Roof Pitch Calculator — What Is My Roof Pitch? Pitch, Angle & Shingle Quantities

Roof pitch is how steep a roof is, stated as rise over a 12 in run: a 6/12 roof rises 6 in for every 12 in it runs. The same roof is 26.57° and a 50% grade, and the slope factor — 1.118 at 6/12 — is the multiplier that turns flat footprint into sloped roof area. This roof pitch calculator takes the pitch in whichever form you have it — x/12, rise and run, an angle in degrees, a percent grade, or rise and span — and returns the pitch in every form, the rafter length with the overhang, the roof area in square feet and in squares, the shingle bundles to order at your waste allowance, and the IRC minimum slope for every covering, so you can see at a glance whether shingles are allowed at your pitch or whether the roof needs metal or a membrane. For the cut length of each rafter, with the ridge deduction and the birdsmouth check, use the rafter length calculator; for the shingles themselves, the roofing calculator; for the snow load the pitch carries, the roof snow load calculator; and for the gutters that drain it, the gutter size calculator.

Quick answer: A 40 × 30 ft house at a 6/12 pitch has a roof pitch of 6/12 — 26.57° and a 50% grade — with a slope factor of 1.118. Its roof is 1,503 sq ft, or 15.03 squares, so order 50 shingle bundles at 10% waste (52 at 15%). The rafter over a 15 ft run is 16.77 ft before the overhang and 17.89 ft with a 12 in overhang. Asphalt shingles are allowed at 6/12 with standard underlayment, and the roof is walkable with care. Enter your own building below for your exact pitch, area and bundle count.
How steep the roof is. Enter 6 for a 6/12 pitch, 26.57 for the same roof in degrees, 50 for the same roof as a percent grade, or the rise in feet/metres for the rise modes — pick the form below.
Most plans and shingle specs state pitch as rise per 12 in. An angle, a grade, or a measured rise all work — the tool converts them to the same pitch. Rise + run and rise + span are the same roof: the run is half the span.
Horizontal distance from the eave to the ridge — half the building width on a symmetric gable. Leave blank in every other mode. If it disagrees with half the building width below, the tool says so rather than guessing which one you meant.
Length of the building along the ridge, outside wall to outside wall. With the gable overhang below, this sets the eave length the roof area is measured along.
Width of the building across the ridge, outside wall to outside wall. One rafter covers half of it — the tool halves the width to get the run.
How far the eave projects past the outside of the wall, measured level (horizontally). 12–24 in is typical. The overhang extends the rafter along the slope — it does not add inch for inch.
How far the roof projects past the gable-end wall, measured level. Set it to 0 to match the sources that count only the eave overhang — the worked example below shows both conventions.
Area to subtract for skylights, chimneys and large roof openings, in square feet or square metres. Leave blank for none — small vents are absorbed by the waste allowance, not deducted.
Extra shingles for cuts, starter courses and mistakes. A simple gable takes 10%; a hip roof or a roof with valleys takes 15%; a cut-up roof with dormers and valleys takes 20%.
The roof area is the same for both shapes at the same footprint and pitch — the slope projections tile the footprint either way. The shape changes which rafter rows matter: a hip roof has hip rafters, a gable roof does not.

Planning this project? Save to Pinterest to find this calculator again later.

How to use the Roof Pitch Calculator — What Is My Roof Pitch? Pitch, Angle & Shingle Quantities

  1. Measure the rise over a 12 in run. Set a level on the roof (or on a rafter in the attic), mark 12 in along it, and measure straight down from the level to the roof surface at the mark. That drop, in inches, is the pitch: a 6 in drop is a 6/12 pitch. Measure in two or three places — a sagging roof reads differently at the ridge than at the eave.
  2. Or measure rise and run from the ground. If you can measure the building width and the ridge height, the run is half the width and the pitch is rise ÷ run × 12. A 30 ft wide building with a 7 ft 6 in ridge rise is (7.5 ÷ 15) × 12 = 6/12. Enter the rise and the width in the rise + span mode and the tool does the division.
  3. Or use an angle or a grade. A clinometer or a phone level gives an angle — 26.57° is 6/12. A drawing may give a percent grade — 50% is 6/12. Switch the selector to the form you have; the tool converts it to the same pitch. Treat a phone-tilt reading as an estimate (±1°), not the number you order by.
  4. Enter the building and the overhangs. Length along the ridge and width across it, outside wall to outside wall, plus the eave overhang (past the side walls) and the gable-end overhang (past the end walls), measured level. The overhangs extend the roof along the slope, so 12 in of overhang is 13.4 in of rafter at 6/12.
  5. Read the pitch in every form. The result shows x:12, the angle in degrees, the percent grade and the slope factor together — so a plan that says 6/12, a level that says 26.57° and a drawing that says 50% all agree, and you can quote whichever form the next person asks for.
  6. Read the rafter length. The theoretical rafter (ridge centreline to wall plate, no overhang) and the actual rafter with the overhang are both shown, in feet and fractional inches. The ridge deduction and the birdsmouth check live on the rafter length calculator — this page gives the length, that page gives the cut.
  7. Read the roof area in squares. The area is the slope area — footprint × slope factor, with the overhangs added — minus your deductions, shown in square feet, square metres and squares (1 square = 100 sq ft). A hip roof of the same footprint and pitch has the same area: the slope projections tile the footprint either way.
  8. Order the bundles. The bundle count is the squares × (1 + waste) × 3 bundles per square, rounded up — 1 bundle covers 33.33 sq ft. Check the coverage per bundle for your exact shingle before you order: architectural shingles can pack differently from three-tab, and the supplier's figure governs.
  9. Check the covering verdict. The result lists which coverings the IRC allows at your pitch and which it does not. Below 2:12, asphalt shingles are out entirely and the roof needs metal or a membrane; from 2:12 to just under 4:12 shingles need double underlayment; at 4:12 and above they go on with standard underlayment.
  10. Check whether the roof is walkable. At 4:12 and below the roof is low-slope and walkable; at 5:12–6:12 it is walkable with care and a harness is wise; at 7:12 and above OSHA calls it steep-slope and fall protection is required. The pitch decides the safety plan, not just the materials.
  11. Use the link. The page keeps your inputs in the address bar, so the Copy link button gives you a link that reopens the same building and pitch — useful for comparing two pitches on the same house, or for sending the numbers to your roofer.

