How Much Does Fill Dirt Cost in 2026?

Quick answer: Fill dirt costs $8–$25 per cubic yard delivered in 2026, and most homeowners pay about $12–$15 per yard for clean unscreened fill (HelloGravel, 2026). Angi puts the national average for a whole fill-dirt project at $842, with most jobs landing between $344 and $1,340 (4,281 verified projects, updated September 15, 2026). A 10–15 cubic yard truckload runs $150–$600 delivered. Every price here is a planning estimate, not a quote — compare two local delivered totals before you order.

Fill dirt is the cheapest material on most landscaping quotes, and also the one most often ordered wrong — because it is sold by the yard, by the ton and by the truckload, and the cheapest headline price is rarely the cheapest delivered total. A yard of fill is also not a fixed weight: the same cubic yard weighs about 1.0 ton dry and about 1.4 tons moist, and wet clay can reach 1.5 tons, so a quote priced by the ton moves with the weather. This guide prices fill dirt all three ways, shows where delivery and minimums hide, works a real 20 × 30 ft low spot end to end, and tells you when bags beat bulk — so the pile that arrives is the pile you paid for.

Fill dirt cost per cubic yard by type (2026)

Angi's 2026 table by type is the cleanest reference, because the type — not the supplier — is what sets the price:

Fill dirt typePer cubic yard (2026)What it is
Unscreened$8–$15Basic fill, may contain rocks and debris
Screened$12–$20Sifted for debris; smoother finish
Structural / engineered$15–$25Tested for compaction and stability
Specialty blends$18–$25Custom mix for drainage or a specific use

Angi's second table, by material quality, tells the same story from the other side: clean fill — no contaminants, no organic matter, a stable base — runs $10–$18 per cubic yard; mixed fill, which may contain rocks or organics, costs less at $8–$13 but can settle unpredictably; engineered fill, certified for compaction and drainage, runs $16–$25. The spread between the cheapest and dearest fill is roughly 3×, which is why "fill dirt" without a type attached is not a price at all.

Other publishers agree on the band, not the exact number. HomeGuide puts fill dirt at $5–$25 per cubic yard and topsoil at $10–$50; Lawn Love prices fill at $6–$17; HelloGravel's 2026 guide puts the typical range at $8–$25 and says most homeowners pay $12–$15, with structural fill at $15–$30, clean fill at $12–$20, subsoil at $8–$15 and common fill at $5–$12. Read the range as the market, and the $12–$15 midpoint as the price most residential jobs actually land on — then get your local delivered total, because the per-yard price is only half the bill.

What a whole fill-dirt project costs

The per-yard price is small; the project total is what matters, and Angi's 2026 project figures frame it: a national average of $842, most homeowners paying $344–$1,340, and a full range of $125–$3,000 depending on project size and delivery fees. Angi's own size table prices a small 5-cubic-yard job — filling a garden bed or a hole — at $40–$125 in material. The table below works the same arithmetic out to bigger jobs, using the typical $12–$15 per yard material band and the $50–$150 delivery fee from the next section:

Order sizeTypical useMaterial ($12–$15/yd³)Delivered total*
5 yd³Fill a hole, small garden bed$60–$75$110–$225
10 yd³Level a patio base, small low spot$120–$150$170–$300
15 yd³Raise a low corner, regrade a section$180–$225$230–$375
20 yd³Regrade a whole backyard section$240–$300$290–$450

*Delivered total = material plus a $50–$150 delivery fee. Delivery is often waived on orders of 10 yards or more within about 10 miles of the supplier yard, so the low end of the bigger rows can drop by the whole fee — ask whether the quote is delivered or pickup before comparing. The gap between these material-plus-delivery totals and Angi's $842 project average is labour: spreading, grading and compaction, which the next sections price separately. A pile dumped on the driveway is cheap; a finished, level grade is the $842 job.

Delivery, minimums and truckloads

Delivery is a flat fee, not a per-yard rate, and it is where small orders get expensive. Three independent 2026 guides agree on the figure: delivery runs $50–$150 per drop within about 10 miles of the supplier yard (HelloGravel, UseCalcPro and HomeBuild Atlas), and UseCalcPro notes it is often waived on orders of 10 yards or more within that radius. On a 5-yard order at $15 a yard, a $100 delivery fee more than doubles the material cost — which is exactly why suppliers set minimums.

