UK gypsum skim: Multi-Finish 25 kg covers about 10 m2 at 2 mm on paper, 2.5-3 boards per bag in practice — per kentplasterers' bag-of-plaster guide; this page publishes the range 8-10 m2 at 2 mm, never a single bare figure. Bonding about 3-3.5 m2 per 25 kg bag at 8 mm (same source). Water 11.5 L per 25 kg multi-finish bag (British Gypsum, via bdlisle). Gypsum shelf life 3-4 months (kentplasterers). Board Finish uses the same 8-10 m2 skim range as Multi-Finish on this page (both are 2 mm skim coats) — a stated assumption, not a manufacturer claim; the bag's own chart overrides it.
  • One-coat gypsum is product-specific and never merged: IN one-coat 25 kg covers about 16-18 sq ft at 12 mm (Super Gypsum datasheet) vs Gyproc Elite 90 about 24 sq ft at 13 mm. Every one-coat figure on this page names its product. UK product set (Multi-Finish / Board Finish / Bonding / One Coat) matches calctools.uk's dedicated UK plaster calculator.
  • NOT used: HomeRun Bangalore's per-100-sq-ft plaster table (about 3-4 bags per 100 sq ft at 12 mm 1:6) contradicts both thecivilstudies and engineeringnepal by about 4-5x and looks like a per-room vs per-100-sq-ft mix-up — flagged as an outlier, never copied.
  • Cement density 1,440 kg/m3, sand 1,600 kg/m3; standard board 2400 x 1200 mm = 2.88 m2; 1 m2 = 10.7639 ft2. Cost, when shown, uses only the prices per bag, per cubic metre of sand and labour rate you enter — no prices are preset. Two-coat bags are rounded up per coat, then added.

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

Safety note

Plaster dust irritates lungs and eyes — wear a dust mask when mixing, and gloves and eye protection, since wet plaster is caustic. Ceiling work is overhead work: wear eye protection and never plaster a ceiling alone on a ladder. On smooth dense concrete, bond first (spatterdash or bonding agent) or the coat can delaminate and fall.
Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • This tool's ordering default (dry factor 1.33 + your waste allowance) and the textbook variant (1.27 + 20%) read about 15% apart on the same wall — see the textbook footnote on every Mode A result. Neither is wrong; they allow differently for hollows, joints and spillage. On rough brick or blockwork, order by the higher figure.
  • The SA two-coat ready reckoner quoted on this page (1.3 bags + 0.26 m3 per 10 m2 internal) runs above this tool's 1.33-factor result, because the SA leaflets allow extra for rough backgrounds. The tool rounds each coat's bags up separately, so its buy count is also above the unrounded total — that is deliberate, not an error.
  • Mode C coverage is a range, never a single figure: Multi-Finish 8-10 m2 per 25 kg bag at 2 mm, and 2.5-3 boards per bag in practice, because a real two-pass skim runs nearer 3 mm than 2 mm and bucket waste is real. Buy the top of the range if the boards are damaged or the room is cold.
  • Board Finish uses the same 8-10 m2 per bag range as Multi-Finish on this page — both are 2 mm skim coats, and the bag's own chart overrides this page if it differs. Bonding and One Coat water figures are not stated here: use the water ratio on the bag you buy, since it varies by product.
  • One-coat figures are product-specific and are never merged: IN one-coat 25 kg covers about 16-18 sq ft at 12 mm, while Gyproc Elite 90 covers about 24 sq ft at 13 mm. A figure without a product name attached is not a one-coat figure you can order from.
  • Water (about 20% of dry-material weight) is a planning figure for cement plaster, not a mixing instruction — mix to the consistency your plasterer judges on the wall, and follow the bag's instructions for gypsum products.
  • Cost is an estimate only, from the prices you enter — no prices are preset. Labour rates vary widely by region, by whether the work is internal or external, and by ceiling work, which is slower than wall work.
  • This page sizes plaster materials only. It does not check whether a wall needs hacking, bonding agent, mesh, beads or a scratch coat first, and it does not approve a structural or damp-proofing design — check your local building code and the substrate guidance below before you plaster.

Plaster Calculator — frequently asked questions

How many bags of plaster do I need for 100 m2?

8 x 50 kg bags for 100 m2 at 12 mm, 1:6, 10% waste by the ordering default (dry factor 1.33): wet 1.20 m3, dry 1.7556 m3, cement 361.15 kg = 7.22 bags unrounded, rounded up to 8 — with 1.5048 m3 (53.14 ft3) of sand. By the textbook variant (1.27 + 20%): 7.5 bags unrounded and 1.57 m3 of sand. Buy 8 bags.

How much plaster do I need for 100 sq ft?

1 x 50 kg bag for 100 sq ft at 12 mm, 1:6, 10% waste by the ordering default: wet 0.1115 m3, dry 0.1631 m3, cement 33.55 kg = 0.67 bags unrounded, rounded up to 1 — with 0.1398 m3 (4.94 ft3) of sand and about 51 litres of water. At 12 mm, 1:4 the same 100 sq ft needs 0.94 bags unrounded and 4.6 ft3 of sand; at 20 mm, 1:4 it needs 1.57 bags and 7.7 ft3.

How many bags of plaster do I need for a ceiling?

7 x 50 kg bags per 100 m2 of ceiling at 6 mm, 1:3, 10% waste by the ordering default (wet 0.60 m3, dry 0.8778 m3, cement 316.01 kg = 6.32 bags unrounded, rounded up to 7; sand 0.6584 m3). By the textbook variant: 6.6 bags unrounded and 0.69 m3 of sand. Ceilings use the rich 1:3-1:4 mix because the coat must grip overhead, and the thin 6 mm coat because a thick ceiling coat sags.