Roof Pitch Calculator — What Is My Roof Pitch? Pitch, Angle & Shingle Quantities formula

Pitch (x:12) = rise ÷ run × 12 — rise and run in the same units; the run is half the building width on a symmetric gable

Roof angle = arctan(rise ÷ run) · Grade = rise ÷ run × 100%

Slope factor (multiplier) M = √(1 + (x/12)²) — the number that turns horizontal run into sloped length and flat footprint into roof area

Rise = run × x ÷ 12

Unit rafter = 12 × M inches per 12 in of run — the rafter length for one foot of run, the way a framing square reads it

Theoretical rafter = √(run² + rise²) = run × M — ridge centreline to wall plate, no overhang, no ridge deduction

Actual rafter = (run + eave overhang) × M — the overhang grows along the slope, not inch for inch

Hip / valley factor = √(2 + (x/12)²) per foot of common run (regular hip, equal pitches) · hip rafter = run × hip factor · with overhang (run + eave overhang) × hip factor

Slope length = (run + eave overhang) × M · eave length = building length + 2 × gable overhang

Gross roof area = 2 × slope length × eave length — the same for a gable and a hip roof at the same footprint and pitch, because the slope projections tile the footprint either way

Net roof area = gross roof area − deductions

Squares = net roof area ÷ 100 sq ft (1 square = 100 sq ft = 9.2903 m²)

Squares to order = squares × (1 + waste), rounded up

Shingle bundles = squares × (1 + waste) × 3, rounded up — 1 bundle = 33.33 sq ft = 3.0968 m²

IRC minimum slopes (2021 IRC R905): asphalt shingles 2:12, double underlayment 2:12–<4:12 (R905.2.2) · clay/concrete tile 2.5:12, double underlayment 2.5:12–4:12 (R905.3.2) · metal shingles 3:12 (R905.4.2) · mineral-surfaced roll roofing 1:12 (R905.5.2) · slate 4:12 (R905.6.2) · wood shingles/shakes 3:12 (R905.7.2/R905.8.2) · metal panels lapped 3:12, sealed laps 1/2:12, standing seam 1/4:12 (R905.10.2) · membranes 1/4:12, coal-tar 1/8:12 (R905.9–R905.13)

1 ft = 0.3048 m · 1 m² = 10.7639 sq ft · 1 square = 100 sq ft = 9.2903 m². A phone level or clinometer reads the angle to about ±1° — enough to tell a 4/12 from a 6/12, not enough to order materials by.

Worked example

Worked example — 40 × 30 ft house, 6/12 pitch, 12 in eave overhang, 12 in gable overhang, 10% waste, gable roof. This is the tool’s default, worked by hand so you can check it. It reproduces the field benchmark's canonical example exactly.

  1. Run and rise: run = 30 ÷ 2 = 15 ft; rise = 15 × 6 ÷ 12 = 7.5 ft.
  2. Slope factor: M = √(1 + (6/12)²) = √1.25 = 1.1180. Angle = arctan(0.5) = 26.57°; grade = 50%.
  3. Unit rafter: 12 × 1.1180 = 13.42 in of rafter per 12 in of run.
  4. Theoretical rafter: 15 × 1.1180 = 16.77 ft (16 ft 9-1/4 in) — ridge centreline to wall plate, no overhang.
  5. Actual rafter: (15 + 1) × 1.1180 = 17.89 ft (17 ft 10-11/16 in) — the 12 in overhang adds 13.42 in along the slope.
  6. Hip rafter: factor √(2 + 0.25) = 1.500, so 15 × 1.5 = 22.50 ft (24.00 ft with the overhang).
  7. Roof area: slope length 17.89 ft × eave length (40 + 2 × 1) = 42 ft × 2 slopes = 1,502.6 sq ft — 1,503 sq ft (139.6 m²).
  8. Squares: 1,502.6 ÷ 100 = 15.03 squares; with 10% waste, 15.03 × 1.10 = 16.53 → 17 squares to order.
  9. Shingle bundles: 15.03 × 1.10 × 3 = 49.59 → 50 bundles at 10% waste (52 at 15%, 55 at 20%).
  10. Covering verdict: asphalt shingles allowed with standard single underlayment (6/12 is above 4:12); tile, metal, slate and wood all allowed. The roof is walkable with care — 5:12–6:12 is not yet OSHA steep-slope (7:12).