Minimums and small-load charges. Most bulk suppliers require a 6–10 cubic yard minimum for dump-truck delivery (UseCalcPro). Below that minimum, expect a $50–$100 small-load upcharge or a referral to bagged fill at retail. That is the honest reason small jobs should buy bags: the supplier would rather not send a truck for two yards, and charges you for the trouble if it does.

Truckloads. A full dump-truck load of 10–15 cubic yards costs $150–$600 delivered (HomeBuild Atlas); HomeGuide puts a 10–14 yard load at $150–$400 delivered. The truck is a weight limit as much as a volume: at this site's mixed-fill density of 1.22 tons per yard, a full 12-cubic-yard tri-axle load weighs 14.66 tons, and a 20-yard load weighs 24.44 tons — and legal payload limits often cap a load before the box is full. Confirm the truck size and payload that will actually arrive, and keep a loaded tandem off septic fields, thin pavement and irrigation lines.

Bulk vs bagged — when bags win

Bags look cheap at $3–$6 each and ruinous by the yard, and both impressions are right. A 40-lb bag holds about 0.5 cubic feet, so one cubic yard — 27 cubic feet — takes about 54 bags. At $3–$6 a bag that is $162–$324 per cubic yard equivalent (UseCalcPro), roughly 10–20× the bulk price of $12–$15 a yard. The same arithmetic in topsoil form is $2–$5 a bag, or $35–$180 per cubic yard (NationalSiteMaterial). Bags are the most expensive dirt you can buy — and still the right choice for small jobs.

The break-even is about 2 cubic yards. Below roughly 2 yards (about 108 bags), bags win on convenience: no minimum order, no delivery fee, no pile on the driveway, and no small-load upcharge. Above that, bulk delivery is almost always cheaper even after the delivery fee, and the saving grows with every extra yard. The practical rule: if the job is one or two wheelbarrows of fill — a sunken paver, a low spot by the step, a hole where a tree came out — buy bags. If it is a low corner of the yard or a regrade, order bulk and pay the delivery fee once, with the compaction allowance in the first order, because a second delivery for a short order costs more per yard than ordering the allowance in the first place.

Worked example: raising a 20 × 30 ft low spot by 6 in

Take a low spot 20 ft by 30 ft — 600 sq ft — that needs raising 6 in, in mixed fill at $15 a yard with a $100 delivery fee. The volume is area times depth: 600 × 0.5 ft = 300 ft³, and 300 ÷ 27 = 11.11 cubic yards net. Fill shrinks when it is compacted, so add the 15% mixed-fill allowance this site's fill dirt calculator defaults to: 11.11 × 1.15 = 12.78 cubic yards to order. At the mixed-fill density of 1.22 tons per yard that is 15.61 US tons (14.17 tonnes), in 2 tri-axle truckloads at 12 yards each. The bill: 12.78 × $15 = $191.67 of material, plus $100 delivery, for $291.67 delivered. Every figure above was checked against the calculator engine itself — run your own area and depth through the fill dirt calculator before ordering.

The same method at other sizes. One cubic yard covers 108 sq ft at 3 in deep, 54 sq ft at 6 in (HomeGuide says 55 — the same figure, rounded) and 27 sq ft at 12 in. A 1,000 sq ft area at 6 in needs 18.52 yards net and 21.30 yards ordered at 15%, weighing 26.02 tons, in 2 truckloads. The shortcut for any rectangle is cubic yards = area in sq ft × depth in inches ÷ 324 — then add the compaction allowance for your soil: 10–15% for sandy fill, 15–20% for mixed fill, 20–25% for clay-heavy fill. Ordering the net volume only is the classic short order: the finished grade ends up low after the first rain and the first compactor pass.