How many bags of plaster do I need for two-coat plastering?

2 x 50 kg bags to buy for 10 m2 internal two-coat (scratch 12 mm + finish 6 mm, 1:6, 10% waste): scratch 1 bag (36.12 kg cement, 0.1505 m3 sand) + finish 1 bag (18.06 kg cement, 0.0752 m3 sand) = 2 bags and 0.2257 m3 of sand in total, rounded per coat. The SA ready reckoner quotes 1.3 bags + 0.26 m3 unrounded for the same 10 m2 — its sand figure runs higher for rough backgrounds, so trust it on rough blockwork. External/wet two-coat (1:4.5) for 10 m2: 1.7 bags + 0.25 m3 by the SA reckoner.

How many bags of gypsum plaster do I need for 10 boards?

4 x 25 kg bags of Multi-Finish for 10 standard boards (2400 x 1200 mm = 28.8 m2): 28.8 / 10 = 2.88, rounded up to 3 bags at the generous end and 28.8 / 8 = 3.60, rounded up to 4 at the tight end; practical boards-per-bag (2.5-3 per bag) also gives 4 — buy 4, with 46 litres of water (4 x 11.5 L). The same 10 boards need 9-10 bags of Bonding at 8 mm (buy 10).

How much plaster do I need per square metre?

0.08 bags per square metre at 12 mm, 1:6 by the ordering default (8 bags per 100 m2, 10% waste), with 0.0150 m3 of sand per square metre (1.5048 m3 per 100 m2). At 20 mm, 1:4 the same square metre needs 0.176 bags (17.6 per 100 m2 textbook, 1.83-2.44 m3 of sand per 100 m2 depending on mix — see the tables above). In imperial units: 0.0067 bags per square foot at 12 mm, 1:6 (0.67 per 100 sq ft).

How much sand do I need for plastering 100 m2?

1.50 m3 of sand for 100 m2 at 12 mm, 1:6, 10% waste by the ordering default (53.14 ft3); 1.57 m3 by the textbook variant. At 15 mm, 1:6 the same wall needs 1.96 m3 (textbook) and at 20 mm, 1:4 it needs 2.44 m3 (textbook). Sand is the bulk of every plaster mix by volume — about six sevenths of a 1:6 mix — so price it as a bulk delivery, not in bags.

How many 25 kg bags of bonding plaster do I need?

9-10 bags of Bonding for 10 standard boards (28.8 m2) at 8 mm — 28.8 / 3.5 = 8.23, rounded up to 9, and 28.8 / 3 = 9.60, rounded up to 10 — buy 10. Per square metre that is about 0.31-0.35 bags (1 / 3.5 to 1 / 3). Bonding is an undercoat, not a finish skim: it goes on first, and the finish skim goes over it.

How many bags of one-coat plaster do I need?

It depends on the product, and the product name is part of the answer: for 10 standard boards (310.0 sq ft), IN one-coat needs 18-20 bags (310.0 / 18 = 17.22, rounded up to 18; 310.0 / 16 = 19.38, rounded up to 20) at 12 mm, while Gyproc Elite 90 needs 13 bags (310.0 / 24 = 12.92, rounded up to 13) at 13 mm. Never order one-coat plaster from a figure that does not name its product.

What mix ratio should I use for plastering?

1:6 for internal walls (lean, economical, plenty strong for a protected wall); 1:4 for external and wet walls (richer, more weather-resistant); 1:3-1:4 for ceilings (rich, because the coat must grip overhead). In numbers for 100 m2 at 12 mm (textbook): 1:6 = 7.5 bags + 1.57 m3 sand; 1:4 = 10.5 bags + 1.46 m3 sand — the richer mix costs 3 more bags of cement for the same wall.

How thick should plaster be?

6 mm for ceilings, 12 mm for internal walls, 15 mm for sheltered or uneven internal work, 20 mm for external walls. In numbers for 100 m2 at 1:4 (textbook): 12 mm = 10.5 bags + 1.46 m3 sand; 15 mm = 13.2 bags + 1.83 m3; 20 mm = 17.6 bags + 2.44 m3. Thicker than 20 mm in a single coat slumps and cracks — thick work goes on in two coats (Mode B).

Do I deduct doors and windows from plaster area?

Yes — always. Net area = gross wall area minus the total area of doors and windows, never below zero. A single door is about 21 ft2 (2 m2): on a 100 ft2 wall that is a fifth of the plaster, the cement, the sand and the labour. Enter the openings area in Mode A or B and the calculator deducts it before any other step.

How much does plastering cost per square metre?

Multiply bags x your price per bag + sand x your price per cubic metre + net area x your labour rate — this calculator presets no prices. As an illustration with entered prices: 100 m2 at 12 mm, 1:6, with 8 bags at $12 ($96), 1.50 m3 of sand at $40 ($60) and labour at $8 per m2 ($800) gives an installed total of $956. Enter your own three prices above and the calculator totals them; ceiling work costs more per square metre than wall work.

How long does gypsum plaster keep?

3-4 months from manufacture if stored dry — after that, or after damp storage, gypsum sets unpredictably (lumpy, weak, or too fast). Buy fresh bags for a skim coat, keep them off damp floors, and do not use last season's leftovers for visible finish work. Cement plaster bags have the same rule in practice: opened or damp cement goes lumpy and loses strength.

Next step

Take the bag count and sand volume to the supplier and confirm the mix ratio and thickness on your order match the estimate — then check the bonding note above for smooth concrete, and price the finish coat with the paint calculator once the plaster has cured.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.