Same roof, no gable overhang (the other source's convention). With the gable overhang set to 0, the eave length is 40 ft and the area is 2 × 17.89 × 40 = 1,431.1 sq ft = 14.31 squares, and the bundles are 48 at 10% waste. That is why the two published examples disagree — one counts the gable overhang and the other does not — and this page lets you pick which convention your roofer uses.

Second worked example — 24 ft wide gable, 6/12, no overhang. Run = 12 ft, rise = 6 ft, slope factor 1.1180, so the theoretical rafter is √(12² + 6²) = 13.42 ft (13 ft 5 in) — the figure the field's rafter tables quote for a 24 ft gable at 6/12.

Third worked example — 28 × 40 ft, 6/12, 24 in eave overhang, no gable overhang. Run = 14 ft; slope length = (14 + 2) × 1.1180 = 17.89 ft; eave length 40 ft; area = 2 × 17.89 × 40 = 1,431.08 sq ft = 14.31 squares; bundles = 14.31 × 1.10 × 3 = 47.23 → 48 bundles at 10% waste, and 14.31 × 1.15 × 3 = 49.37 → 50 bundles at 15% — the published figures, reproduced exactly.

Metric twin — 12 × 9 m, 6/12, 30 cm eave overhang, 30 cm gable overhang. Run = 4.5 m, rise = 2.25 m, slope factor 1.1180; theoretical rafter 4.5 × 1.1180 = 5.03 m; actual rafter (4.5 + 0.3) × 1.1180 = 5.37 m; slope length 5.37 m × eave length 12.6 m × 2 = 135.24 m² (1,455.7 sq ft) = 14.56 squares; bundles = 14.56 × 1.10 × 3 = 48.04 → 49 bundles at 10% waste.

Low pitch — 30 × 40 ft at 2:12, no overhang. M = 1.0138, angle 9.46°, grade 16.7%; the roof is walkable and the area is 1,216.5 sq ft (12.17 squares, 41 bundles at 10%), but asphalt shingles are allowed only with double underlayment (IRC R905.2.2) — and many manufacturers will not warrant them this low. Below 2:12, shingles are out entirely.

Roof pitch tables: pitch conversion, IRC minimum slopes, rafter lengths and shingle orders

Why the field agrees on the formulas and still disagrees on the answer. Every roof pitch calculator in the field uses the same five formulas — pitch = rise/run × 12, angle = arctan, grade = rise/run × 100%, multiplier = √(1 + (x/12)²), rafter = √(rise² + run²) — and they all give the same figures: 6/12 is 26.57°, 50.0% and a 1.118 multiplier on every page. The disagreements are about what to count: whether the gable-end overhang belongs in the roof area (one source counts it, another does not — a 72 sq ft difference on the worked example), whether the pitch minimum for shingles is 2:12 or 4:12 (it is 2:12, with double underlayment below 4:12 — the 4:12 figure is the single-underlayment threshold, not the shingle minimum), and whether a phone-tilt reading is a measurement (it is an estimate, ±1°). This page names each disagreement instead of picking one silently.

The 4/12 confusion, named. The field's #5 page says the minimum pitch for standard asphalt shingles is 4:12. That is wrong against the code: IRC R905.2.2 allows asphalt shingles at 2:12 and above, and requires double underlayment from 2:12 to just under 4:12. What 4:12 actually is: the pitch at which a single layer of underlayment becomes enough. Below 4:12 you need the double layer; below 2:12 you need a different covering. A page that states 4:12 as the shingle minimum is confusing the underlayment rule with the covering rule — and a roofer who believes it will turn down a 3:12 roof that the code allows.

Run is not the rafter — and span is not the run. The most common measuring mistake in roof pitch is entering the full building width where the run belongs. The run is half the span: on a 30 ft wide building the run is 15 ft, and a 6/12 pitch over a 15 ft run rises 7.5 ft. Enter 30 ft as the run and the tool reads a 3/12 pitch and a rafter half as long as it should be. The second mistake is the reverse: reading the rafter length off the roof and calling it the run. The rafter is the hypotenuse — longer than the run by the slope factor — so a 16.77 ft rafter on a 6/12 roof covers a 15 ft run, not a 16.77 ft one. This page halves the width for you, and in rise + run mode it checks the run you enter against half the width and says so if they disagree.