Labour: spreading, grading and compaction

Material is the cheap half of a finished grade. Angi puts labour for fill-dirt work at $50–$150 per hour for excavation contractors, landscapers and grading specialists, depending on region and complexity. UseCalcPro's all-in figures show what that means in practice: a typical 10-yard clean-fill delivery with spreading runs $250–$600 total, and the same volume of screened topsoil with spreading lands at $400–$1,000.

Grading is priced by the square foot. HomeGuide puts land grading at $0.40–$2.00 per square foot, a small-lawn regrade at $500–$1,000, an average backyard at $1,000–$5,000, and the national average at $2,300; Angi's 2026 grading guide puts its national average at about $2,175 across 5,354 projects. Those grading totals include the machine time, the operator and the finish grade — not just the dirt. Get the grading and the dirt on separate lines of the same quote, so a cheap dirt price cannot hide an expensive spreading line.

Compaction is a method, not a hope. Build deep fills in 6–8 in compacted lifts, not one deep dump, and expect settling over 3–12 months — sandy soils stabilise in roughly 3–6 months, clay soils can take 12 months or more, and most settlement happens in the first few months. Do not lay a slab, driveway or finished lawn over fresh, uncompacted fill and expect it to stay level. Fill under a slab, driveway or foundation must be clean, low-organic, non-expansive material placed in thin compacted lifts to a specified density — often 95–100% of a Proctor test for structural work — and verified by testing; that is an engineer's specification, not a calculator's approval. And call 811 to mark buried utilities before you dig or regrade — hitting a line is the one fill-dirt mistake that can injure someone.

Fill dirt vs topsoil — don't buy the wrong one

Fill dirt and topsoil are both called "dirt" in conversation, and they differ by an order of magnitude in what they do. Fill dirt is low-organic subsoil for raising grade and backfilling; topsoil is the organic surface layer for planting. Nothing grows well in fill dirt, and topsoil is too soft and too expensive to use as structural fill. The prices show the difference: fill dirt at $8–$25 a yard delivered against screened topsoil at $25–$55 delivered (UseCalcPro) or $20–$50 (HomeBuild Atlas); HomeGuide puts topsoil at $10–$50 a yard.

The usual job needs both, in layers. Raise the grade with fill, then finish with a planting layer of topsoil on top: 4–6 in of topsoil for a new lawn, 12 in for a raised bed (the depths this site's topsoil calculator uses). Before placing structural fill, strip the organic topsoil layer first — typically 6–12 in (EarthDepot) — because organic matter buried under fill rots, settles and leaves a dip exactly where you did not want one. Order the fill first and the topsoil last, and price them as two materials: a quote that blends them into one "dirt" line is hiding the expensive half.

What drives the price up or down

Type. The single biggest lever: unscreened fill at $8–$15 a yard against structural or engineered fill at $15–$25, with specialty blends at $18–$25 (Angi). Pay for the type the job needs — structural fill under a driveway, screened fill for a finish grade, unscreened fill for a deep hole nobody will see — and never pay structural prices for a hole.

Distance and volume. Delivery is $50–$150 a drop and often waived at 10+ yards within 10 miles, so a bigger order can cost less per yard than a small one. Buying in bulk lowers the per-yard rate, and a second delivery for a short order costs more per yard than ordering the compaction allowance in the first place.

Moisture and weight. Fill dirt runs about 1.0–1.4 US tons per cubic yard dry-to-moist, and wet clay can reach about 1.5 tons. If your supplier prices by the ton rather than the yard, buying after heavy rain means paying for water — ask for their tons-per-yard figure and compare delivered totals, not headline rates.

Access and contamination. A dump truck that cannot reach the spot means wheelbarrow distance, and wheelbarrow distance is labour at $50–$150 an hour. Mixed fill with rocks or organic matter costs less per yard ($8–$13, Angi) but can settle unpredictably, which is why clean fill at $10–$18 is the safer base under anything that must stay level. Season matters too: off-peak ordering is cheaper, and frozen or saturated ground costs more to work.