Pitch, slope and angle are three names for one roof. Pitch is rise per 12 in of run (6/12); slope is the same ratio as a percent (50%); angle is the same ratio as degrees (26.57°). They are not three different steepnesses, and a page that mixes them — quoting a 50% slope as a 50° angle, for instance — is wrong by a factor of two. The conversion table below lists all three side by side so you can check any of them against the other two.

Pitch conversion table (1:12–24:12). Slope factor = √(1 + (x/12)²); hip/valley factor = √(2 + (x/12)²); unit rafter = rafter length per 12 in of run.

PitchAngleGradeSlope factorHip / valley factorUnit rafter
1/124.76°8.3%1.0031.41712.04 in
2/129.46°16.7%1.0141.42412.17 in
3/1214.04°25.0%1.0311.43612.37 in
4/1218.43°33.3%1.0541.45312.65 in
5/1222.62°41.7%1.0831.47413.00 in
6/1226.57°50.0%1.1181.50013.42 in
7/1230.26°58.3%1.1581.53013.89 in
8/1233.69°66.7%1.2021.56314.42 in
9/1236.87°75.0%1.2501.60115.00 in
10/1239.81°83.3%1.3021.64115.62 in
12/1245.00°100.0%1.4141.73216.97 in
14/1249.40°116.7%1.5371.83318.44 in
16/1253.13°133.3%1.6671.94420.00 in
18/1256.31°150.0%1.8032.06221.63 in
24/1263.43°200.0%2.2362.44926.83 in

IRC minimum slopes by covering (2021 IRC R905). Code minimums are floors, not recommendations — a manufacturer can require more, and your local amendments can too.

CoveringMinimum pitchIRC sectionNote
Asphalt shingles2:12R905.2.2Double underlayment 2:12 to just under 4:12
Clay / concrete tile2.5:12R905.3.2Double underlayment 2.5:12 to 4:12
Metal shingles3:12R905.4.2—
Mineral-surfaced roll roofing1:12R905.5.2—
Slate shingles4:12R905.6.2—
Wood shingles3:12R905.7.2—
Wood shakes3:12R905.8.2—
Metal panels, lapped3:12R905.10.2Exposed-fastener panels
Metal panels, sealed laps1/2:12R905.10.2Sealant at the laps
Metal panels, standing seam1/4:12R905.10.2—
Built-up / modified bitumen / single-ply membrane1/4:12R905.9–R905.13—
Coal-tar built-up1/8:12R905.9The lowest slope the code allows

Rafter length by building width (ridge centreline, no overhang). Theoretical rafter = run × slope factor; add the overhang along the slope for the cut length, and take the ridge deduction from the rafter length calculator.

Building width4/12 rafter6/12 rafter8/12 rafter
20 ft10.54 ft11.18 ft12.02 ft
24 ft12.65 ft13.42 ft14.42 ft
28 ft14.76 ft15.65 ft16.83 ft
32 ft16.87 ft17.89 ft19.23 ft
36 ft18.97 ft20.12 ft21.63 ft
40 ft21.08 ft22.36 ft24.04 ft

Shingle order math — squares to bundles. 1 square = 100 sq ft; 1 bundle = 33.33 sq ft (3 bundles per square); bundles = squares × (1 + waste) × 3, rounded up.

Roof areaSquaresBundles @10%Bundles @15%Bundles @20%
1,000 sq ft10333536
1,500 sq ft15505254
2,000 sq ft20666972
2,500 sq ft25838790
3,000 sq ft3099104108

Walkable or steep? At 4:12 and below the roof is low-slope by OSHA's definition and walkable; at 5:12–6:12 it is walkable with care — a harness is wise and a slip is a slide; at 7:12 and above OSHA calls it steep-slope (29 CFR 1926.500) and fall protection is required. The pitch decides the safety plan: a 6/12 roof takes a careful walk, a 9/12 roof takes roof jacks, a harness and a professional.

Measurement tips

  • Measure the pitch in two places. A roof that has sagged reads steeper at the ridge than at the eave, and a rafter that has bowed reads differently from the deck. Measure rise over 12 in at the eave and again near the ridge — if they disagree by more than half a pitch step, the roof has moved and the structure needs a look before the covering does.
  • Measure rise over a level, not along the rafter. The run is horizontal and the rise is vertical — a tape laid along the rafter measures the hypotenuse, which is longer than the run by the slope factor. Hold a level horizontal, mark 12 in along it, and measure straight down to the roof. A reading taken along the slope is the rafter length, not the pitch.
  • Use the gable overhang the way your roofer does. Some roofers count the gable-end overhang in the roof area and some do not — the difference is about 5% on the worked example. Ask which convention the quote uses before you compare two quotes, or you will be comparing a 15-square roof with a 14.3-square one and thinking one roofer is cheaper.
  • Order bundles, not squares, and check the bundle. Squares are the unit roofers talk in; bundles are the unit suppliers sell in — and 1 bundle is 33.33 sq ft only for the standard three-bundle square. Some architectural shingles pack four bundles to the square, and some metric shingles cover a different area entirely. Confirm the coverage on the pallet tag before you convert.
  • Pick the waste by the roof, not by habit. A simple gable takes 10%; a hip roof or a roof with valleys takes 15%; a cut-up roof with dormers, valleys and skylights takes 20%. The waste is not a fudge factor — it is the starter course, the ridge caps, the valley cuts and the boards that arrive damaged, and a roof ordered at 10% waste with three valleys runs short on the last slope.
  • Check the covering before the pitch check. A 3:12 roof takes shingles with double underlayment, tile with double underlayment, metal or wood — but not slate, which needs 4:12. A 2:12 roof takes shingles only with double underlayment and a manufacturer willing to warrant them. The covering decision and the pitch decision are the same decision, made once.
  • Keep the pitch when you re-roof. Changing the pitch means changing the rafters, the ridge and the walls below them — it is a structural job, not a roofing job. If the existing pitch is too low for the covering you want, the honest options are a covering that works at that pitch or a structural redesign, not a steeper shingle laid on a flat deck.
  • Use the slope factor for every area on the roof. The same multiplier that turns footprint into roof area turns a skylight's plan size into its flashing area and a valley's plan length into its cut length. Once you know the pitch, every sloped measurement on that roof is the flat measurement × 1.118 at 6/12 — including the gutters' drip edge, which runs along the slope.
  • Write the pitch on the quote. A quote that says “roofing, 1,500 sq ft” without a pitch cannot be checked: at 4:12 the roof is 1,581 sq ft and at 8:12 it is 1,803 sq ft, and the same house prices 14% apart. A quote with the pitch, the squares and the bundle count on it is a quote you can verify against this page.
  • Measure the angle as a cross-check, not the primary. A phone level or a clinometer is a good way to confirm a tape measurement — 26.57° against a measured 6/12 — but a poor way to make one, at about ±1°. If the phone says 27° and the tape says 6/12, trust the tape; if the phone says 32° and the tape says 6/12, measure again.

Common mistakes

  • Entering the span as the run. The run is half the building width. On a 30 ft wide building the run is 15 ft — enter 30 ft as the run and the tool reads a 3/12 pitch, a 3.75 ft rise and a rafter half as long as it should be. Half the width first, then the pitch.
  • Believing 4:12 is the shingle minimum. The field's #5 page states it, and it is wrong: IRC R905.2.2 allows asphalt shingles at 2:12 and above, with double underlayment below 4:12. The 4:12 figure is the single-underlayment threshold. A roofer who believes 4:12 is the minimum will refuse a 3:12 roof the code allows.
  • Forgetting the overhang. A 12 in overhang adds 13.4 in of rafter at 6/12 and about 72 sq ft of roof area on the worked example — 5% of the roof. Order by the footprint alone and the last slope runs short; the overhang is roof, and it needs shingles, underlayment and drip edge like the rest.
  • Ordering by squares without waste. 15.03 squares is not 15 squares to order — it is 17 at 10% waste, and the bundles are 50, not 45. The waste is the starter course, the ridge caps and the valley cuts; a roof ordered without it runs short on the last slope, and a half-square top-up order costs more in delivery than the shingles.
  • Mixing up pitch, grade and angle. 6/12 is a 50% grade and a 26.57° angle — not a 50° angle and not a 26.57% grade. A drawing that says 50% and a level that says 26.57° describe the same roof; a page that treats them as different steepnesses is wrong by a factor of two.
  • Trusting a phone-tilt reading to order by. The field's #1 page is built on a phone tilt, and it is an estimate to about ±1° — enough to tell a 4/12 from a 6/12, not enough to order materials by. A 1° error at 6/12 reads as a 6.3/12 pitch — half a pitch step off — and the area and the bundle count follow it. Measure with a level and a tape for the number you order by.
  • Using the rafter length as the run. The rafter is the hypotenuse — longer than the run by the slope factor. A 16.77 ft rafter on a 6/12 roof covers a 15 ft run. Feed the rafter length in as the run and the pitch comes out a full step low.
  • Assuming a hip roof has more area than a gable. It does not, at the same footprint and pitch: the slope projections tile the footprint either way, so the slope area is footprint × slope factor for both shapes. What a hip roof has is more waste — more cuts at the hips — which is why it takes 15% waste instead of 10%, not more squares.
  • Ignoring the manufacturer's minimum. The IRC is the floor, and a shingle maker can require more: many architectural shingles are warranted only at 4:12 and above even though the code allows 2:12 with double underlayment. A roof that meets the code and voids the warranty is a roof that meets the wrong standard — check the product's own instructions.
  • Walking a steep roof like a flat one. At 7:12 and above OSHA calls the roof steep-slope and fall protection is required — a harness, roof jacks or a professional. A 9/12 roof is not a 4/12 roof with more effort; it is a different job, and the pitch decides the safety plan before the first bundle goes up.