Metric equivalents and how to use this guide abroad

Multiply any per-cubic-yard rate by 1.308 for the per-cubic-metre rate, because one cubic yard is 0.7646 m³: the typical $8–$25 per yard becomes $10–$33 per m³, and the most-common $12–$15 per yard becomes $16–$20 per m³. Density in metric is 1,300 kg/m³ for sandy fill, 1,450 kg/m³ for mixed fill (the default) and 1,600 kg/m³ for clay-heavy fill — 1.30, 1.45 and 1.60 tonnes per cubic metre. One cubic metre covers 6.67 m² at 15 cm deep, 10.00 m² at 10 cm and 3.33 m² at 30 cm.

Metric worked example. A 6 × 9 m low spot (54 m²) raised 15 cm needs 8.10 m³ net and 9.31 m³ ordered at the 15% mixed-fill allowance, weighing 13.51 tonnes, in 2 truckloads at 12 yards — the same job as the 20 × 30 ft example above, in metric units. Outside the US, convert currency, not just units: these are US national ranges in USD, and labour shares, soil types and delivery distances differ by market. Use this guide's structure — the type table, the project table, the delivery and minimum rules, the worked example — with local quotes for the numbers, and judge any local quote the same way: which type is it, is delivery folded in, and did it include the compaction allowance?

Sources & further reading

Manufacturer and trade-association references for the materials and methods covered in this guide:

Frequently asked questions

How much does fill dirt cost per cubic yard?

$8–$25 per cubic yard delivered in 2026, with most homeowners paying about $12–$15 for clean unscreened fill (HelloGravel). Angi's 2026 type table is more precise: unscreened $8–$15, screened $12–$20, structural $15–$25 and specialty blends $18–$25. HomeGuide's overall range is $5–$25 and Lawn Love's is $6–$17. All are planning estimates — compare delivered totals, not headline rates, because delivery and minimums change the real price.

How much does a truckload of fill dirt cost?

A full 10–15 cubic yard dump-truck load runs $150–$600 delivered (HomeBuild Atlas); HomeGuide puts a 10–14 yard load at $150–$400 delivered. Delivery itself is usually a flat $50–$150 per drop, often waived on orders of 10 yards or more within about 10 miles. Remember the truck is a weight limit too: a full 12-yard tri-axle load of mixed fill weighs about 14.66 tons.

How many cubic yards of fill dirt do I need?

Multiply area in square feet by depth in inches and divide by 324, then add a compaction allowance — 10–15% for sandy fill, 15–20% for mixed fill, 20–25% for clay-heavy fill. A 20 × 30 ft low spot raised 6 in needs 11.11 yards net and 12.78 yards ordered. One yard covers 108 sq ft at 3 in deep, 54 sq ft at 6 in and 27 sq ft at 12 in. Run your exact area and depth through our fill dirt calculator before ordering.

How much does a cubic yard of fill dirt weigh?

About 1.0–1.4 US tons per cubic yard dry-to-moist — it is a range, not one number, because density varies with soil type and moisture. This site's calculator presets are sandy/loose 1.10 tons per yard (1,300 kg/m³), mixed/typical 1.22 tons (1,450 kg/m³, the default) and clay-heavy/wet 1.35 tons (1,600 kg/m³); wet clay can reach about 1.5 tons. If your supplier prices by the ton, ask for their tons-per-yard figure — the scale ticket beats any preset.

Is fill dirt the same as topsoil?

No. Fill dirt is low-organic subsoil for raising grade and backfilling; topsoil is the organic surface layer for planting. Nothing grows well in fill dirt, and topsoil is too soft and too expensive for structural fill. Fill costs $8–$25 a yard delivered; screened topsoil costs $25–$55. Most jobs need both: fill to raise the grade, then 4–6 in of topsoil on top for a lawn, or 12 in for a raised bed.

How long does fill dirt take to settle?

Typically 3–12 months, depending on soil type and compaction: sandy soils stabilise in roughly 3–6 months, clay soils can take 12 months or more, and most settlement happens in the first few months. Properly compacted fill settles faster and less than uncompacted fill, which is why deep fills should be built in 6–8 in compacted lifts. Do not lay a slab, driveway or finished lawn over fresh, uncompacted fill — and fill under anything structural needs an engineer's specification and compaction testing, not a rule of thumb.