Factors that affect accuracy

  • Pitch — the multiplier for everything. The slope factor turns footprint into roof area and run into rafter length: at 4/12 it is 1.054, at 6/12 it is 1.118, at 12/12 it is 1.414. The same house is 1,581 sq ft of roof at 4:12 and 1,803 sq ft at 8:12 — a 14% swing from the pitch alone.
  • Building footprint — length × width. The roof area is the footprint × slope factor, with the overhangs added. A foot of length is worth a full slope-width of area; a foot of width is worth half a slope-length on each side. Measure outside wall to outside wall — inside measurements make every rafter short by the wall thickness × slope factor.
  • Eave overhang — along the slope. The overhang extends the rafter by overhang × slope factor, not inch for inch: 12 in of overhang is 13.4 in of rafter at 6/12 and 17 in at 12/12. It also adds area — about 5% on the worked example — and it needs shingles, underlayment and drip edge like the rest of the roof.
  • Gable-end overhang — the convention that moves 5%. Whether the gable overhang counts in the roof area is the one place the field disagrees: one source counts it and another does not. This page counts it as a separate input, so both published worked examples reproduce exactly — and the quote should say which convention it uses.
  • Deductions — skylights and chimneys. Large openings come off the roof area before the squares are counted; small vents do not — they are absorbed by the waste allowance. Deduct a skylight's plan area × slope factor, not its plan area: the opening is on the slope, and the slope is bigger than the plan by the multiplier.
  • Waste allowance — by the roof's shape. 10% for a simple gable, 15% for a hip roof or a roof with valleys, 20% for a cut-up roof. The waste is the starter course, ridge caps, valley cuts and damaged boards — a hip roof wastes more because every hip is a cut, not because it has more area.
  • Covering — the pitch decides it. Below 2:12 no shingles at all; 2:12–4:12 shingles only with double underlayment; below 2.5:12 no tile; below 3:12 no metal shingles or wood; below 4:12 no slate. At 1/4:12 only standing-seam metal and membranes remain. The covering and the pitch are decided together.
  • Roof shape — same area, different waste. A hip roof of the same footprint and pitch has the same slope area as a gable roof — the projections tile the footprint either way — but it wastes more shingles at the hips, so it takes 15% waste against a gable's 10%. The shape changes the waste and the rafters, not the squares.
  • Bundle coverage — check the pallet. One bundle is 33.33 sq ft only for the standard three-bundle square. Architectural shingles can pack four to the square, and metric shingles cover a different area entirely. The supplier's coverage figure governs the order, whatever the rule of thumb says.
  • Walkability — the safety factor. At 4:12 and below the roof is low-slope and walkable; at 5:12–6:12 it is walkable with care; at 7:12 and above OSHA calls it steep-slope and fall protection is required. The pitch decides whether the job is a walk, a harness job or a professional's job.

Sources & assumptions

  • Method — pitch = rise ÷ run × 12 · angle = arctan(rise ÷ run) · grade = rise ÷ run × 100% · slope factor M = √(1 + (x/12)²) · rafter = √(rise² + run²) · hip/valley factor = √(2 + (x/12)²). 6/12 = 26.57°, 50.0%, M 1.118, hip 1.500 on every page in the field. Confirmed 2026-11-18 against RoofPitchCalculatorApp's roof pitch calculator (phone-tilt mode + drag-the-peak visualizer + 1:12–24:12 table), PonderLoop's roof pitch calculator (updated 2026-10-22), LevelCalc's roof pitch calculator and RoofPitch.net's pitch chart — all agree on every figure, including the full 1:12–24:12 table reproduced on this page. The same figures are on this site's roofing calculator and rafter length calculator.
  • Roof area — slope area = plan area × slope factor, with the overhangs added: slope length = (run + eave overhang) × M, eave length = building length + 2 × gable overhang, gross area = 2 × slope length × eave length. The same formula serves a gable and a hip roof at the same footprint and pitch, because the slope projections tile the footprint either way — a geometric identity, not an approximation.
  • Overhang convention — this page's labelled choice, because the two sources differ: the eave overhang extends the slope and the gable-end overhang extends the eave length, as separate inputs. Ponderloop counts the gable overhang (40 × 30 ft, 12 in overhangs, 6:12 → 1,503 sq ft); nrtechstudio's worked example does not (28 × 40 ft, 24 in eave overhangs, 6:12 → 1,431.08 sq ft). Both reproduce exactly on this page with the matching gable-overhang input, and the difference is named on the page.
  • IRC minimum slopes (2021 IRC R905) — confirmed 2026-11-18 against Tyler Barndominiums' IRC R905 slope calculator, NailTheMath's roof pitch guide and Building Code Trainer's minimum-slope guide — all agree on every section: asphalt shingles 2:12, double underlayment 2:12 to just under 4:12 (R905.2.2); clay/concrete tile 2.5:12, double underlayment 2.5:12–4:12 (R905.3.2); metal shingles 3:12 (R905.4.2); mineral-surfaced roll roofing 1:12 (R905.5.2); slate 4:12 (R905.6.2); wood shingles 3:12 (R905.7.2); wood shakes 3:12 (R905.8.2); metal panels lapped 3:12, sealed laps 1/2:12, standing seam 1/4:12 (R905.10.2); membranes 1/4:12, coal-tar 1/8:12 (R905.9–R905.13).
  • The 4/12 error, flagged on the page — RoofPitch.net's chart states the minimum pitch for standard asphalt shingles is 4:12. That is wrong against the code: 4:12 is the single-underlayment threshold (R905.2.2), not the shingle minimum, which is 2:12 with double underlayment below 4:12. The page names the error rather than repeating it.
  • Walkability — OSHA defines steep-slope as 7:12 and above (29 CFR 1926.500) and low-slope as 4:12 and below; confirmed 2026-11-18 against RoofPitch.net's chart and NailTheMath (citing 29 CFR 1926.500). This page's verdicts: ≤4:12 low-slope and walkable; 5:12–6:12 walkable with care; ≥7:12 steep, fall protection required.
  • Order math — 1 square = 100 sq ft (9.2903 m²); 1 bundle = 33.33 sq ft (3.0968 m²); squares = net area ÷ 100; squares to order = squares × (1 + waste), rounded up; bundles = squares × (1 + waste) × 3, rounded up; waste 10% simple gable, 15% hip/valley, 20% cut-up roof. Confirmed 2026-11-18 against PonderLoop and nrtechstudio's shingle estimator.
  • Phone-tilt accuracy — a phone level or clinometer reads the angle to about ±1°, enough to tell a 4/12 from a 6/12 but not enough to order materials by. The field's #1 page is built on a phone tilt; this page treats it as an estimate and measures rise over a 12 in run with a level and a tape for the ordering figure.
  • Canonical example (this tool): 40 × 30 ft, 6/12, 12 in eave overhang, 12 in gable overhang, 10% waste, gable — run 15 ft, rise 7.5 ft, M 1.1180, angle 26.57°, grade 50%, unit rafter 13.42 in per 12 in of run, theoretical rafter 16.77 ft (16 ft 9-1/4 in), actual rafter 17.89 ft (17 ft 10-11/16 in), hip factor 1.500, hip rafter 22.50 ft (24.00 ft with overhang), slope length 17.89 ft, eave length 42 ft, gross area 1,502.6 sq ft (139.6 m²), 15.03 squares, 17 squares to order, 50 bundles @10% (52 @15%, 55 @20%). 24 ft gable, 6/12, no overhang: theoretical rafter 13.42 ft (13 ft 5 in). 28 × 40 ft, 6/12, 24 in eave overhang, no gable overhang: 1,431.08 sq ft = 14.31 squares, 48 bundles @10%, 50 @15%. Metric twin: 12 × 9 m, 6/12, 30 cm overhangs → run 4.5 m, rise 2.25 m, theoretical rafter 5.03 m, actual rafter 5.37 m, 135.24 m² (1,455.7 sq ft), 14.56 squares, 49 bundles @10%. Low pitch 2:12, 30 × 40 ft, no overhang: 1,216.5 sq ft, 12.17 squares, 41 bundles @10%, shingles only with double underlayment.

Figures checked on 28 November 2026 as part of the site-wide test run (3239 automated checks, all passing). See how we calculate and test.

Please note: material estimates are approximate. Always confirm product coverage with the manufacturer and buy a little extra for cuts, waste and future repairs.

What this calculator doesn't do

  • This tool sizes a symmetric gable or hip roof of one pitch. It assumes both roof planes meet at the same pitch with level eaves, and that the run is half the building width. Unequal pitches, saltbox and mansard roofs, dormers, crickets and roofs with a structural ridge beam need a drawing or framing software — a single-pitch formula cannot describe them.
  • It gives you the pitch and the quantities, not the structure. Whether a rafter is deep enough for its span, and whether the roof can carry its snow load, comes from the IRC span tables and the design snow load — use the rafter length calculator for the cut length and the roof snow load calculator for the load. This page never sizes rafter depth.
  • The IRC minimums are code floors, not recommendations — and the code is the floor, not the ceiling. A manufacturer can require a steeper pitch than the IRC allows, and a low-slope installation can void a shingle warranty even when the code permits it. Your local building department's amendments and the shingle maker's own instructions govern over any figure on this page.
  • The phone-tilt and clinometer methods the field's #1 page is built on are estimates, not measurements. A phone level or a clinometer held against a rafter is typically accurate to about ±1° — enough to tell a 4/12 from a 6/12, not enough to order materials by. Measure rise over a 12 in run with a level and a tape for the number you order by.
  • The roof area is the slope area from the plan footprint — it does not add for valleys, hips, ridges or starter courses, and it does not subtract for small vents. The waste allowance (10/15/20%) is what absorbs those: use 15% on a hip roof or a roof with valleys, 20% on a cut-up roof, and check the bundle count against your supplier's coverage for the exact shingle — coverage per bundle varies by product.
  • The gable-end overhang is a separate input because the field disagrees about it: one source counts it in the roof area and another does not. This page counts the eave overhang on the slope and the gable overhang on the eave length, separately, so both published worked examples reproduce exactly — and the difference is named on the page rather than hidden.

Roof Pitch Calculator — What Is My Roof Pitch? Pitch, Angle & Shingle Quantities — frequently asked questions

How do I calculate roof pitch?

Measure the rise over a 12 in run, and divide: pitch = rise ÷ run × 12. Set a level on the roof, mark 12 in along it, and measure straight down to the roof surface at the mark — a 6 in drop is a 6/12 pitch. Or take the building width and the ridge height: on a 30 ft wide building with a 7 ft 6 in ridge rise, the run is 15 ft and (7.5 ÷ 15) × 12 = 6/12. Enter either form above and the tool gives you the pitch as x:12, degrees and percent together.

What is my roof pitch?

Measure it with a level and a tape: rise over a 12 in run. Hold a level horizontal on the roof (or on a rafter in the attic), mark 12 in along the level, and measure down to the roof at the mark — the drop in inches is your pitch. A 4 in drop is 4/12, a 6 in drop is 6/12, a 12 in drop is 12/12. A phone level or clinometer gives the same roof as an angle — 26.57° is 6/12 — but to about ±1°, so use it as a cross-check and the tape as the measurement.

What is a 6/12 roof pitch in degrees?

26.57° — and a 50% grade, with a slope factor of 1.118. The angle is arctan(6 ÷ 12) = arctan(0.5) = 26.57°; the grade is 6 ÷ 12 × 100% = 50%; the multiplier is √(1 + 0.25) = 1.118. The same conversions: 4/12 is 18.43° and 33.3%, 8/12 is 33.69° and 66.7%, 12/12 is 45° and 100%. The full table is on this page.

How many squares is my roof?

Roof area ÷ 100 sq ft. A 40 × 30 ft house at 6/12 with 12 in overhangs is 1,503 sq ft, or 15.03 squares — and 17 squares to order at 10% waste. A 28 × 40 ft roof at the same pitch with 24 in eave overhangs and no gable overhang is 1,431 sq ft, or 14.31 squares. Enter your building above for your exact figure, in square feet, square metres and squares.

How many shingle bundles do I need?

Squares × (1 + waste) × 3, rounded up. The worked example — 15.03 squares at 10% waste — needs 50 bundles (52 at 15%, 55 at 20%). A 1,500 sq ft roof needs 50 bundles at 10% waste, a 2,000 sq ft roof needs 66, and a 2,500 sq ft roof needs 83. One bundle covers 33.33 sq ft, so three bundles make a square — but check the coverage on your exact shingle, because some architectural shingles pack four to the square.

What is the minimum roof pitch for shingles?

2:12 for asphalt shingles — with double underlayment from 2:12 to just under 4:12 (IRC R905.2.2). At 4:12 and above they go on with standard single underlayment. Below 2:12 shingles are not allowed at all, and the roof needs metal or a membrane. The “minimum 4/12” figure some pages quote is wrong: 4:12 is the single-underlayment threshold, not the shingle minimum — a 3:12 roof takes shingles with double underlayment, and the code allows it.

How long is a rafter on a 24 ft wide house at 6/12 pitch?

13.42 ft (13 ft 5 in) from the ridge centreline to the wall plate, with no overhang — run 12 ft × slope factor 1.118. With a 12 in overhang it is (12 + 1) × 1.118 = 14.53 ft. For the cut length with the ridge deduction and the birdsmouth check, use the rafter length calculator — this page gives the length, that page gives the cut.

What pitch roof can you walk on?

At 4:12 and below the roof is low-slope and walkable; at 5:12–6:12 it is walkable with care; at 7:12 and above OSHA calls it steep-slope (29 CFR 1926.500) and fall protection is required. A 6/12 roof takes a careful walk with a harness wise; a 9/12 roof takes roof jacks, a harness and a professional. The pitch decides the safety plan, not just the materials — and a roof that is walkable when dry is not walkable when wet, whatever the pitch.

How do I calculate roof pitch in metres? (metric)

The same way: pitch = rise ÷ run × 12, in any units. A 9 m wide building has a 4.5 m run; if the ridge rises 2.25 m above the eaves, (2.25 ÷ 4.5) × 12 = 6/12 — 26.57° and a 50% grade. The slope factor is unit-free, so the roof area is footprint × 1.118 in square metres too: a 12 × 9 m house at 6/12 with 30 cm overhangs is 135.24 m² (1,455.7 sq ft), or 14.56 squares, and needs 49 bundles at 10% waste.

How many squares is a 135 m² roof? (metric)

14.56 squares. One square is 100 sq ft, which is 9.2903 m², so 135.24 m² ÷ 9.2903 = 14.56 squares — and at 10% waste that is 14.56 × 1.10 × 3 = 48.04 → 49 bundles. A 100 m² roof is 10.76 squares (36 bundles at 10% waste) and a 200 m² roof is 21.53 squares (72 bundles). Enter the building in metres above and the tool gives you the area in square metres, square feet and squares together.

Next step

Take the pitch, the squares and the bundle count to your roofer or supplier — and check the coverage per bundle for your exact shingle before you order, since it varies by product. Then get the cut length for each rafter with the rafter length calculator, and check the snow load the pitch carries with the roof snow load calculator.

Save this estimate: use the Copy link button in the results box above to share these exact inputs, or Print results for a paper copy to take to the store.